spacer spacer   spacer   spacer   spacer  
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
 
spacer
 
MISSION   |    ORGANIZATION   |    PEF COORD   |    NCDOT Performance Dashboard
spacer
open spacer spacer
spacer SITE MAP spacer
spacer
spacer spacer spacer
Home spacer
Whats New (Roadway) spacer
Roadway Index spacer
Manuals, Standards, Checklist spacer
Memos & Minutes spacer
Merger 01 Process spacer
Criteria Files spacer
Q&A Forum spacer
STaRS spacer
Training spacer
DOT Directory spacer
Hearing Maps (PDF) spacer
NCDOT TIP spacer
Other Unit Links spacer
Roadway Dictionary spacer
Internal Use Only spacer
Support Forms spacer
Beacon Website spacer
DOT Email spacer
NCID spacer
DOT FTS spacer
Software Versions spacer
Motor Fleet Fuel Sites
spacer
spacer
spacer spacer
spacer
spacer
spacer
spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer
  HOME »  INDEX
spacer
spacer spacer  

Roadway CADD Project Log System

PURPOSE:

Through the life of a TIP project in Roadway Design, key project information and original data are constantly changing as electronic files are being transmitted to and received from other NCDOT Units. A system to record and organize pertinent project data and Roadway CADD structure is warranted. The Roadway CADD Project Log System is recommended to maintain a level of data organization and efficiency.


PROCEDURE:

It is recommended that a snap shot of the TIP project design data and Roadway CADD structure be taken at the following phases of plans production:

  • Functional/Preliminary (Hearing Maps Stage)
  • Hydraulic Design (Before plans are sent to Hydro.)
  • Right of Way Plans (After Hydraulic Plans and Before field inspections)
  • Final/Letting (Finalized set of plans after field inspection meetings)

DOWLNLOAD CADD PROJECT LOG SHEETS TEMPLATE

All CADD Project Log Sheets are to be saved to the R:\Roadway\Doc folder.

It is recommended that all COGO points, chains, and profiles output be performed at the same time as GPK DATA are being recorded. See GPK Conventions and COGO Guideline for further details.

CADD Project Log Data

This spreadsheet contains three (3) worksheets. One for GPK data, one for Design File data, and one for CADD Project Log data.

 





spacer spacer
spacer
 
North Carolina DOT Logo   The North Carolina
Department of Transportation