Item(s) of Interest: Project paired with Site 5 at Rose Bay Let in April 2006. Precast bent caps with prestressed piles. Observations and Points of Discussion: One corner of the existing partially removed bridge did not have shoring, which appeared necessary. Water filled barrier rails used on the bridge approaches, but are not suitable for use on the bridge. Some of the rails did not have water. ACTION ITEM(S): None
Observations and Points of Discussion:
ACTION ITEM(S): None