spacer spacer   spacer   spacer   spacer  
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
 
spacer
 
Unit Support    |    Staff   |    Project Special Provisons    |    Project Services    |   
spacer spacer
spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer
  Spring Field Review Site 2
spacer
spacer spacer  
Spring Field Review Site 2

Description: B-3442 & B-3443 - CUMBERLAND COUNTY

LOCATION: SR 1006 over the Cape Fear River..

ITEM(S) OF INTEREST: 5-span steel structure with classic rail.

Observations and Points of Discussion:
  • Use of very tall galvanized pipe piles, which had lots of visible repairs to the galvanizing.
  • FHWA inquired if NCDOT ever fills tall pipe piles with reinforced concrete. The Department does not fill pipe piles with concrete.
  • In response to a question about the economy of pipe piles, the Geotechincal Unit stated that they would recommend their use in      more locations if the Department had standard drawings for 18", 24", and 30" diameter galvanized or metallized pipe piles.
  • It was suggested that the Structure Design Unit develop a standard drawing for 12" pipe piles to replace 12" "H" piles because the      pipe piles will allow for using shorter piles since close ended pipe piles can develop significant end bearing in addition to skin      friction.
  • For the drilled piers on this site, polymer slurry was used to stabilize the excavation.
  • Steel girder flange splices had as many rows of bolts as the web.
  • It appeared that the girder span lengths could have been longer.
  • The Construction Unit noted the need to detail a for short "knee" wall on decorative rails to allow contractor to level up forms and      make adjustments for variations in elevations in the deck so that the top of the rail will be at a constant elevation. It was also noted      that decorative rails add time to contract period.
  • This site had several utilities adjacent to the bridge. It was noted that in most cases it is better to relocate utilities that are impede      construction activities. However, it was recognized that the owners often don't have sufficient funds for relocation, but in general the      utility owners would permit relocations if the Department will pay for them.
  • A permit modification was required for barge landing because it was omitted in the original permit

  • picture 1 picture 2 picture 3 picture 4 picture 5 picture 6
     
    picture 7 picture 8 picture 9 picture 10 picture 11 picture 12
     
    picture 13 picture 14 picture 15 picture 16 picture 17 picture 18
     
    picture 19 picture 20 picture 21 picture 22 picture 24 picture 25
     
    picture 26 picture 27 picture 28 picture 29 picture 30 picture 31
     
    picture 32 picture 33 picture 34 picture 35 picture 36 picture 37
     
    picture 38 picture 39 picture 40 picture 41 picture 42 picture 43
     
    picture 44 picture 45 picture 46 picture 47 picture 48 picture 49
     
    picture 50 picture 51 picture 52 picture 54 picture 55 picture 56
     
    picture 57 picture 58 picture 59 picture 60 picture 61



    spacer spacer
    spacer
     
    North Carolina DOT Logo   The North Carolina
    Department of Transportation