spacer spacer   spacer   spacer   spacer  
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
 
spacer
 
 
spacer
open spacer spacer
spacer ONLINE NAVIGATION spacer
spacer
spacer spacer spacer
M&T Work Groups
spacer
spacer 2008 Training Schedule
spacer
spacer Approved Lists
spacer
spacer Electronic Forms
spacer
spacer Minimum Sampling Guide
spacer
spacer Online Standards
spacer
HiCAMS Information
spacer
Links
spacer
spacer spacer
spacer
spacer
spacer
spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer
   HOME  »   HiCAMS M&T FAQs
spacer
spacer spacer  
HiCAMS M&T FAQs

1. WILL HiCAMS VERSION 6.1 AND DOH VENDOR VERSION 3.8 WORK IN WINDOWS 95 AND 98?
Computers with Windows 95 and Windows 98 will no longer be able to use the software or have the upgraded versions installed. HiCAMS 6.1 and DOH Vendor 3.8 will only be operable on computers with Windows 2000 and higher installed on them.

2. Each component is received individually.
The Contract Line Item for Structural Steel will include the 5 items.
  • Structrual Steel - English/Metric - The quanitities will be listed on the line item of the contact. For Example "Approx... LBS Structural Steel - 796,000 LBS.
  • Bolts, High Strength - Both - The quantities will be listed for each structure on the shop drawings which the Resident Engineer gets.
  • Nuts - Both - The quantities will be listed for each structure on the shop drawings with the Resident Engineer gets.
  • Washers - Both - The quantities will be listed for each structure on the shop drawings which the Resident Engineer gets.
  • Direct Tension Indicators - The quantities will be listed for each structure on the shop drawings which the Resident Engineer gets.
It should be noted that if there are multiple structures there will be approved shop drawing for each. The total number will be the sum of each structure. There is a Bill Of Materials that list the bolts, nuts,washers and DTI's for each structure. If all the shop drawings are not provided at once, then the Conversion factor will have to be updated as they are received or paid for.

Since the line item is a lump sum item the conversion factor will be the actual number of bolts, nuts etc. (It should be a large number.)


3. TEST FORMATS: AEMicroDeval and AMMicroDeval CONVERTING TEXT INTO DATE FORMAT WHEN ENTERING LAB NUMBER
Field is converting "07-083" to "7/1/1983". There is an issue with Excel/FormulaOne software that cannot be overcome. User must use the work around provided.

WORKAROUND:

  • Enter a dot (.) at the end of the lab number (07-083.) to prevent the conversion, or type '07-083 and it will show the lab number without the apostrophe at the beginning.