Pipe Installation & Maintenance of 54" and Larger

BRG 190
161080083


This Procedural Training Guide will provide the trainee with information needed to install, compute length and perform maintenance of 54" pipe or larger. The following topics are covered: Safety, pipe installation, pipe installation standards, camber calculations, pipe length calculations, pipe maintenance, Instructor's Guide, and Certification Test. This guide is designed to be used as a self-study guide. The instructor should also provide the necessary test for certification.
 
 
NCDOT employees may obtain this guide from the Central Equipment and Inventory Control Computerized Requisition Program accessible through SAP R/3.