August 26
Sample Berm Ditch Criteria
Gutter Slopes Criteria
Gore Area Calculation Program (GACP) User Guide
Pay Item List Updated (SAPW)

August 1
June Staff Meeting Minutes Available
Updated Earthwork Claculations for V8 Input Files

July 28
Non-Plottable Cross Section Levels
CADD Project Log Data Now Available in Excel format
Other Units Link Updated

July 10
New Memo's (2) Posted
Bridge Approach Fill Details
Accommodations of Pedestrians within Work Zones

July 01
Referencing DRN Files as Placeholders
Maximum Allowable Cost Updated

June 24
Itemlist Updated for SAPW
iPlot Dialog Modeless and Auto-Dismiss Features

June 18
New (Old) Memo Found and Posted
Pavement Structure Volume

June 12
Undercut Criteria - Geotechnical Stratigraphy Consideration
May STaRS Meeting Minutes Available
D&C Manager- Property Owners
NCDOT RDU Plot Control Data Cell

May 29
Locating Existing EOP Complex Chain Elements
March & April STaRS Meeting Minutes Available
All Field Inspection Questions Updated

May 20
Update VL Criteria Config 1 (Earthwork LT and RT Limits)
March Staff Meeting Minutes Available
New Memo Construction Revisions

April 24
New Memo R/W PLan Sheet Revisions
New - Undercut Criteria

April 14
Basic Undercut Criteria Package Delivered to Geotech.
New Memo Roadway Design Project Engineer Assignment for Division DDC
New Memo Adherence to Policies to Accommodate Bike and Pedestrian Needs

April 09
"Final Surface Testing - Asphalt Pavements Project Special Provision" Added to Field Inspection Questions
Temporary Utility Easement Added to Workspace

April 07
CC Type 11 Valley Gutter added to Criteria
Limited CA Symbol added to Hearing Maps

April 02
Meet with Geotech and started Undercut Criteria.

March 27
All Field Inspection Questions Updated

March 26
Danger Tree Area Easement Added to Workspace
Subregional Tier Design Guidelines for NCDOT Bridge Projects

March 24
March CADD User Meeting Minutes Available

March 19
February STaRS Meeting Minutes Available

March 18
COGO Incomplete Input Files with Compound Spiral
PEF Guidelines Update - Updated Manual can be found at: Guidelines For Roadway Design Activities
A change log is also available at: Change Log
FHWA Review Points & Approval Action Points in Project Development Process

March 11
NCDOT Guidelines for Median Separation at Highway/Railway At-Grade Crossings Available

March 05
February Staff Meeting Minutes Available

February 29
XPL File with Multiple Baseline Offsets
A-plot Compared I-plot Driver Line Weights

February 27
Cutoff PDF Sheet Borders
Profile Elevation Label
CADD Newsletter - Catch up on the latest in the February 2008 CADD News Letter

February 06
Keep Levels Turned Off
Updated Org Chart & Phone List

February 04
November Staff Meeting Minutes Available
Obtaining Existing Roads EOP Level

January 28
Archive List Updated with Latest Projects Archived
Bridge Maintenance Document Management Guide Available

January 23
Introduction to GGC Part II of III, Superstreet Design
Updates to the percentages for the Asphalt Binder (For Plant Mix)
Grade PG 64-22, the PADC, Type P-57 changed from 0.02 to 0.023.
For Grade PG 76-22, the S12.5D changed from 0.048 to 0.050.

January 15
New Form added to new advertisements.

January 04
Updated Max Allowable Non-Salary Direct Costs

December 11
October 16 Guardrail Committee Minutes Available
November Meeting Minutes Available

December 10
Non-Standard Curb and Gutter Payitem
Standard Cable Guiderail Summary

November 28
Laying Out Cross Sections Sheets
Lock Element, Lock Level, and Level Lock Toggle
Criteria Files Updated

November 16
Locked Raster (Mr. SID) Reference File