RETAINING WALLS
- STANDARD GRAVITY RETAINING WALL (453.01)
- SOLDIER PILE RETAINING WALL TYPICAL SECTIONS & NOTES (CELL)
STANDARD SHORING
- STANDARD TEMPORARY SHORING (1801.01)
- STANDARD TEMPORARY MECHANICALLY STABILIZED EARTH (MSE) WALLS (1801.02)
- STANDARD TEMPORARY MSE WALL REINFORCEMENT TABLES - ENGLISH UNITS (1801.02)
- STANDARD TEMPORARY MSE WALL REINFORCEMENT TABLES - METRIC UNITS (1801.02)
- TEMPORARY FABRIC WALL (1801.02)
- HILFIKER TEMPORARY WALL (1801.02)
- SIERRASCAPE TEMPORARY WALL (1801.02)
- RETAINED EARTH TEMPORARY WALL (1801.02)
- TERRATREL TEMPORARY WALL (1801.02)
ROCK PLATING METAL POLE FOUNDATIONS DRILLED PIER
- CASING INSPECTION FORM
- SLURRY INSPECTION FORM
- DRILLING LOG
- SHAFT INSPECTION DEVICE (SID) FORM
- CONCRETE CURVE
- DRILLED PIER INTEGRITY TESTING PREPARATION
- DRILLED PIER INSPECTION MANUAL
BEARING PILES
|
Questions concerning the Geotechnical Engineering Website should go to Scott Webb (919) 250-4088 ext. 235 |