spacer spacer   spacer   spacer   spacer  
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
 
spacer
 
Unit Support    |    Staff   |    Project Special Provisons    |    Project Services    |   
spacer spacer
spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer
  Spring Field Review Site 5
spacer
spacer spacer  
Spring Field Review Site 5

Description:B-2938 - CARTERET-ONSLOW COUNTIES

LOCATION: Bridge #49 - SR1101 over the White Oak River

ITEM(S) OF INTEREST: A 2300-foot long Type II and Type IV prestressed concrete girder bridge. Several unique elements including 24" composite piles, 24" Dia. metallized pipe piles, closed drainage system, unarmored evazote joints with elastomeric headers.
Observations and Points of Discussion:
  • The existing bridge is relatively short with a causeway over the surrounding wetlands.
  • There were questions regarding the length of the replacement bridge, foundation types and size, and the span arrangements.
  • The site geometry especially at the bridge landing, where there is a roadway intersection and some businesses, presented a
         significant challenge in providing sufficient under-clearance for the navigable waterway.
    • Deeper girders would have required raising the grade, but it would have been difficult to tie back in to the approaches.
    • Predicted scour resulted in waterline footings on piles.
    • Relatively shallow layer of hard material resulted in A-frame interior bents
    • There were several other concerns that were raised, but each discipline had cogent reasons for the resulting layout and design of the structure.
  • It was suggested that use of FB-Pier on projects with numerous challenges, such as this one, might allow the Department to design      interior bents that are a lot less imposing.
  • Therefore on long coastal projects with waterline footings and lateral stability concerns the Department should consider alternate      analysis approaches.
  • There were still questions as to who throws the flag for alternative analyses.
  • The group was in agreement that project schedules should not drive engineering decisions / designs.

  • FHWA inquired if this was a suitable location for jetting piles.
    • It was noted that jetting is most suitable for Divisions 1 & 2 (coastal counties).
    • Problems encountered when jetting for the Virginia Dare Bridge (Manteo) have been unduly generalized for all sites.
    • However, the Department is still pursuing jetting. A Special Provision, which specifies limits on containment for the contractor, is currently being developed. This will provide a starting point.
    • The Department has proposed to perform jetting demonstrations/tests, which will be the basis for new jetting models for the certain/various soil types.
    • Regulatory Agencies don't qualify zones in which jetting is not acceptable. In general they view jetting favorably, but they want to know how jetting will be implemented.
    • FHWA recommends making jetting a priority.

  • picture 1 picture 2 picture 3 picture 4 picture 5
     
    picture 6 picture 7 picture 8 picture 9 picture 10



    spacer spacer
    spacer
     
    North Carolina DOT Logo   The North Carolina
    Department of Transportation