spacer spacer   spacer   spacer   spacer  
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
 
spacer
 
Unit Support    |    Staff   |    Project Special Provisons    |    Project Services    |   
spacer spacer
spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer
  Spring Field Review Site 3
spacer
spacer spacer  
Spring Field Review Site 3

Description: B-4188 - MARTIN COUNTY


Location: Bridge #36 on SR 1523 over Smithwick Creek

Item(s) of Interest

  • A 2005 IBRD bridge project, which is a trial of an accelerated construction technique used in other states.
  • 90' single span, with 36" steel girders and a full-depth precast deck.
  • Deck consists of 11 full width, 8' long full depth panels that are longitudinally post-tensioned together.
  • Panels have four longitudinal post-tensioning ducts, with 5 strands per duct.
  • Deck panels are attached to the girder by field welding studs to the top of the girder through a recess in the panel and grouting the girder and panel together.

Observations and Points of Discussion:

  • This site was not visited because there was a delay in delivering the precast concrete deck panels.
  • However, there was some discussion on the construction progress and provisions for research, evaluation and documentation of the project.
  • There were no IBRD research funds for this project, but the Structure Design Unit will coordinate documentation of the project activities.

ACTION ITEM(S):

  • Structure Design will facilitate the project documentation.




spacer spacer