spacer spacer   spacer   spacer   spacer  
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
 
spacer
 
Unit Support    |    Staff   |    Policy Memos    |    Project Services    |   
spacer spacer
spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer
  Structure Design Unit's Submittal Forms for Proposed Heavy Equipment on Bridge
spacer
spacer spacer  

Structure Design Unit's Submittal Forms for Proposed Heavy Equipment on Bridge

When the Contractor is proposing to place heavy equipment on a new bridge deck, the proposed plan shall be submitted to the Engineer, in accordance with the Standard Specifications, Section 420-20.

For background, also see the Chief Engineer-Operations memo dated September 24, 2007.

The Contractor is not required to use these submittal data forms for any submittal. The submittal data form is only an aid in making a complete submittal.

Three different submittal forms are available. They are for Crawler Cranes , Truck Cranes , and Concrete Pump Trucks Operating with Mobile Mixer Trucks .