| PROJECT SPECIAL PROVISIONS STRUCTURES AND CULVERTS |
|
|
|
Click on Highlighted or text to view PSP files |
|
| To Print This PSP Line-Up Sheet -click here- To Open the PDF File |
|
| PSP No. |
Title |
File Type |
Last Revised |
| 1 |
Cast-in-Place Concrete Deck Slab Bridges |
or |
10-12-01 |
| 2 |
Maintenance and Protection of Traffic Beneath Proposed Structure at Station _____ |
or |
8-13-04 |
| 3 |
Temporary Railroad Shoring |
or  |
10-12-01 |
| 4 |
Construction, Maintenance and Removal of Temporary Structure at Station ________
See Footnote 1 |
or |
8-13-04 |
| 5 |
Construction, Maintenance and Removal of Temporary Structure at Station ________
See Footnote 2 |
or |
10-12-01 |
| 6 |
Sand Seal
|
or  |
10-12-01 |
| 7 |
Removal of Existing Structure and Bridge Failure Detection Device at Station _____ |
or  |
10-12-01 |
| 8 |
Securing of Vessels
See Footnote 3 |
or  |
10-12-01 |
| 9 |
Falsework and Forms Over or Adjacent To Traffic |
or  |
10-12-01 |
| 10 |
Drilled Piers
See Footnote 13 |
or  |
6-07-05 |
| 11 |
Calcium Nitrite Corrosion Inhibitor |
or  |
2-14-04 |
| 12 |
Crosshole Sonic Logging |
or  |
6-07-05 |
| 13 |
Steel Pile Points |
or  |
10-12-01 |
| 14 |
Mechanical Butt Splicing for Reinforcing Steel |
or  |
10-12-01 |
| 15 |
Galvanized Reinforcing Steel |
or  |
10-12-01 |
| 16 |
Steel Pile Tips |
or  |
10-03-02 |
| 17 |
Galvanizing Steel Piles |
or  |
10-03-02 |
| 18 |
Heat Curving Girders for Bridges at Stations ________ |
or  |
10-12-01 |
| 19 |
Cleaning and Painting Existing Bearing Plates |
or |
10-12-01 |
| 20 |
Self-Lubricating Expansion Bearing Assemblies> |
or |
10-12-01 |
| 21 |
TFE Expansion Bearing Assemblies |
or |
10-12-01 |
| 22 |
Pot Bearings
See Footnote 4 |
or |
6-07-05 |
| 23 |
Sound Barrier Wall |
or |
2-04-03 |
| 24 |
Thermal Sprayed Coatings (Metallization) |
or |
6-07-05 |
| 25 |
Minimizing Railroad Flagging Service
See Footnote 5 |
or |
10-12-01 |
| 26 |
Repair of Bridge Decks and Approach Pavement with Latex Modified Concrete |
or |
10-12-01 |
| 27 |
Latex Modified Concrete |
or  |
12-12-02 |
| 28 |
Epoxy Resin Injection |
or |
10-12-01 |
| 29 |
Epoxy Mortar Repairs |
or |
10-12-01 |
| 30 |
Adhesively Anchored Anchor Bolts or Dowels |
or |
10-12-01 |
| 31 |
Reinforced Concrete Deck Slab (Sand Lightweight Concrete) |
or |
10-12-01 |
| 32 |
Sand Lightweight Concrete |
or |
10-12-01 |
| 33 |
Microsilica Concrete |
or |
10-12-01 |
| 34 |
Select Backfill Material |
or |
10-12-01 |
| 35 |
Expansion Joint Seals
See Footnote 4 |
or |
10-12-01 |
| 36 |
Modular Expansion Joint Seals
See Footnote 4 |
or  |
6-07-05 |
| 37 |
Preformed Compression Joint Seals
See Footnote 4 |
or |
10-12-01 |
| 38 |
Evazote Joint Seals
See Footnote 4 |
or |
8-13-04 |
| 39 |
Strip Seals
See Footnote 4 |
or |
10-12-01 |
| 41 |
Shotcrete Repairs |
or |
8-13-04 |
| 42 |
Epoxy Protective Coating |
or |
10-12-01 |
| 43 |
Precast Reinforced Concrete Box Culvert at Station ________
See Footnote 6 |
or |
2-14-04 |
| 44 |
Optional Precast Reinforced Concrete Box Culvert at Station ________
See Footnote 6 |
or |
2-14-04 |
| 45 |
Elastomeric Concrete |
or |
10-12-01 |
| 46 |
MSE Retaining Walls
See Footnote 7 |
or |
03-04-05 |
| 47 |
Vertical Cracks in Prestressed Concrete Girders Prior to Detensioning |
or |
10-12-01 |
| 48 |
Falsework and Formwork
See Footnote 8 |
or |
10-12-01 |
| 49 |
Submittal of Working Drawings
See Footnote 8 |
or |
6-07-05 |
| 50 |
Construction, Maintenance and Removal of Temporary Access At Station _________ |
or |
2-14-04 |
| 51 |
Metric Structural Steel
See Footnote 9 |
or |
10-12-01 |
| 52 |
Optional Disc Bearings
See Footnote 4 |
or |
6-07-05 |
| 53 |
Elastomeric Bearings |
or |
10-03-02 |
| 54 |
Steel Pile Splicer |
or |
10-03-02 |
| 55 |
Bridge Deck Rideability and Grooving at Station ______
See Footnote 10 |
or |
2-14-04 |
| 56 |
Unclassified Structure Excavation at Station ______
See Footnote 11 |
or |
12-12-02 |
| 57 |
Charpy V-Notch Tests
See Footnote 12 |
or |
12-12-02 |
| 58 |
Electrical Conduit System |
or |
03-04-05 |
| 59 |
Direct Tension Indicators DELETED |
or |
8-13-04 |
| 61 |
Prestressed Concrete Members |
or |
3-04-05 |
| 62 |
Prestressed Concrete Piles
See Footnote 14 |
or |
8-13-04 |
| 63 |
Construction of Superstructure
See Footnote 15 |
or |
2-14-04 |
| 64 |
Construction of Substructure
See Footnote 15 |
or |
2-14-04 |
| 65 |
Fabricated Metal Stay-In-Place Forms
See Footnote 17 |
or |
6-07-05 |
| 66 |
Painting Structural Steel
See Footnote 16 |
or |
8-13-04 |
| 67 |
Crane Safety
See Footnote 8 |
or |
8-15-05 |
| 68 |
Concrete Wearing Surface
| or |
8-15-05 |
| 69 |
Prestressed Concrete Box Beam |
or |
3-04-05 |
| 70 |
Pile Excavation |
or |
6-07-05 |
| 71 |
Pile Driving Analyzer |
or |
6-07-05 |
| 72 |
Steel H Piles |
or |
8-15-05 |