spacer spacer   spacer   spacer   spacer  
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
 
spacer
 
Unit Support    |    Staff   |    Policy Memos    |    Project Services    |   
spacer spacer
spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer
  PROJECT SPECIAL PROVISION FOR STRUCTURES AND CULVERTS
spacer
spacer spacer  

To View Revisions Memos choose Date from List from the drop down and then click View Memos.

PROJECT SPECIAL PROVISIONS STRUCTURES AND CULVERTS
Click on Highlighted or text to view PSP files
To Print This PSP Line-Up Sheet -click here- To Open the PDF File
PSP No.
Title
File Type
Last Revised
1 Cast-in-Place Concrete Deck Slab Bridges or 10-12-01
2 Maintenance and Protection of Traffic Beneath Proposed Structure at Station _____ or 8-13-04
3 Temporary Railroad Shoring or 10-12-01
4 Construction, Maintenance and Removal of Temporary Structure at Station ________
                                                                                                                                See Footnote 1
or 8-13-04
5 Construction, Maintenance and Removal of Temporary Structure at Station ________
                                                                                                                                See Footnote 2
or 10-12-01
6 Sand Seal
or 10-12-01
7 Removal of Existing Structure and Bridge Failure Detection Device at Station _____ or 10-12-01
8 Securing of Vessels                                                                                          See Footnote 3 or 10-12-01
9 Falsework and Forms Over or Adjacent To Traffic or 10-12-01
10 Drilled Piers                                                                                                    See Footnote 13 or 6-07-05
11 Calcium Nitrite Corrosion Inhibitor or 2-14-04
12 Crosshole Sonic Logging or 6-07-05
13 Steel Pile Points or 10-12-01
14 Mechanical Butt Splicing for Reinforcing Steel or 10-12-01
15 Galvanized Reinforcing Steel or 10-12-01
16 Steel Pile Tips or 10-03-02
17 Galvanizing Steel Piles or 10-03-02
18 Heat Curving Girders for Bridges at Stations ________ or 10-12-01
19 Cleaning and Painting Existing Bearing Plates or 10-12-01
20 Self-Lubricating Expansion Bearing Assemblies> or 10-12-01
21 TFE Expansion Bearing Assemblies or 10-12-01
22 Pot Bearings                                                                                                    See Footnote 4 or 6-07-05
23 Sound Barrier Wall or 2-04-03
24 Thermal Sprayed Coatings (Metallization) or 6-07-05
25 Minimizing Railroad Flagging Service                                                       See Footnote 5 or 10-12-01
26 Repair of Bridge Decks and Approach Pavement with Latex Modified Concrete or 10-12-01
27 Latex Modified Concrete or 12-12-02
28 Epoxy Resin Injection or 10-12-01
29 Epoxy Mortar Repairs or 10-12-01
30 Adhesively Anchored Anchor Bolts or Dowels or 10-12-01
31 Reinforced Concrete Deck Slab (Sand Lightweight Concrete) or 10-12-01
32 Sand Lightweight Concrete or 10-12-01
33 Microsilica Concrete or 10-12-01
34 Select Backfill Material or 10-12-01
35 Expansion Joint Seals                                                                                          See Footnote 4 or 10-12-01
36 Modular Expansion Joint Seals                                                                         See Footnote 4 or 6-07-05
37 Preformed Compression Joint Seals                                                              See Footnote 4 or 10-12-01
38 Evazote Joint Seals                                                                                               See Footnote 4 or 8-13-04
39 Strip Seals                                                                                                              See Footnote 4 or 10-12-01
41 Shotcrete Repairs or 8-13-04
42 Epoxy Protective Coating or 10-12-01
43 Precast Reinforced Concrete Box Culvert at Station ________                See Footnote 6 or 2-14-04
44 Optional Precast Reinforced Concrete Box Culvert at Station ________ See Footnote 6 or 2-14-04
45 Elastomeric Concrete or 10-12-01
46 MSE Retaining Walls                                                                                            See Footnote 7 or 03-04-05
47 Vertical Cracks in Prestressed Concrete Girders Prior to Detensioning or 10-12-01
48 Falsework and Formwork                                                                                     See Footnote 8 or 10-12-01
49 Submittal of Working Drawings                                                                            See Footnote 8 or 6-07-05
50 Construction, Maintenance and Removal of Temporary Access At Station _________ or 2-14-04
51 Metric Structural Steel                                                                                            See Footnote 9 or 10-12-01
52 Optional Disc Bearings                                                                                       See Footnote 4 or 6-07-05
53 Elastomeric Bearings or 10-03-02
54 Steel Pile Splicer or 10-03-02
55 Bridge Deck Rideability and Grooving at Station ______                            See Footnote 10 or 2-14-04
56 Unclassified Structure Excavation at Station ______                                  See Footnote 11 or 12-12-02
57 Charpy V-Notch Tests                                                                                        See Footnote 12 or 12-12-02
58 Electrical Conduit System or 03-04-05
59 Direct Tension Indicators DELETED or 8-13-04
61 Prestressed Concrete Members or 3-04-05
62 Prestressed Concrete Piles                                                                            See Footnote 14 or 8-13-04
63 Construction of Superstructure                                                                      See Footnote 15 or 2-14-04
64 Construction of Substructure                                                                          See Footnote 15 or 2-14-04
65 Fabricated Metal Stay-In-Place Forms                                                          See Footnote 17 or 6-07-05
66 Painting Structural Steel                                                                                 See Footnote 16 or 8-13-04
67 Crane Safety                                                                                                      See Footnote 8 or 8-15-05
68 Concrete Wearing Surface                                                                            or 8-15-05
69 Prestressed Concrete Box Beam or 3-04-05
70 Pile Excavation or 6-07-05
71 Pile Driving Analyzer or 6-07-05
72 Steel H Piles or 8-15-05


The following Special Provisions are to be written on a project by project basis.
Removal of Existing Structure (When DOT wants salvage material or special removal.)


FOOTNOTES
1. Use this Special Provision when ADTT > 500.
2. Use this Special Provision and "Sand Seal" when ADTT < 500.
3. Use "Securing of Vessels" on projects with navigable waterways.
4. When using "Pot Bearings","Optional Disc Bearings", "Expansion Joint Seals", "Modular Expansion Joint Seals" or "Strip Seals", also include "Thermal Sprayed Coatings (Metallization)". Also include "Thermal Sprayed Coatings (Metallization)" and "Elastomeric Concrete" when using armored joints for"Evazote Joint Seals" or "Optional Preformed Compression Joint Seals".
5. Use "Minimizing Railroad Flagging Service" on projects with construction activity on or adjacent to the railroad right-of-way.
6. Use "Precast Reinforced Concrete Box Culvert at Station ________" only when plans are detailed for precast culverts. Use "Optional Precast Reinforced Concrete Box Culvert at Station ________" when plans are detailed for cast-in-place culverts.
7. Review and coordinate the use of "MSE Retaining Walls" with the Geotechnical Engineering Unit before making final the plans for each project.
8. Use these Special Provisions on all projects.
9. Use "Metric Structural Steel" on all metric projects with prestressed girder and steel girder superstructures.
10. Use "Bridge Deck Rideability and Grooving at Station _________" when the length of the bridge deck exceeds 1500 feet (460m).
11. Use "Unclassified Structure Excavation at Station _______" when the estimated quantity per structure is less than 500 yd3 (380m3).
12. Use "Charpy V-Notch Tests" on projects with horizontally curved girders.
13. When using "Drilled Piers", also include "Crosshole Sonic Logging".
14. Use "Prestressed Concrete Piles" with all projects with prestressed concrete piles..
15. Use these Special Provisions with all Lump Sum projects. When drilled piers are used, include the applicable pay items in PSP 64, paragraph one, sentence two (in the list of pay items to be excluded): Drilled piers, permanent steel casings, SID inspection, crosshole sonic logging and CSL Tubes.
16. Use "Painting Structural Steel" when painting non-weathering structural steel.
17. Use "Fabricated Metal SIP Forms" on all projects with prestressed girder superstructures with SIP forms, or steel girder superstructures where concrete is excluded from the SIP form valleys.