A new Coordinate Geometry point numbering convention is to be implemented on all new projects starting after 2/22/02. This point numbering scheme is for all DOT users and Engineering Consultant firms who use Geopak to complete TIP
|
Unit / Branch |
Number Sequence |
|
Location and Surveys |
1 – 5000 |
|
Construction Unit |
5001 - 10000 |
|
Photogrammetry |
10001 - 15000 |
|
Roadway Design |
15001 - 20000 |
|
Hydraulics |
20001 - 25000 |
|
Structure Design |
25001 - 30000 |
|
Geotechnical |
30001 - 35000 |
|
Design Services |
35001 - 40000 |
|
Traffic Engineering |
40001 - 45000 |
|
Roadside Environmental |
45001 - 50000 |
Consultants who are working on a DOT project should use the set of numbers assigned to the Unit that contracted the work. (For example, consultants contracted by Location and Surveys would use point numbers 1 – 5000). If a consultant receives a file from a contracting DOT Unit, they should use the "List Point" command in Geopak Coordinate Geometry to see the point numbers previously used by the Unit and what point numbers are available for their use.
This change will make it possible at some later date to merge all point information for a project into one Geopak database (GPK) file. Each Unit will name their GPK file beginning with the word "JOB" followed by the assigned initials of their Unit. (I.e. Location and Surveys would name their GPK file "JOBLS.GPK".
|