spacer spacer   spacer   spacer   spacer  
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
 
spacer
 
Unit Support    |    Staff   |    Project Special Provisons    |    Project Services    |   
spacer spacer
spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer
  Spring Field Review Site 16A
spacer
spacer spacer  
Spring Field Review Site 16A

Description: ADD ON SITE: WAKE FOREST BYPASS BRIDGE WITH CONVEYOR

LOCATION:Wake Forest bypass over US 1 (Capitol Blvd.).

ITEM(S) OF INTEREST:This project has a Single Point Urban Interchange (SPUI) bridge, giving the bridge deck an hourglass shape. The project had several construction and geometric problems resulting in reduced roadway clearances.
Observations and Points of Discussion:
  • This Project was initially scoped as a culvert.
  • Steep end slopes with rock embankment (class 7 rip-rap),
  • The alternative was to install fabric wall slope stabilization
  • Bent in stream required permit modification to divert stream channel.
  • It was noted that during your tour of this site the metal SIP forms were being placed before cast-in-place concrete diaphragms.

  • picture 1 picture 2 picture 3 picture 4
     
    picture 5 picture 6 picture 7 picture 8