FOOTNOTES
|
|
|
1. Use this Special Provision when ADTT > 500.
|
2. Use this Special Provision and "Sand Seal" when ADTT < 500.
|
|
3. Use "Securing of Vessels" on projects with navigable waterways.
|
|
4. When using "Pot Bearings","Optional Disc Bearings", "Expansion Joint Seals", "Modular Expansion Joint Seals" or "Strip Seals", also include "Thermal Sprayed Coatings (Metallization)". Also include "Thermal Sprayed Coatings (Metallization)" and "Elastomeric Concrete" when using armored joints for"Evazote Joint Seals".
|
|
5. Use "Precast Reinforced Concrete Box Culvert at Station ________" only when plans require precast culverts. Use "Optional Precast Reinforced Concrete Box Culvert at Station ________" when plans are detailed for cast-in-place culverts.
|
|
6. Review and coordinate the use of "MSE Retaining Walls" with the Geotechnical Engineering Unit before making final the plans for each project.
|
7. Use these Special Provisions on all projects.
|
8. Use "Bridge Deck Rideability and Grooving at Station _________" when the length of the bridge deck exceeds 1500 feet (460m).
|
9. When using "Drilled Piers", also include "Crosshole Sonic Logging", if required.
|
10. Use these Special Provisions with all Lump Sum projects. When drilled piers are used, include the applicable pay items in PSP 35, paragraph one, sentence two (in the list of pay items to be excluded): Drilled piers, permanent steel casings, SID inspection, crosshole sonic logging.
|
11. Use this Special Provision on projects with prestressed girders.
|
12. Use this Special Provision when a Temporary Rock Causeway [Workpad] is shown on the
plans.
|
13. Use this Special Provision when a Temporary Work Bridge is required.
|
14. Use this Special Provision on projects with prestressed concrete elements.
|
15. Use this Special Provision on projects designed by the AASHTO Standard Specifications (LFD).
|
16. Use this Special Provision on projects designed by the AASHTO LRFD Specifications. |
|