|   | Effective Date |
| STRUCTURE PROVISIONS AND NOTES |
  |
| PILE EXCAVATION PROVISION (LFD-ASD) |
7-18-06 |
| DRILLED PIERS PROVISION (LFD-ASD) |
2-20-07 |
| CROSSHOLE SONIC LOGGING PROVISION |
2-20-07 |
| PILE DRIVING ANALYZER PROVISION (LFD-ASD) |
2-20-07 |
| GROUT FOR STRUCTURES PROVISION |
10-16-07 |
| SUBMITTAL OF WORKING DRAWINGS PROVISION |
9-16-08 |
| DRILLED PIERS (LRFD) |
3-06-09 |
| PILES (LRFD) |
3-06-09 |
| STANDARD FOUNDATION NOTES |
9-15-09 |
| PILES (LFD-ASD) |
8-04-09 |
| ROADWAY PROVISIONS AND NOTES |
  |
| ENGINEERING FABRICS TABLE 1056-1 PROVISION (SP10 R40) |
7-18-06 |
| SHALLOW UNDERCUT PROVISION (SP2 R35) |
9-18-07 |
| TEMPORARY SHORING PROVISION (SP11 R02) |
9-25-07 |
| EMBANKMENTS PROVISION (SP2 R18) |
7-21-09 |
| ROCK PLATING PROVISION (SP2 R85) |
7-21-09 |
| FINE GRADING SUBGRADE, SHOULDERS AND DITCHES PROVISION (SP5 R01) |
7-21-09 |
| GEOTECHNICAL PROVISIONS AND NOTES |
  |
| SHOTCRETE PROVISION |
4-15-08 |
| STANDARD TEMPORARY SHORING NOTES |
1-20-09 |
| GRAVITY RETAINING WALLS PROVISION |
8-18-09 |
| SEGMENTAL GRAVITY RETAINING WALLS PROVISION (LFD-ASD) |
8-18-09 |
| STANDARD SEGMENTAL GRAVITY WALL NOTES (LFD-ASD) |
8-18-09 |
| ANCHORED RETAINING WALLS PROVISION (LRFD) |
2-16-10 |
| STANDARD ANCHORED WALL NOTES (LRFD) |
2-16-10 |
| MECHANICALLY STABILIZED EARTH RETAINING WALLS PROVISION (LFD-ASD) |
2-16-10 |
| STANDARD MSE WALL NOTES (LFD-ASD) |
2-16-10 |
| PRECAST GRAVITY RETAINING WALLS PROVISION (LFD-ASD) |
2-16-10 |
| STANDARD PRECAST GRAVITY WALL NOTES (LFD-ASD) |
2-16-10 |
| SOIL NAIL RETAINING WALLS PROVISION (LFD-ASD) |
2-16-10 |
| STANDARD SOIL NAIL WALL NOTES (LFD-ASD) |
2-16-10 |
| SOLDIER PILE RETAINING WALLS PROVISION (LRFD) |
2-16-10 |
| STANDARD SOLDIER PILE WALL NOTES (LRFD) |
2-16-10 |
| GEOTEXTILE FOR PAVEMENT STABILIZATION PROVISION |
2-16-10 |
| ROCK EMBANKMENTS PROVISION |
3-16-10 |