spacer spacer   spacer   spacer   spacer  
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
 
spacer
 
Unit Support    |    Staff   |    Project Special Provisons    |    Project Services    |   
spacer spacer
spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer
  Spring Field Review Site 14A & 14B
spacer
spacer spacer  
Spring Field Review Site 14A & 14B

Description: U-2524 - GUILFORD COUNTY


Location: New bridges on the Greensboro outer loop over Market Street (A) and Friendly Avenue (B).

Item(s) of Interest:

  • (A) 2 span (110'-193') continuous steel girder bridge over Market Street and a railroad, with columns on pile footings substructure.
  • (A) Skew varied from 90o at end bent 1 to 129o at end bent 2, resulting in a trapezoidal span, which had concerns over differential deflections and was a big challenge to grade and screed deck.
  • (B) 310' single span steel structure over a single point interchange on Friendly Avenue.
  • (B) Originally, the plan was to erect and brace together the first 2 girders and support them on a temporary bent. Once the first 2 girders were placed, the plan was to move the temporary bent, and erect the 3rd and 4th girders. When the temporary bent was removed, girders rotated laterally. Erection plan was changed so that three girders were supported at a time.

Observations and Points of Discussion:

  • The railroad flagman was on site despite the fact there was no ongoing work over the railroad. It was noted that this would have been a good job for A+B bidding for the railroad flagging pay item.
  • The Materials and Tests unit noted that the Type 3 bolts in the end bent diaphragm were weathering bolts, but the Standard Specifications require mechanically galvanized bolts for painted structural steel connections.
  • It was noted that an improved design of the end bents would have shortened the bridge by several feet.
  • There were questions on the final location of the barrier rail in relation to the coping on top of the very long MSE walls.
  • The Geotechnical Engineering Unit is considering the use of alternative backfill material for MSE walls.
  • There were questions on the cost-benefits of large modular joints.

ACTION ITEM(S):

    Structure Design will work with the Project Services Unit -- Contract Office to develop and try a couple of alternative flagging payment methods.