STANDARD PRECAST GRAVITY WALL NOTES ON PLANS 2-16-10 (Instructions for use are in parenthesis after each note if applicable and choices are in parenthesis separated by "or".) FOR PRECAST GRAVITY RETAINING WALLS, SEE PRECAST GRAVITY RETAINING WALLS PROVISION. FOR GUARDRAIL, SEE ROADWAY PLANS AND SECTION 862 OF THE STANDARD SPECIFICATIONS. FOR SINGLE FACED PRECAST CONCRETE BARRIER, SEE ROADWAY PLANS AND SECTION 857 OF THE STANDARD SPECIFICATIONS. A CONCRETE BARRIER RAIL WITH A MOMENT SLAB IS REQUIRED ABOVE RETAINING WALL NO. ____. SEE PLANS AND PRECAST GRAVITY RETAINING WALLS PROVISION FOR DETAILS OF A CONCRETE BARRIER RAIL WITH A MOMENT SLAB. (Structure Design will add a plan sheet for a concrete barrier rail with a moment slab to the wall plans when required.) A FENCE OR HAND RAIL IS REQUIRED ON TOP OF RETAINING WALL NO. ____. SEE ROADWAY PLANS FOR FENCE OR HAND RAIL ATTACHMENT DETAILS. USE PRECAST CONCRETE UNITS WITH A ____________ FACE FOR RETAINING WALL NO. ____. USE PRECAST CONCRETE UNITS WITH A ____________ COLOR FOR RETAINING WALL NO. ____. A SUBDRAIN PIPE (IS or IS NOT) REQUIRED FOR RETAINING WALL NO. ____. BEFORE BEGINNING PRECAST GRAVITY WALL DESIGN FOR RETAINING WALL NO. ____, SURVEY EXISTING GROUND ELEVATIONS SHOWN ON THE WALL PROFILE VIEW (WALL ENVELOPE) AND SUBMIT A REVISED WALL ENVELOPE FOR REVIEW. DO NOT START WALL DESIGN OR CONSTRUCTION UNTIL THIS ENVELOPE IS ACCEPTED. (Use this note when existing ground line is in the vicinity of wall elevations.) DESIGN RETAINING WALL NO. ____ FOR WALL HEIGHTS EQUAL TO THE DESIGN HEIGHT PLUS DEPTH TO TOP OF FOOTING (DIFFERENCE BETWEEN GRADE ELEVATION AND TOP OF FOOTING ELEVATION). DESIGN RETAINING WALL NO. ____ FOR THE FOLLOWING: 1) MINIMUM SERVICE LIFE = (75 or 100) YEARS 2) ALLOWABLE BEARING CAPACITY = ____ PSF (kPa) 3) MINIMUM EMBEDMENT ELEVATION = ____ FT (m) 4) IN-SITU ASSUMED MATERIAL PARAMETERS: MATERIAL TYPE UNIT WEIGHT FRICTION COHESION (c) (gamma) ANGLE (phi) PSF (kPa) PCF (kN/m3) DEGREES BACKFILL ___ __ ___ FOUNDATION ___ __ ___ (For minimum service life, use 100 years for critical precast gravity walls as defined by the MSE wall policy and 75 years for all other precast gravity walls. Modify numbers 2 and 4 as necessary for variable wall heights and subsurface conditions. Number 3 is optional. Default minimum embedment in provision is 2 ft [0.6 m]. Use No. 3 when more than the minimum embedment is necessary such as precast gravity walls subject to scour.) THE MINIMUM EMBEDMENT ELEVATION FOR RETAINING WALL NO. ____ INCLUDES EMBEDMENT FOR SCOUR. DESIGN RETAINING WALL NO. ____ FOR A LIVE LOAD (TRAFFIC) SURCHARGE. DESIGN RETAINING WALL NO. ____ FOR THE (POINT, LINE or STRIP) SURCHARGE LOAD SHOWN. DESIGN RETAINING WALL NO. ____ FOR A PIPE EXTENDING THROUGH THE WALL AS SHOWN. VERIFY PIPE LOCATION AND ELEVATION BEFORE BEGINNING PRECAST GRAVITY WALL DESIGN OR CONSTRUCTION. ADJUST PAVED DITCH WIDTH OR BACK SLOPE FOR VARYING GRADE ELEVATIONS ALONG TOP OF RETAINING WALL NO. ____ AND SUBMIT A CAST-IN-PLACE CONCRETE DITCH DETAIL FOR REVIEW WHEN TOP OF WALL STEPS DOWN. DO NOT PLACE CONCRETE FOR FOOTINGS FOR RETAINING WALL NO. ____ UNTIL OBTAINING APPROVAL OF THE EXCAVATION DEPTH AND FOUNDATION MATERIAL. “TEMPORARY SHORING” (IS or MAY BE) REQUIRED FOR RETAINING WALL NO. ____ IN ACCORDANCE WITH THE TEMPORARY SHORING PROVISION. SEE (ROADWAY, STRUCTURE or TRAFFIC CONTROL) PLANS. AT THE CONTRACTOR'S OPTION, “TEMPORARY SHORING FOR WALL CONSTRUCTION” MAY BE USED TO CONSTRUCT RETAINING WALL NO. ____. SEE PRECAST GRAVITY RETAINING WALLS PROVISION FOR TEMPORARY SHORING FOR WALL CONSTRUCTION. (Use this note when temporary shoring is not shown on the plans or required by the Engineer but may be used for OSHA reasons or the Contractor's convenience. For example, when constructing a precast gravity wall in a cut and traffic is diverted away or the location is a new alignment, the Contractor may choose to use temporary shoring for wall construction in lieu of temporary slopes to excavate for the wall.)