spacer spacer   spacer   spacer   spacer  
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
 
spacer
 


DISCLAIMER

No warranty is made by the North Carolina Department of Transportation (NCDOT) or the Federal Highway Administration
as to the accuracy, reliability of the version of the Preliminary Information provided here. This document is available for the user's convenience.





  WELCOME
spacer  
Please click on the link below so that you can request the Available Preliminary Information. Please type in your contact information so that we can provide you with this information.




    Design Build
  • B-2500 Preliminary Information

  • Included Documents
    B-2500 General Drawings.............................................................. 03/20/07 & 05/07/99
    Location Surveys.............................................................. May 25, 2008
    Pictures from workshop (various .jpg photos).......................... July, 2006
    Geotechnical Design Build Inventory Memo................................ May 5, 2008
    Geotechnical Report - Bridge Foundation Investigation............. September 21, 1988
    Geotechnical Unit Boring Log (Bonner Bridge over Oregon Inlet)...... April 4, 1989
    Geotechnical Unit Boring Log (Terminal Groin at Oregon Inlet)........ May 24, 1989
    Map of Proposed Oregon Inlet Bridge Alignment.................................... n/a
    Method II Vessel Impact Study.pdf.............................................................. March 6, 1996
    Oregon Inlet Bridge Pile Penetration.............................................................. April 5, 12, & 13, 1978
    Oregon Inlet Bridge Profile East Side.............................................................. March 23, 1978 & April 5, 1978
    Oregon Inlet Bridge Profile West Side.............................................................. March 23, 1978 & April 5, 1978
    Oregon Inlet Terminal Groin General Layout........................................ n/a
    Oregon Inlet Terminal Groin Profiles & Transition Plan ............................. n/a
    Oregon Inlet Terminal Groin Title Sheet........................................ n/a
    Oregon Inlet Terminal Groin Typical Sections............................................. n/a
    Structure Foundation Investigation Report........................................... September 18, 1996
    Subsurface Investigation between Bent 165 & Bent 182 (drawing)................ n/a
    Subsurface Investigation between Bent 166 and Bent 182 (report)............... September 20, 1978
    Subsurface Investigation between Bent 182 & Bent 2 (drawing)......... April, 1978
    Subsurface Investigation between Bent 182 & Bent 2 (report)........... May 2, 1978
 
North Carolina DOT Logo   The North Carolina
Department of Transportation