|
AGENDA FOR GEOTECHNICAL PRESENTATIONS |
|||
|
Schedule of Events |
|||
|
|||
|
Thursday – April 12 |
|||
|
Check |
PDH |
Schedule |
Description |
|
Box |
|||
|
07:30 am – 08:15 am |
Breakfast |
||
|
08:15 am – 08:30 am |
Introduction Combined Session I (8:30 am – 10:00 am) Moderator – TBA |
||
|
0.5 |
08:30 am – 09:00 am |
Landslides and Landslide Hazard Mapping in Macon Country, North Carolina Richard Wooten, Rebecca Latham, Anne Witt, Stephen Fuemmeler, Kenneth Gillon, Thomas Douglas and Jennifer Bauer |
|
|
0.5 |
09:00 am – 09:30 am |
The Long Road to Building a Road: Highway Project Planning in North Carolina Steve Brown and Eugene Tarascio |
|
|
0.5 |
09:30 am – 10:00 am |
Spatially Enabling Geotechnical Data Ray Chilcote |
|
|
10:00 am – 10:30 am |
Break |
||
|
Combined Session II (10:30 am – 12:00 pm) Moderator – Bob Goldstone |
|||
|
0.5 |
10:30 am – 11:00 am |
Slope Stability Along the North Carolina Section of the Blue Ridge Parkway Rebecca Latham and Richard Wooten |
|
|
0.5 |
11:00 am – 11:30 am |
Case Study: Ground Penetrating Radar Study to Investigate the Historic Road Construction of NC 158 in Elizabeth City, NC Kate McKinley |
|
|
0.5 |
11:30 am – 12:00 pm |
Integrating Geophysics and Engineering Using Mine Subsidence Mitigation for Highway Projects Kanaan Hanna and Jim Pfeiffer
|
|
|
1.0 |
12:15 pm – 01:30 pm |
Lunch and Lunch Presentation GeoTechnical Session I (1:30 pm – 3:00 pm) Moderator – TBA |
|
|
0.5 |
01:30 pm – 02:00 pm |
Proposed NCDOT MSE Retaining Wall Policy and Special Provision Scott Hidden |
|
|
0.5 |
02:00 pm – 02:30 pm |
Temporary Shoring Revision and Expansion to Include MSE Walls Scott Webb |
|
|
0.5 |
02:30 pm – 03:00 pm |
Estimation of Earth Pressure for Piedmont Residual Soils- A Second Year Update J. Brian Anderson, Vincent Ogunro and Richard Burrage |
|
|
03:00 pm – 03:30 pm |
Break GeoTechnical Session II (3:30 pm – 5:00 pm) Moderator – |
||
|
0.5 |
03:30 pm – 04:00 pm |
Durability of Galvanized MSE Soil Reinforcements: 30+ Years of NCDOT and Other Experience Robert Gladstone, Peter Anderson, Kenneth Fishman and James Withiam |
|
|
0.5 |
04:00 pm – 04:30 pm |
Temperature Controls on Subgrade Stabilization John Daniels |
|
|
0.5 |
04:30 pm – 05:00 pm |
Design and Construction of Soil Nailed Excavation Support without Concrete Facing Bon Lien |
|
|
05:30 pm – 06:30 pm |
Social Hour | ||
|
AGENDA FOR GEOTECHNICAL PRESENTATIONS |
|
Friday – April 13 |
|||
|
Check |
PDH |
Schedule |
Description |
|
Box |
|||
|
07:30 am – 08:30 am |
Breakfast GeoTechnical Session III (8:30am – 10:00 am) Moderator – TBA |
||
|
0.5 |
08:30 am – 09:00 am |
Deformation-Resistance Model for Geogrid Reinforced Unpaved Road Jianjun Leng |
|
|
0.5 |
09:00 am – 09:30 am |
Geosynthetics in Pavements: A Progress Report Kimberly Warren |
|
|
0.5 |
09:30am – 10:00 am |
Limit Equilibrium and Deformation Analyses of a Geogrid Reinforced Embankment Young Jin Park, Mohammed Gabr, Roy Borden, Kyung Jun Kim and Christopher Kreider |
|
|
10:00 am – 10:30 am |
Break GeoTechnical Session IV (10:30 am – 12:0 pm) Moderator – TBA |
||
|
0.5 |
10:30 am – 11:00 am |
Prediction of Peak Particle Velocities on the Ground Surface due to Pile Driving Brent Robinson |
|
|
0.5 |
11:00 am – 11:30 am |
Measured Soil Setup of Steel HP Piles form Windsor Bypass Project in North Carolina Kyung Jun Kim and Christopher Kreider |
|
|
0.5 |
11:30am – 12:00 pm |
BioWall Bob Barrett |
|
|
0.5 |
12:00am – 12:30 pm |
Cold Weather Portland Cement Stabilization: Is It Possible? Tim McConnell |
|