spacer spacer   spacer   spacer   spacer  
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
 
spacer
 
Unit Support    |    Staff   |    Policy Memos    |    Project Services    |   
spacer spacer
spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer
  PROJECT SPECIAL PROVISION FOR STRUCTURES AND CULVERTS
spacer
spacer spacer  

To View Revisions Memos choose Date from List from the drop down and then click View Memos.

PROJECT SPECIAL PROVISIONS STRUCTURES AND CULVERTS
Click on Highlighted or text to view PSP files
To Print This PSP Line-Up Sheet -click here- To Open the PDF File
PSP No.
Title
File Type
Last Revised
1 Maintenance and Protection of Traffic Beneath Proposed Structure at Station ________ or 8-13-04
2 Temporary Railroad Shoring or 10-12-01
3 Construction, Maintenance and Removal of Temporary Structure at Station ________
                                                                                                                                See Footnote 1
or 10-24-06
4 Construction, Maintenance and Removal of Temporary Structure at Station ________
                                                                                                                                See Footnote 2
or 10-24-06
5 Securing of Vessels                                                                                           See Footnote 3 or 10-12-01
6 Drilled Piers                                                                                               See Footnotes 9 & 15 or 11-17-06
6A Drilled Piers                                                                                               See Footnotes 9 & 16 or 9-16-08
7 Crosshole Sonic Logging or 11-17-06
8 Heat Curving Girders for Bridges at Stations ________ or 10-12-01
9 Cleaning and Painting Existing Bearing Plates or 10-12-01
10 TFE Expansion Bearing Assemblies or 10-12-01
11 Pot Bearings                                                                                                        See Footnote 4 or 6-07-05
12 Sound Barrier Wall or 7-12-07
13 Thermal Sprayed Coatings (Metallization) or 6-07-05
14 Repair of Bridge Decks and Approach Pavement with Latex Modified Concrete or 10-12-01
15 Latex Modified Concrete or 7-18-06
16 Epoxy Resin Injection or 10-12-01
17 Epoxy Mortar Repairs or 10-12-01
18 Sand Lightweight Concrete or 7-18-06
19 Expansion Joint Seals                                                                                          See Footnote 4 or 10-12-01
20 Modular Expansion Joint Seals                                                                          See Footnote 4 or 6-07-05
21 Evazote Joint Seals                                                                                               See Footnote 4 or 8-13-04
22 Strip Seals                                                                                                              See Footnote 4 or 10-12-01
23 Shotcrete Repairs or 8-13-04
24 Precast Reinforced Concrete Box Culvert at Station ________                    See Footnote 5 or 2-14-04
25 Optional Precast Reinforced Concrete Box Culvert at Station ________     See Footnote 5 or 2-14-04
26 Elastomeric Concrete                                                                                        or 10-12-01
27 MSE Retaining Walls (Geotechnical Provision)                                                See Footnote 6 or Use SP Date
28 Falsework and Formwork                                                                                     See Footnote 7 or 7-18-06
29 Submittal of Working Drawings                                                                           See Footnote 7 or 9-16-08
30 Construction, Maintenance and Removal of Temporary Access at Sta.__ See Footnote 12 or 11-17-06
31 Construction, Maintenance and Removal of Temporary Access at Sta.__ See Footnote 13 or 11-17-06
32 Optional Disc Bearings                                                                                         See Footnote 4 or 6-07-05
33 Bridge Deck Rideability and Grooving at Station _____                                 See Footnote 8 or 7-18-06
34 Electrical Conduit System or 3-04-05
35 Construction of Superstructure                                                                          See Footnote 10 or 7-18-06
36 Construction of Substructure                                                                             See Footnote 10 or 2-14-04
37 Crane Safety                                                                                                           See Footnote 7 or 8-15-05
38 Concrete Wearing Surface or 7-18-06
39 Pile Excavation                                                                                                    See Footnote 15 or 7-18-06
39A Piles                                                                                                                      See Footnote 16 or 9-16-08
40 Pile Driving Analyzer                                                                                           See Footnote 15 or 11-17-06
41 Crack Repair of Prestressed Concrete Girders                                            See Footnote 11 or 7-18-06
42 Shipping Steel Structural Members or 7-18-06
43 Grout For Structures                                                                                             See Footnote 7 or 7-12-07
44 High Strength Bolts or 11-17-06
45 Prestressed Concrete Members                                                                      See Footnote 14 or 04-02-07
46 Adhesively Anchored Anchor Bolts or Dowels or 06-11-07


The following Special Provisions are to be written on a project by project basis.
Removal of Existing Structure (When DOT wants salvage material or special removal.)


FOOTNOTES
1. Use this Special Provision when ADTT > 500.
2. Use this Special Provision and "Sand Seal" when ADTT < 500.
3. Use "Securing of Vessels" on projects with navigable waterways.
4. When using "Pot Bearings","Optional Disc Bearings", "Expansion Joint Seals", "Modular Expansion Joint Seals" or "Strip Seals", also include "Thermal Sprayed Coatings (Metallization)". Also include "Thermal Sprayed Coatings (Metallization)" and "Elastomeric Concrete" when using armored joints for"Evazote Joint Seals".
5. Use "Precast Reinforced Concrete Box Culvert at Station ________" only when plans require precast culverts. Use "Optional Precast Reinforced Concrete Box Culvert at Station ________" when plans are detailed for cast-in-place culverts.
6. Review and coordinate the use of "MSE Retaining Walls" with the Geotechnical Engineering Unit before making final the plans for each project.
7. Use these Special Provisions on all projects.
8. Use "Bridge Deck Rideability and Grooving at Station _________" when the length of the bridge deck exceeds 1500 feet (460m).
9. When using "Drilled Piers", also include "Crosshole Sonic Logging", if required.
10. Use these Special Provisions with all Lump Sum projects. When drilled piers are used, include the applicable pay items in PSP 35, paragraph one, sentence two (in the list of pay items to be excluded): Drilled piers, permanent steel casings, SID inspection, crosshole sonic logging.
11. Use this Special Provision on projects with prestressed girders.
12. Use this Special Provision when a Temporary Rock Causeway [Workpad] is shown on the plans.
13. Use this Special Provision when a Temporary Work Bridge is required.
14. Use this Special Provision on projects with prestressed concrete elements.
15. Use this Special Provision on projects designed by the AASHTO Standard Specifications (LFD).
16. Use this Special Provision on projects designed by the AASHTO LRFD Specifications.



spacer spacer