STANDARD TEMPORARY SHORING NOTES ON PLANS 1-20-09 (Choices are in parenthesis separated by "or" and stations are optional if there is only one shoring location.) USE A 1.5:1 (H:V) SLOPE OR FLATTER IN LIEU OF TEMPORARY SHORING FROM STATION ____________, ________FT (m) __________, TO STATION ____________, ________FT (m) __________ AS SHOWN ON THE PLANS. FOR TEMPORARY SHORING, SEE TEMPORARY SHORING PROVISION. DO NOT USE STANDARD SHORING FROM STATION ____________, ________FT (m) __________, TO STATION ____________, ________FT (m) __________. DO NOT USE STANDARD TEMPORARY SHORING FROM STATION ____________, ________FT (m) __________, TO STATION ____________, ________FT (m) __________. DO NOT USE A TEMPORARY MSE WALL FROM STATION ____________, ________FT (m) __________, TO STATION ____________, ________FT (m) __________. USE A TEMPORARY MSE WALL FROM STATION ____________, ________FT (m) __________, TO STATION ____________, ________FT (m) __________. TEMPORARY SHORING IS REQUIRED FOR THE PIPE, DROP INLET OR UTILITY INSTALLATION FROM STATION ____________, ________FT (m) __________, TO STATION ____________, ________FT (m) __________. SEE TEMPORARY SHORING PROVISION. WHEN USING CONTRACTOR DESIGNED SHORING FROM STATION ____________, ________FT (m) __________, TO STATION ____________, ________FT (m) __________, DESIGN SHORING FOR THE FOLLOWING IN-SITU ASSUMED SOIL PARAMETERS: UNIT WEIGHT OF SOIL ABOVE WATER TABLE, gamma = _____ PCF (kN/m3) UNIT WEIGHT OF SOIL BELOW WATER TABLE, gamma = _____ PCF (kN/m3) FRICTION ANGLE, phi = _____ DEGREES COHESION, c = _____ PSF (kPa) DRIVEN PILING FOR TEMPORARY SHORING FROM STATION ____________, ________FT (m) __________, TO STATION ____________, ________FT (m) __________ (WILL or MAY) NOT PENETRATE BELOW ELEVATION ________ FT (m) DUE TO THE PRESENCE OF AN OBSTRUCTION, VERY DENSE OR HARD SOIL, WEATHERED OR HARD ROCK. IT MAY BE PREFERRED OR NECESSARY TO ANCHOR TEMPORARY SHORING FROM STATION ____________, ________FT (m) __________, TO STATION ____________, ________FT (m) __________. THE TEMPORARY SHORING PROVISION DOES NOT APPLY TO ANCHORED TEMPORARY SHORING. IF ANCHORED SHORING IS PROPOSED, SUBMIT WORKING DRAWINGS, DESIGN CALCULATIONS AND AN ANCHORED TEMPORARY SHORING PROVISION FOR REVIEW AND ACCEPTANCE IN ACCORDANCE WITH ARTICLE 105-2 OF THE STANDARD SPECIFICATIONS. or IT MAY BE PREFERRED OR NECESSARY TO ANCHOR TEMPORARY SHORING FROM STATION ____________, ________FT (m) __________, TO STATION ____________, ________FT (m) __________. (FOR ANCHORED TEMPORARY SHORING, SEE ANCHORED TEMPORARY SHORING PROVISION. and/or FOR TEMPORARY SOIL NAIL WALLS, SEE TEMPORARY SOIL NAIL WALLS PROVISION.) FOR CONTRACTOR DESIGNED SHORING, SURVEY THE SHORING LOCATION TO DETERMINE EXISTING ELEVATIONS AND ACTUAL DESIGN HEIGHTS BEFORE BEGINNING DESIGN. FOR PORTABLE CONCRETE BARRIERS ABOVE AND BEHIND TEMPORARY SHORING, USE AN NCDOT PORTABLE CONCRETE BARRIER (UNANCHORED OR ANCHORED) OR AN OREGON TALL F-SHAPE CONCRETE BARRIER IN ACCORDANCE WITH THE TRAFFIC CONTROL PLANS. (NO or LIMITED) SUBSURFACE INFORMATION IS AVAILABLE IN THE VICINITY OF THE TEMPORARY SHORING FROM STATION ____________, ________FT (m) __________, TO STATION ____________, ________FT (m) __________. THE INFORMATION PROVIDED FOR DESIGN WAS ASSUMED AND MAY NOT BE APPLICABLE TO THE ACTUAL SITE CONDITIONS ENCOUNTERED DURING CONSTRUCTION. WHEN BACKFILL FOR A ____________ (RETAINING WALL or REINFORCED BRIDGE APPROACH FILL) OVERLAPS WITH THE REINFORCED ZONE OF A TEMPORARY MSE WALL, USE EITHER SHORING BACKFILL OR THE MATERIAL SPECIFIED FOR THE ____________ (RETAINING WALL or REINFORCED BRIDGE APPROACH FILL), WHICHEVER IS BETTER, IN THE REINFORCED ZONE.