| Local Government | DESCRIPTION | PRE-BID CONFERENCE | BID OPENING |
|---|---|---|---|
| Carrboro | Town of Carrboro Bus Shelter installation project | 12/01/09 2:00 PM | |
| High Point | Environmental planning and preliminary engineering for the modification or replacement of the interchange of US 311 (future I-74) and NC 68 (Eastchester Drive) | 12/04/09 5:00 PM | |
| Orange Co. | Twin Creeks Greenway (please note the date for the pre-bid conference changed from Nov. 10th to Nov. 5th) | 11/05/09 2:00 PM | 11/19/09 3:00 PM |
Bid Descriptions will open with Adobe Acrobat.
If you do not have Adobe Acrobat you may Download it Now.