In order to enter the Density, the correct material must be present on the Contract Bill of Materials (CBOM).
The Material Type and Materials used for Densities are:
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Here's how to enter an Embankment Density in HiCAMS:
a. On the Review Contract BOM window, enter/select your contract number.
b. Select the Line Item for which the densities are being entered. The Line Item will generally be Borrow Excavation, Unclassified Excavation, or Grading.
c. Confirm that the material "Borrow Excavation" or "Unclassified Excavation" is assigned to the line item.
d. If the material is not present, click the insert button and add either of the materials from step c.
e. Save.
Here's how to enter an Subgrade Density in HiCAMS:
a. On the Review Contract BOM window, enter/select your contract number.
b. Select the Line Item for which the densities are being entered. The Line Item will generally be Grading or Fine Grading.
c. Confirm that the correct Subgrade Material from the table above is assigned to the line item.
d. If the material is not present, click the insert button and add the correct material.
e. Save.
For additional information about this topic, please contact Randy Pace or Francine Ward at 919-733-7091 or Marie Novello at 919-733-2210.
---
Created 20090608