spacer spacer   spacer   spacer   spacer  
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
 
spacer
 
Unit Support    |    Staff   |    Project Special Provisons    |    Project Services    |   
spacer spacer
spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer
  Spring Field Review Site 4
spacer
spacer spacer  
Spring Field Review Site 4

Description: B-3167 - DUPLIN COUNTY

LOCATION: SR-1723 over Cabin Creek

ITEM(S) OF INTEREST: Bridge Maintenance Unit Purchase Order Contract (POC) job. Contrast this project with normal TIP jobs, particularly how the Bridge Maintenance Unit handles roadway approach work on bridge replacements.

Observations and Points of Discussion:
  • 2-span (25' - 50') cored slab bridge with precast NJ shape barrier rail with cast in place barrier rail transition, and a 6%      superelevation.
  • The bridge is in a location with a low sag vertical curve with potential for overtopping.
  • Minimal approach roadway work was appropriate for the scope of the project
    • Demonstrated a reasonable balance between bridge length and maintaining the grade.
    • Demonstrated that approaches do not need to be widened for bridge with large shoulders.
  • Bridge is a good example of a situation where a single span box-beam superstructure would have been appropriate.
    • The new process document will include details on how the Structure Design Unit will interact with Hydraulics in order to eliminate undesirable span arrangements.
  • Recommendations:
    • Develop guidelines to determine situations where widening roadway approaches is appropriate,
    • Roadway Design and Structure Design Units should not design bridges for more than 2 lanes if the approach roadway is only two lanes,
    • In some situations allow shorter approach slabs in lieu of the current 25'-0". A suggestion is to base the approach slab length on the design ADT.


  • picture 1 picture 2 picture 3 picture 4 picture 5 picture 6 picture 7 picture 8 picture 9
     
    picture 10 picture 11 picture 12 picture 13 picture 14 picture 15 picture 16 picture 17 picture 18
     
    picture 19 picture 20 picture 21 picture 22 picture 23 picture 24 picture 25



    spacer spacer
    spacer
     
    North Carolina DOT Logo   The North Carolina
    Department of Transportation