spacer spacer   spacer   spacer   spacer  
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
 
spacer
 
Unit Support    |    Staff   |    Project Special Provisons    |    Project Services    |   
spacer spacer
spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer
  Spring Field Review Site 13
spacer
spacer spacer  
Spring Field Review Site 13

Description: B-3652 - GUILFORD COUNTY


Location: Bridge #20 on SR 4121 over Deep River.

Item(s) of Interest:

  • 3 span(65'-85'-65') Type IV girder bridge with 4' f drilled piers.
  • Electrical conduit and other utility issues.
  • On-site temporary detour bridge.
  • Permit mistakenly stated that detour bridge would span the river so temporary bents were not allowed to be placed in the river. Post-let, a need for maintaining pedestrian traffic was identified.
  • New bridge will have a closed drainage system.
  • Used standard overhang falsework plans.
  • Drop inlet in the approach slab.
  • "Floating" grade point.

Observations and Points of Discussion:

  • This site utilized a rock causeway for construction access, but the temporary detour bridge was required to span the stream.
  • All Units were encouraged to promote awareness of such errors among their staff and the regulatory agency staff.
  • There was some general discussion on the costs of on-site detours, with this site being cited as an example because of the requirement to span the stream and to provide a pedestrian walkway by supplemental agreement. There was consensus to include verbiage, in the planning documents, permit applications, and contract, that will avoid similar issues in the future.
  • Temporary bridge had a pedestrian walkway, which the city requested for access to a nearby park.

ACTION ITEM(S):

  • Structure Design will discuss the importance of carefully reviewing and discussing permits with their staff.

picture 1 picture 2 picture 3 picture 4 picture 5 picture 6 picture 7 picture 8
 
picture 9 picture 10 picture 11 picture 12 picture 13 picture 14 picture 15 picture 16
 
picture 17 picture 18 picture 19 picture 20 picture 21 picture 22 picture 23 picture 24
 
picture 25 picture 26 picture 27 picture 28 picture 29 picture 30 picture 31 picture 32
 
picture 33 picture 34 picture 35 picture 36 picture 37 picture 38 picture 39 picture 40
 
picture 41 picture 42 picture 43 picture 44 picture 45 picture 46 picture 47 picture 48
 
picture 49 picture 50 picture 51 picture 52 picture 53



spacer spacer
spacer
 
North Carolina DOT Logo   The North Carolina
Department of Transportation