spacer spacer   spacer   spacer   spacer  
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
 
spacer
 
Unit Support    |    Staff   |    Project Special Provisons    |    Project Services    |   
spacer spacer
spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer
  Spring Field Review Site 4
spacer
spacer spacer  
Spring Field Review Site 4

Description: I-4025A - YADKIN COUNTY

Location: I-77 SBL over the Yadkin River

Item(s) of Interest: During the 2002 Spring Field review we visited the rehab of NBL under I-4025. Due to major overruns and problems with the NBL, the rehab of the SBL was scrapped and it was decided to replace the structure, which is now underway. The structure bridges over a 2 lane road, a railroad spur and the Yadkin River. A concrete girder superstructure was selected due to the high cost of steel. The replacement bridge superstructure consists of 130 ft. span, 72" bulb-tee girders. 10 ksi. concrete for the girders and a lightweight deck was required to achieve the span lengths.

The site required staged construction with anchored temporary barrier rail. Temporary rails on the lightweight deck were a concern for popouts. A 10" gas main not located during design resulted in relocating a bent. Bents adjacent to the railroad track were placed so that a minimum 25'-0" horizontal clearance was maintained, thus eliminating the need for crashwalls. Replacement bearings for the NBL required widened bent caps. Emergency repairs to the SBL required addition of some crutch bents. 'L' bars in girders were too high.

Observations and Points of Discussion:

  • Closed drainage system appeared to follow the deck profile instead of being graded to drain.
  • Drains discharge well away from RR tracks.
  • Lightweight concrete deck looked very good. No major cracking problems reported or observed, though Construction indicated that the material was difficult to work with.
  • Approach roadway has been changed from concrete pavement to asphalt, which required some modifications to the approach slabs.


picture 1 picture 2 picture 3 picture 4 picture 5 picture 6 picture 7 picture 8
 
picture 9 picture 10 picture 11 picture 12 picture 13 picture 14 picture 15 picture 16
 
picture 17 picture 18 picture 19 picture 20 picture 21 picture 22 picture 23 picture 24
 
picture 25 picture 26 picture 27 picture 28 picture 29 picture 30 picture 31 picture 32
 
picture 33 picture 34 picture 35 picture 36 picture 37 picture 38 picture 39 picture 40
 
picture 41 picture 42 picture 43 picture 44