spacer spacer   spacer   spacer   spacer  
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
 
spacer
 
Unit Support    |    Staff   |    Project Special Provisons    |    Project Services    |   
spacer spacer
spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer
  Spring Field Review Site 8
spacer
spacer spacer  
Spring Field Review Site 8

Description: U4438 - PASQUOTANK COUNTY


Location: US 158 (NC 34 - Water Street) to US 17 Business in downtown Elizabeth City

Item(s) of Interest:

  • Bridge dates back to 1931 and is a drawbridge with steel grate deck.
  • Bridge replacement in downtown Elizabeth City waterfront.
  • Plan is to replace bridge with some type of moveable span.
  • Bridge approaches consist of concrete roadway supported by timber pilings.
  • Subject of an intense study of whether to keep or replace existing concrete roadway dating back to 1938.
  • Many nearby buildings are a concern regarding potential damage due to pile driving.
  • East Elizabeth Street, which is attached to the west of the bridge, has historically had an issue with settlement of as much as a foot or more. The Geotechnical Unit is currently considering the use of micropiles to support the road.

Observations and Points of Discussion:

  • The site has many unique features/problems due to unstable subsurface conditions.
  • There is a creek beneath a building adjacent to the roadway.
  • Many areas along the roadway and along the sidewalk have large voids.
  • Periodic repaving has been necessary, but there is need for a more permanent solution.
  • The Geotechnical Engineering Unit is collaborating with the Structure Design Unit to develop a plan of action to stabilize the pile-supported roadway slabs.
  • The nearby bascule bridge is scheduled for replacement in 2012/13. An upgrade of the control table for the newer bascule is to be included in the project. It was suggested that the permanent solution to stabilize the roadway slabs be part of the bridge replacement project.

ACTION ITEM(S):

  • None

  • picture 1 picture 2 picture 3 picture 4 picture 5 picture 6 picture 7 picture 8
     
    picture 9 picture 10 picture 11 picture 12 picture 13 picture 14 picture 15 picture 16
     
    picture 17 picture 18 picture 19 picture 20 picture 21 picture 22 picture 23 picture 24
     
    picture 25 picture 26 picture 27 picture 28 picture 29 picture 30 picture 31 picture 32



    spacer spacer
    spacer
     
    North Carolina DOT Logo   The North Carolina
    Department of Transportation