|
AGENDA FOR GEOENVIRONMENTAL PRESENTATIONS |
|||
|
Schedule of Events |
|||
|
|||
|
Thursday – April 12 |
|||
|
Check |
PDH |
Schedule |
Description |
|
Box |
|||
|
07:30 am – 08:15 am |
Breakfast |
||
|
08:15 am – 08:30 am |
Introduction Combined Session I (8:30 am – 10:00 am) Moderator – |
||
|
0.5 |
08:30 am – 09:00 am |
See Combined Session Under Geotech Agenda |
|
|
0.5 |
09:00 am – 09:30 am |
See Combined Session Under Geotech Agenda |
|
|
0.5 |
09:30 am – 10:00 am |
See Combined Session Under Geotech Agenda |
|
|
10:00 am – 10:30 am |
Break |
||
|
Combined Session II (10:30 am – 12:00 pm) Moderator – |
|||
|
0.5 |
10:30 am – 11:00 am |
See Combined Session Under Geotech Agenda |
|
|
0.5 |
11:00 am – 11:30 am |
See Combined Session Under Geotech Agenda |
|
|
0.5 |
11:30 am – 12:00 pm |
See Combined Session Under Geotech Agenda
|
|
|
1.0 |
12:15 pm – 01:30 pm |
Lunch and Lunch Presentation GeoPhysics Session I (1:30 pm – 3:00 pm) Moderator – TBA |
|
|
0.5 |
01:30 pm – 02:00 pm |
Using GPR to Understand Void Sizes Beneath Concrete Pavement at the Cumberland Tunnel Brad Rister |
|
|
0.5 |
02:00 pm – 02:30 pm |
Falling Weight Deflectometers Integrated with Ground Penetrating Radar Robert Parillo |
|
|
0.5 |
02:30 pm – 03:00 pm |
Earthquake Site Response Analyses Based on Vs Profiles From Surface Wave Methods Duane Bents and William Camp |
|
|
03:00 pm – 03:30 pm |
Break GeoPhysics/Geotechnical Session II (3:30 pm – 5:00 pm) Moderator – TBA |
||
|
0.5 |
03:30 pm – 04:00 pm |
|
|
|
0.5 |
04:00 pm – 04:30 pm |
Sonar Calipering of Slurry Constructed Drilled Shafts: Providing Quality Assurance and Quality Control John Hayes |
|
|
0.5 |
04:30 pm – 05:00 pm |
A Five Year Summary of Crosshole Sonic Logging of Southe Carolina Drilled Shafts W.M. Camp, D.W. Holley and G.J. Canivan |
|
|
05:30 pm – 06:30 pm |
Social Hour |
||
|
AGENDA FOR GEOENVIRONMENTAL PRESENTATIONS |
|
Friday – April 13 |
|||
|
Check |
PDH |
Schedule |
Description |
|
Box |
|||
|
07:30 am – 08:30 am |
Breakfast GeoEnvironmental Session I (8:30am – 10:00 am) Moderator – John M. Stewart, CPG, PG |
||
|
0.5 |
08:30 am – 09:00 am |
What Lurks Beneath the Surface? or Integrating Geophysical Studies into Environmental Investigations Sheri Knox, Dottie Schmitt, Doug Canavello, and Mark Denil |
|
|
0.5 |
09:00 am – 09:30 am |
Changes to Underground Storage Tank Section Guidance Documents Karen Harmon |
|
|
0.5 |
09:30am – 10:00 am |
Performance Modeling and Optimization of Contaminant Extraction Using Prefabricated Verticle Wells (PVWs) Nadia Sharmin, Tanya Kunberger, and M.A. Gabr |
|
|
10:00 am – 10:30 am |
Break GeoEnvironmental Session II (10:30 am – 12:00 pm)Moderator – Sheri Knox, PE |
||
|
0.5 |
10:30 am – 11:00 am |
SPCC Update for DOT and Contractor Facilities Ivan A. Cooper and Mark Fox |
|
|
0.5 |
11:00 am – 11:30 am |
Urgent Transportation Needs of Boomburgs William T. Rice II |
|
|
0.5 |
11:30am – 12:00 pm |
NCDOT Chemical Testing Laboratory Christopher A. Peoples |
|
|
0.5 |
11:30am – 12:00 pm |
NCDOT GIS Data Distribution Ray Chilcote |
|