|   |
Effective Date |
| STRUCTURE PROVISIONS AND NOTES |
  |
| PILE EXCAVATION PROVISION (LFD-ASD) |
7-18-06 |
| DRILLED PIERS PROVISION (LFD-ASD) |
2-20-07 |
| CROSSHOLE SONIC LOGGING PROVISION |
2-20-07 |
| PILE DRIVING ANALYZER PROVISION (LFD-ASD) |
2-20-07 |
| GROUT FOR STRUCTURES PROVISION |
10-16-07 |
| SUBMITTAL OF WORKING DRAWINGS PROVISION |
9-16-08 |
| DRILLED PIERS (LRFD) |
9-16-08 |
| STANDARD FOUNDATION NOTES |
9-16-08 |
| PILES (LRFD) |
10-21-08 |
| ROADWAY PROVISIONS AND NOTES |
  |
| ENGINEERING FABRICS TABLE 1056-1 PROVISION (SP10R40) |
7-18-06 |
| SHALLOW UNDERCUT PROVISION (SP2R35) |
9-18-07 |
| TEMPORARY SHORING PROVISION (SP11R02) |
9-25-07 |
| GEOTECHNICAL PROVISIONS AND NOTES |
  |
| ROCK EMBANKMENTS PROVISION |
3-20-07 |
| STANDARD MSE RETAINING WALL NOTES |
12-18-07 |
| ROCK PLATING PROVISION |
3-18-08 |
| MECHANICALLY STABILIZED EARTH RETAINING WALLS PROVISION |
4-15-08 |
| SHOTCRETE PROVISION |
4-15-08 |
| SOIL NAIL RETAINING WALLS PROVISION |
12-16-08 |
| STANDARD SOIL NAIL RETAINING WALL NOTES |
12-16-08 |
| GRAVITY RETAINING WALLS |
12-16-08 |
| SOLDIER PILE RETAINING WALLS PROVISION |
12-16-08 |
| STANDARD SOLDIER PILE RETAINING WALL NOTES |
12-16-08 |
| STANDARD TEMPORARY SHORING NOTES |
1-20-09 |