The Review Estimates window has been updated to correct a window problem introduced by the BSIP process. The window functionality has been corrected to prevent flickering after the Approve button is clicked.
A correction has been made to the Material Prepayment functionality on the Review Estimates window to enable an Actual Reduction percentage to be entered. Previously, this field was disabled.
BSIP Related: The Estimate approval process has been modified to check that the contract has been set up in Fiscal and that there are no outstanding contract changes (Supplemental Agreements) prior to allowing the Estimate to be approved for payment.
A change was made to the Review Estimate functionality to correct a problem with merging work orders when the source work order contained outstanding MPP balances. Performing a work order merge in this situation was causing estimates to display a negative balance. The changes to the estimate functionality involve the following:
A correction was made to the CCU Estimate approval process to remove the ability to approve the same estimate twice.
A modification has been made to the Review Estimate process to restrict the Interrupt button availability to users in the office location of the contract, the division of the contract or CCU.
The Generate Estimate process has been modified to respond to changes in the function code assignments after the estimate process has been completed. HiCAMS will back out any changes from the old function code totals and add them back into the new function code totals.
An Interrupt button has been added to notify BSIP a user has requested that a payment be withdrawn.
If the payment is successfully stopped, the Estimate Status will become Pending CCU Approval. The user must then contact the Construction Unit and have the Estimate rejected back to the RE office. Users will then be able to modify the Estimate and re-generate/approve etc.
If the Payment could not be stopped, the HiCAMS user requesting the Interrupt will be notified and the Estimate will continue its processing. Payment issues will have to be corrected on subsequent estimates.
Estimates that were PROCESSED prior to Version 5.5.1 have had their status set to PAID and a history record has been created.
The Review Estimates window has been revised to ensure the validity of the Estimated Complete Date on the General Tab prior to forwarding an Estimate. The date information must be entered prior to forwarding, which also applies to Partial Estimates.
The label Less Anticipated Liq Damages has been changed to Less Assessed Liq Damages on the Totals and Work Order Tabs of the window and on the Estimate Reports.
A date greater than today's date can no longer be entered in the Received Date field for the Final Estimate Documents on the Completion Tab.
Payment Interrupt functionality has been added and is currently unavailable until future implementation of BSIP.
The calculation of Estimate Totals at the Function Code level has been implemented for the future implementation of BSIP.
The calculation of the Interest Due Date has been added to the Completion Tab of the Review Estimate and Contract Details windows. This calculation is based on the relationship between the Latest Document Received Date, the Contractor Notification Date, and the Acceptance Date as defined in Section 109-11 of the Standard Specifications.
The internal sequencing of the Tabs on the window have been modified to correct the loss of Comments. To ensure that Comments are always retained, it is suggested that
Damages Tab: Updates to the Pro Rata/Winter Weather days for a Contract Time are now stored on the Estimate where the change was made. Updates made on subsequent Estimates do not change what was input on a processed Estimate.
Final Estimates: Changed the Pro Rata/Spec 108-10 Days error message to say Pro Rata and Winter Weather days so that the error message matches the window column headings.
Notifications have been added when Estimates are in a Pending status and have not been forwarded to the next level or Approved. The Notifications will be sent 7 and 14 days past when the Estimate most recently attained this Pending status. An Estimate Pending RE Approval will have notifications sent to the Resident Engineer and the Project Engineer. An Estimate Pending CCU Approval will have notifications sent to the Resident Engineer, the Project Engineer, and the Estimate Processing Technician.
Added a Totals column to the Estimate Report. This corresponds to the Total column on the Review Estimates Totals Tab.
Prepayments Tab: System calculated negative reductions (increases) have been removed that occurred when an Adjust entry had been made to a Pay Record.
Pay Factors: Added for Version 5.2. Provides a list by line item showing Current Quantity, Pay Factor Percentage, and Adjusted Unit Price.
The Contract Monthly Estimate Report for Contractors now contains Fuel Price Adjustment data to display current quantity information.
An error message now appears if the Percent Complete exceeds 100% when the amount of the Overruns/Underruns is entered incorrectly. (Overruns and Underruns are excluded when calculating Percent Complete - therefore Percent Complete cannot exceed 100%). If there are no Overruns/Underruns entered, and the calculated Percent Complete exceeds 100% because of an error in Contract Tracking data entry, the same error message will appear when the user tries to forward the estimate.
Added the Escrow tab. For Contracts with Escrow Agents, CCU will be able to edit the Current Amount to Trust.
The Estimate Report with Work Orders now displays the correct amount in the Total Amount column for items such as the AC Adjustment Line Items.
Corrected the discrepancy of Balance and Current Balance totals on the Review Estimates - Prepayment tab by changing the calculations in the Review Estimates window to round to 3 digits instead of 2. The Current Balance total had been rounded up and the Balance total had been the actual amount.
Added a checkbox Show Full Item Descriptions to both Estimate Reports. Checking this box allows the user to view the complete descriptions entered for Pay Factors, Material Prepayments, etc.
The floating information displayed when the top grid is double-clicked now includes Work Order, Federal Aid No., Resident Engineer, Project Engineer, Administrative Division, Bid Amount, Availability Date, Completion Date, and Revised Completion Date.
A warning message has been added to the forwarding process when the Thru Date is greater than the current date.
The Current Days Used field will now reset correctly when regenerating a zero day estimate.
Default Retainage displays as 2.00% or 5.00% not 0.05%.
Tabbing out of the Retainage Percent field on the Review Estimates window will no longer cause the system to prompt "Do you want to save changes?"
The system will now reset the Retainage Percent back to 5.00% when an error in the estimate totals caused the percent to be automatically reduced to 2.00%.
The system will refresh the estimate windows when the estimate status is changed due to modifications to associated Tickets, Pay Records or Adjustments, and both the Estimate and Contract Tracking windows are open at the same time.
Perfomance tuning was done in the Review Estimates window.
The footer in the Estimate Report has been modified to no longer use a subreport, instead text objects have been added to each report. This corrects the problems with printing this report on the HP Desk Jet 970 cxi or the HP 1120c series printers.
Due to a change in policy, HiCAMS will set the contract Retainage to 0% on federally funded contracts that are passed from Design Services to HiCAMS on or after the August letting date (8/15/2000).
Made the following changes to the Estimate Report cover sheet and work order breakdown.
Changed the Estimate to Date label to Contract Line Items
Changed the Fuel Adjustment to Date label to Fuel Adjustments
Added the field Total Estimate which is a total of Contract Line Items +Material Prepayments + Fuel Adjustments
If there is an Escrow Agent, the escrow agent's name and address will appear on the Estimate Report.
The Current Retainage is now calculating properly when a user reduces a Material Prepayment on the Payment tab on the Review Estimate window.
The Material Prepayment Current Quantity is now working correctly on the Review Estimate window and MPP Tab.
You no longer receive an application error when you approve an estimate.
Now, the Estimate Report prints correctly on all printers.
If a contract has no escrow information, the Estimate Report displays zeros in the Trust Data fields.
If you select a contract which has no estimates, the work order information from the previous selection is refreshed.
TIP Numbers now appear in front of the Contract Description on the Estimates report.
Contract Location now appears after the Contract Description on the Estimates report.
The Unit Price now displays up to 4 decimal places on the Prepayments tab on the Review Estimates window.
Sort order on the History tab displays the most recent action first.
The Estimates report now displays 4 decimal places on all unit prices.
Total Estimate to Date now reads Estimate to Date.
The Estimates Report now reads Amount Due this Estimate instead of Amount Due This Estimate.
Now you can Review Estimates for completed contracts.
The Estimates Report no longer shows lump sum items with a quantity of 1 as an overrun.
Word wrap is now available on the Estimate comment box.
The job title on the Estimates Report now reads State Construction Engineer instead of State Highway Construction Engineer.
The Estimates Report now displays the Administrative Division, not the Physical Division.
You can Review, Adjust and Process Monthly Estimates.