Concrete Placement

BRG 567
161080102


This Procedure Training Manual will provide the trainee with information needed to perform Concrete Placement. The following topics will be covered: Safety, Site Preparation, Transporting, Consolidating, Finished Concrete Surface, Curing, Form Removal, and Formed Face Finish. This manual can be used as a self-study manual. There should be an instructor assigned who has experience in the Concrete Placement.
 
 
NCDOT employees may obtain this guide from the Central Equipment and Inventory Control Computerized Requisition Program accessible through SAP R/3.