spacer spacer   spacer   spacer   spacer  
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
 
spacer
 
Travel Information   |    Employment Opportunities   |    Small Business Enterprise (SBE)  
spacer
open spacer spacer
spacer SITE INFORMATION spacer
spacer
spacer spacer spacer
spacer Welcome
spacer
Departments
spacer
spacer Bid Requests
spacer Bid Results

spacer
spacer Projects
spacer
spacer FAQ
spacer
Contact Us
spacer
spacer Links
spacer
spacer Disclaimer
spacer
spacer spacer
spacer
spacer
spacer
spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer
  HOME
spacer
spacer spacer  
Projects


Greenville Southwest Bypass Study

Greenville Southwest Bypass Study
NCDOT is preparing an engineering and environmental study to ease existing and anticipated traffic congestion on NC 11 (Memorial Drive) and Stantonsburg Road (SR 1467 and US 264 Business) through portions of Pitt County, Greenville. This study includes evaluating improvements to the existing roadways, reviewing new roadway corridors, and preparing preliminary engineering, traffic analysis, environmental evaluations, and Environmental Document.

At this website, you can view/download the latest Public Information Newsletters, learn of any upcoming Citizens Informational Workshops, be added to the mailing list, view the schedule and completed tasks involved with this project, and much more.

US 17 Washington Bypass

US 17 Washington Bypass
The U.S. 17 Washington Bypass will be constructed to relieve traffic congestion on existing U.S. 17.

US 70 Corridor

US 70 Corridor
The North Carolina Department of Transportation is currently undertaking multiple activites to improve passenger and freight movement along the US 70 Corridor from Raleigh to the State Port at Morehead City.

Division Two - Construction Progress Report

Division Two - Construction Progress Report
The Construction Progress Report contains information about highway construction contracts that are awarded by the Board of Transportation. Although the file is updated nightly from the Construction Management System, portions of the information regarding specific contract are updated only when progress payments are made to the contractor. The “Last Estimate Thru Date” reflects the date through which the last update was made for a contract. When a construction contract is completed, information regarding the contract is no longer available through the Construction Progress Report.

For additional information regarding construction contracts, contact the Resident Engineer at the telephone number provided in the Construction Progress Report or contact Division Two's Construction Unit.


More about the Transportation Improvement Program (TIP)