spacer spacer   spacer   spacer   spacer  
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
 
spacer
 
Unit Support    |    Staff   |    Project Special Provisons    |    Project Services    |   
spacer spacer
spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer
  Spring Field Review Site 6
spacer
spacer spacer  
Spring Field Review Site 6

Description: B-3263 - WATAUGA COUNTY

Location: Guy Ford Road.

Item(s) of Interest: 3 span cored slab with a Nebraska flow-through rail. End Bents are on drilled shafts. This structure is a low water structure with an annual frequency of overtopping.

The normal water surface (NWS) is about even with the bottom of the cap, placing the bottom of cored slab unit at about 3.5 feet above the NWS.

The bridge was originally built with an asphalt wearing surface that delaminated and peeled off during a storm event three weeks after opening to traffic. The approach slabs also washed out. After the approach washed out, Ralph Whitehead designed one of the approach slabs (under End bent closest to Route 321) with 33 piles spaced at 9’-6" under a 70 ft long approach slab. The approach slab is overlayed with asphalt to match the grade.

Bridge Maintenance rebuilt approaches and replaced the asphalt wearing surface with a concrete overlay with welded wire fabric reinforcement. On the rail exterior, between the rail posts, a galvanized plate was attached to keep water from getting under the concrete overlay.

Observations and Points of Discussion:

  • At this site, the lack of a flood plain for stream relief during storm events exacerbates overtopping on this bridge.
  • For sites similar to this, a permanent solution would require a multispan curved girder bridge.
    • Cost for such a large bridge cannot be justified for the current 210 ADT, which is projected to be 500 in 25 years.
      Also, in the mountains, approvals for long detours are difficult to obtain.
  • FEMA studies do not provide conveyance credit for openings in the rail. As such, there is not much hydraulic design benefit in using the Nebraska barrier rail.
  • For similar sites, additional measures to mitigate debris accumulation should be considered.
    • Shallower bent caps with closer pile spacing, and
      End treatments for guardrail attachment to bridge rail.


picture 1 picture 2 picture 3 picture 4 picture 5
 
picture 6 picture 7 picture 8 picture 9 picture 10
 
picture 11 picture 12 picture 13 picture 14 picture 15
 
picture 16 picture 17 picture 18 picture 19 picture 20



spacer spacer
spacer
 
North Carolina DOT Logo   The North Carolina
Department of Transportation