This bidtabs sheet is in English units. The Metric Units version is also available.
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 1
AVERAGE UNIT BIDS
DATE 9901-9912
COMPLETE FILE FOR THIS PERIOD
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
***** JAN 1999 *****
12/01 F-3310 8.1171701 CRAVEN 10,768,441.00 MSC FBD 0.000 0 0 0 1 2 17
PROJECT TOTAL = 10,768,441.00 HALTER MARINE, INC.
13/01 R-2001 6.201016 LENOIR 9,290,697.46 RWY 1,778 5.225 2 0 0 L U C 1 2 20
13/02 R-2001 6.201016 LENOIR 166,491.44 RWY 0.000 0 0 0 L U C 1 2 20 DEEP RUN COS
13/03 R-2001 6.201016 LENOIR 143,297.76 CLV 0.000 1 2 3 L U C 1 2 20 450+65.00-L-
13/04 R-2001 6.201016 LENOIR 91,012.34 CLV 0.000 1 202 4 L U C 1 2 20 536+87.19-L
PROJECT TOTAL = 9,691,499.00 BARRUS CONSTRUCTION CO
14/01 4.6021201 CRAVEN 56,748.60 SUR 57 1.000 2 0 0 S 1 2 17 MAP 32
14/02 7.1611093 CARTERET 514,797.00 SUR 47 11.000 2 0 0 S 1 2 16 MAPS 1-2
14/03 7.1621093 CARTERET 311,014.00 SUR 35 8.800 2 0 0 S 1 2 16 MAPS 3-10
14/04 7.1670993 CARTERET 102,699.99 SUR 60 1.700 2 0 0 S 1 2 16 MAPS 11-12
14/05 7.1721093 CRAVEN 284,125.00 SUR 34 8.450 2 0 0 S 1 2 17 MAPS 13-20
14/06 7.1921093 JONES 173,021.00 SUR 27 6.450 2 0 0 S 1 2 19 MAPS 21-25
14/07 7.2121093 PAMLICO 151,649.00 SUR 35 4.300 2 0 0 S 1 2 21 MAPS 26-30
14/08 7.2174393 PAMLICO 12,681.00 SUR 36 0.350 2 0 0 S 1 2 21 MAP 31
PROJECT TOTAL = 1,606,735.59 BARRUS CONSTRUCTION CO
15/01 7.1511094 BEAUFORT 306,035.18 SUR 70 4.400 2 0 0 S 1 2 15 MAPS 1-4
15/02 7.1521094 BEAUFORT 476,921.05 SUR 27 17.900 2 0 0 S 1 2 15 MAPS 5-16
15/03 7.1570594 BEAUFORT 45,047.62 SUR 38 1.200 2 0 0 S 1 2 15 MAP 18
15/04 7.1574894 BEAUFORT 280,175.64 SUR 140 2.000 2 0 0 S 1 2 15 MAP 17
15/05 7.1821094 GREENE 233,873.65 SUR 25 9.400 2 0 0 S 1 2 18 MAPS 19-21
15/06 7.2011094 LENOIR 28,143.08 SUR 35 0.800 2 0 0 S 1 2 20 MAP 22
15/07 7.2021094 LENOIR 424,790.85 SUR 25 17.050 2 0 0 S 1 2 20 MAPS 23-32
15/08 7.2072494 LENOIR 983,255.54 SUR 129 7.600 2 0 0 S 1 2 20 MAPS 33-37
15/09 7.2211094 PITT 96,635.60 SUR 46 2.100 2 0 0 S 1 2 22 MAP 38
15/10 7.2221094 PITT 466,417.25 SUR 25 18.700 2 0 0 S 1 2 22 MAPS 39-46
PROJECT TOTAL = 3,341,295.46 GREENVILLE PAVING &
16/01 U-3616 9.8031471 ONSLOW 4,328,489.05 RWY 1,352 3.202 4 0 0 S S U 1 3 26
16/02 U-3616 9.8031471 ONSLOW 11,433.00 RWY 0.000 0 0 0 S S U 1 3 26 JACKSONVILLE
PROJECT TOTAL = 4,339,922.05 MORTON TRUCKING, INC.
17/01 7.3521304 DURHAM 635,096.90 SUR 32 19.610 2 0 0 S 2 5 35 MAPS 5-17
17/02 7.3570504 DURHAM 383,409.39 SUR 72 5.340 2 0 0 S 2 5 35 MAPS 1-4
PROJECT TOTAL = 1,018,506.29 REA CONSTRUCTION COMPA
18/01 7.3611305 FRANKLIN 294,024.66 SUR 91 3.240 2 0 0 S 2 5 36 MAP 1
18/02 7.3621305 FRANKLIN 510,343.17 SUR 35 14.400 2 0 0 S 2 5 36 MAPS 4-9
18/03 7.3670605 FRANKLIN 21,367.08 SUR 36 0.600 2 0 0 S 2 5 36 MAPS 2-3
PROJECT TOTAL = 825,734.91 S. T. WOOTEN CORPORATI
19/01 7.3711306 GRANVILLE 289,085.34 SUR 38 7.700 2 0 0 S 2 5 37 MAP 1
19/02 7.3721306 GRANVILLE 395,924.35 SUR 35 11.300 2 0 0 S 2 5 37 MAPS 2-5
PROJECT TOTAL = 685,009.69 REA CONSTRUCTION COMPA
20/01 7.3811307 PERSON 249,989.71 SUR 93 2.700 2 0 0 S 2 5 38 MAP 1
20/02 7.3821307 PERSON 385,189.03 SUR 44 8.700 2 0 0 S 2 5 38 MAPS 2-5
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 2
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
PROJECT TOTAL = 635,178.74 APAC-VIRGINIA, INC.
21/01 7.3921308 VANCE 292,621.83 SUR 46 6.340 2 0 0 S 2 5 39 MAPS 1-4
21/02 7.3970908 VANCE 88,655.88 SUR 57 1.560 2 0 0 S 2 5 39 MAP 6
21/03 7.3971108 VANCE 11,158.25 SUR 33 0.340 2 0 0 S 2 5 39 MAPS 5
PROJECT TOTAL = 392,435.96 S. T. WOOTEN CORPORATI
22/01 7.4011309 WAKE 564,260.96 SUR 88 6.400 2 0 0 S 2 5 40 MAPS 1-2
22/02 7.4021309 WAKE 1,202,426.99 SUR 58 20.810 2 0 0 S 2 5 40 MAPS 3-21
22/03 7.4071709 WAKE 143,673.24 SUR 45 3.200 2 0 0 S 2 5 40 MAP 29
22/04 7.4072009 WAKE 586,242.89 SUR 82 7.120 2 0 0 S 2 5 40 MAPS 22-27
22/05 7.4072709 WAKE 14,914.68 SUR 37 0.400 2 0 0 S 2 5 40 MAP 28
PROJECT TOTAL = 2,511,518.76 REA CONSTRUCTION COMPA
23/01 7.4121310 WARREN 335,578.20 SUR 34 9.900 2 0 0 S 2 5 41 MAP 1-3
23/02 7.4171810 WARREN 33,975.70 SUR 68 0.500 2 0 0 S 2 5 41 MAP 4
PROJECT TOTAL = 369,553.90 S. T. WOOTEN CORPORATI
24/01 7.4611142 ROBESON 470,614.07 SUR 46 10.320 2 0 0 S 1 6 46 MAPS 1-4
24/02 7.4621142 ROBESON 615,665.30 SUR 31 19.850 2 0 0 S 1 6 46 MAPS 5-15
24/03 7.4672742 ROBESON 116,161.67 SUR 70 1.670 2 0 0 S 1 6 46 MAPS 16-17
PROJECT TOTAL = 1,202,441.04 CROWELL CONSTRUCTORS,
25/01 5.5121161 ROCKINGHA 134,313.60 SUR 47 2.850 2 0 0 S 2 7 51 MAPS 1-3
25/02 7.4972624 GUILFORD 22,699.00 SUR 31 0.740 2 0 0 S 2 7 49 MAP 4
25/03 7.5111224 ROCKINGHA 340,143.90 SUR 41 8.210 2 0 0 S 2 7 51 MAPS 5-8
25/04 7.5121224 ROCKINGHA 288,089.00 SUR 42 6.790 2 0 0 S 2 7 51 MAPS 9-12
25/05 7.5172024 ROCKINGHA 110,767.28 SUR 51 2.190 2 0 0 S 2 7 51 MAP 13
25/06 7.5172224 ROCKINGHA 159,103.13 SUR 97 1.640 2 0 0 S 2 7 51 MAPS 14-15
25/07 7.5173324 ROCKINGHA 150,377.30 SUR 41 3.700 2 0 0 S 2 7 51 MAP 16
PROJECT TOTAL = 1,205,493.21 THOMPSON-ARTHUR PAVING
26/01 7.4970826 GUILFORD 437,119.35 SUR 173 2.520 2 0 0 S 2 7 49 MAPS 1-3
26/02 7.4971026 GUILFORD 107,599.25 SUR 154 0.700 2 0 0 S 2 7 49 MAP 4
PROJECT TOTAL = 544,718.60 LARCO CONST. CO., A DI
27/01 7.4911225 GUILFORD 173,597.21 SUR 39 4.440 2 0 0 S 2 7 49 MAP 1
27/02 7.4921225 GUILFORD 589,482.82 SUR 31 18.740 2 0 0 S 2 7 49 MAPS 2-12
27/03 7.4970825 GUILFORD 13,022.72 SUR 33 0.400 2 0 0 S 2 7 49 MAPS 13-14
27/04 7.4972925 GUILFORD 121,764.94 SUR 46 2.620 2 0 0 S 2 7 49 MAP 15
PROJECT TOTAL = 897,867.69 MOFFITT & PIERCE CONST
28/01 W-2940 8.7354005 LEE 299,119.46 SUR STP 230 1.300 4 0 0 S 2 8 54 MAP 14
28/02 W-2940 7.5411042 LEE 426,839.50 SUR 46 9.270 2 0 0 S 2 8 54 MAPS1-4
28/03 W-2940 7.5421042 LEE 245,844.66 SUR 30 8.170 2 0 0 S 2 8 54 MAPS 5-11
28/04 W-2940 7.5473742 LEE 71,862.50 SUR 26 2.760 2 0 0 S 2 8 54 MAPS 12-13
PROJECT TOTAL = 1,043,666.12 LEE PAVING COMPANY
29/01 7.5211042 CHATHAM 634,056.50 SUR 64 9.960 2 0 0 S 2 8 52 MAPS 1-5
29/02 7.5221042 CHATHAM 443,162.15 SUR 31 14.380 2 0 0 S 2 8 52 MAPS 6-12
29/03 7.5271542 CHATHAM 6,230.50 SUR 25 0.250 2 0 0 S 2 8 52 MAP 13
29/04 7.5273042 CHATHAM 59,998.40 SUR 51 1.180 3 0 0 S 2 8 52 MAPS 14-15
PROJECT TOTAL = 1,143,447.55 LEE PAVING COMPANY
30/01 7.5311038 HOKE 127,986.00 SUR 31 4.120 2 0 0 S 2 8 53 MAP 1
30/02 7.5321038 HOKE 195,177.69 SUR 21 9.300 2 0 0 S 2 8 53 MAPS 2-8
30/03 7.5373138 HOKE 61,125.00 SUR 44 1.390 2 0 0 S 2 8 53 MAP 9
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 3
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
PROJECT TOTAL = 384,288.69 LEE PAVING COMPANY
31/01 7.5511042 MONTGOMER 254,535.57 SUR 36 7.050 2 0 0 S 2 8 55 MAP 1
31/02 7.5521042 MONTGOMER 192,622.89 SUR 26 7.370 2 0 0 S 2 8 55 MAPS 2-5
31/03 7.5572642 MONTGOMER 42,358.62 SUR 42 1.000 2 0 0 S 2 8 55 MAPS 6-8
31/04 7.5574442 MONTGOMER 109,189.47 SUR 77 1.410 3 0 0 S 2 8 55 MAPS 9-12
PROJECT TOTAL = 598,706.55 MOFFITT & PIERCE CONST
32/01 7.5611041 MOORE 124,986.00 SUR 33 3.820 2 0 0 S 2 8 56 MAP 1
32/02 7.5621041 MOORE 467,167.71 SUR 24 19.420 2 0 0 S 2 8 56 MAPS 2-8
32/03 7.5670141 MOORE 11,366.04 SUR 28 0.400 2 0 0 S 2 8 56 MAP 9
32/04 7.5670941 MOORE 69,616.50 SUR 65 1.070 2 0 0 S 2 8 56 MAPS 10-11
32/05 7.5674541 MOORE 22,563.80 SUR 25 0.900 2 0 0 S 2 8 56 MAP 12
PROJECT TOTAL = 695,700.05 LEE PAVING COMPANY
33/01 7.5711049 RANDOLPH 283,320.60 SUR 52 5.430 2 0 0 S 2 8 57 MAPS 1-3
33/02 7.5721049 RANDOLPH 725,397.56 SUR 27 26.490 2 0 0 S 2 8 57 MAPS 4-18
33/03 7.5770249 RANDOLPH 31,993.69 SUR 37 0.860 2 0 0 S 2 8 57 MAP 19
33/04 7.5770349 RANDOLPH 136,888.60 SUR 76 1.790 4 0 0 S 2 8 57 MAPS 20-23
33/05 7.5775049 RANDOLPH 53,885.27 SUR 21 2.510 2 0 0 S 2 8 57 MAPS 24-30
PROJECT TOTAL = 1,231,485.72 MOFFITT & PIERCE CONST
34/01 7.5811044 RICHMOND 196,038.00 SUR 40 4.850 2 0 0 S 2 8 58 MAPS 1-2
34/02 7.5821044 RICHMOND 402,974.70 SUR 25 16.320 2 0 0 S 2 8 58 MAPS 3-20
34/03 7.5873644 RICHMOND 25,759.30 SUR 32 0.810 2 0 0 S 2 8 58 MAPS 21-22
PROJECT TOTAL = 624,772.00 HIGHWAY CONSTRUCTORS,
35/01 7.5911036 SCOTLAND 240,494.51 SUR 33 7.280 2 0 0 S 2 8 59 MAP 1
35/02 7.5921036 SCOTLAND 253,147.08 SUR 23 11.010 2 0 0 S 2 8 59 MAPS 2-10
35/03 7.5972136 SCOTLAND 109,921.24 SUR 41 2.650 2 0 0 S 2 8 59 MAPS 11-13
PROJECT TOTAL = 603,562.83 MOFFITT & PIERCE CONST
37/01 7.8321270 LINCOLN 536,478.72 SUR 44 12.200 2 0 0 S 2 12 83 MAP 1-3
37/02 7.8372170 LINCOLN 25,613.25 SUR 45 0.570 2 0 0 S 2 12 83 MAP 4
PROJECT TOTAL = 562,091.97 MIDSTATE CONTRACTORS,
39/01 7.8411210 BUNCOMBE 355,917.71 SUR 61 5.800 2 0 0 S 3 13 84 MAPS 1-2
39/02 7.8421210 BUNCOMBE 514,443.86 SUR 41 12.520 2 0 0 S 3 13 84 MAPS 3-21
39/03 7.8470210 BUNCOMBE 316,576.80 SUR 151 2.100 2 0 0 S 3 13 84 MAPS 22-23
PROJECT TOTAL = 1,186,938.37 ASHEVILLE DIVISION,
40/01 7.8511207 BURKE 467,266.35 SUR 59 7.950 2 0 0 S 3 13 85 MAPS 1-6
40/02 7.8521207 BURKE 898,470.97 SUR 41 21.980 2 0 0 S 3 13 85 MAPS 7-33
40/03 7.8571907 BURKE 28,743.07 SUR 59 0.490 2 0 0 S 3 13 85 MAPS 34-36
PROJECT TOTAL = 1,394,480.39 CENTRAL CAROLINA DIVIS
41/01 7.8611211 MADISON 796,368.25 SUR 177 4.500 2 0 0 S 4 13 86 MAPS 1-2
41/02 7.8621211 MADISON 218,961.67 SUR 45 4.900 1 0 0 S 4 13 86 MAPS 3-6
41/03 7.8671711 MADISON 64,553.17 SUR 47 1.360 1 0 0 S 4 13 86 MAPS 7-8
41/04 7.8671811 MADISON 26,908.86 SUR 37 0.730 1 0 0 S 4 13 86 MAP 9
41/05 7.9011211 YANCEY 267,765.35 SUR 41 6.500 1 0 0 S 4 13 90 MAP 10
41/06 7.9021211 YANCEY 111,159.07 SUR 41 2.720 1 0 0 S 4 13 90 MAPS 11-13
41/07 7.9070711 YANCEY 14,049.81 SUR 39 0.360 1 0 0 S 4 13 90 MAPS 14-15
PROJECT TOTAL = 1,499,766.18 ASHEVILLE DIVISION,
42/01 7.8711208 MCDOWELL 309,590.71 SUR 47 6.540 2 0 0 S 3 13 87 MAPS 1-4
42/02 7.8721208 MCDOWELL 423,055.87 SUR 40 10.700 2 0 0 S 3 13 87 MAPS 5-13
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 4
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
42/03 7.8771608 MCDOWELL 215,758.21 SUR 123 1.760 2 0 0 S 3 13 87 MAP 14
42/04 7.8811208 MITCHELL 143,288.01 SUR 59 2.420 2 0 0 S 4 13 88 MAP 15-16
42/05 7.8821208 MITCHELL 155,161.50 SUR 38 4.040 2 0 0 S 4 13 88 MAP 17-22
42/06 7.8870308 MITCHELL 24,824.78 SUR 44 0.560 2 0 0 S 4 13 88 MAP 23
PROJECT TOTAL = 1,271,679.08 THOMPSON CONTRACTORS,
43/01 7.8911209 RUTHERFOR 630,021.76 SUR 52 12.090 1 0 0 S 3 13 89 MAPS 1-5
43/02 7.8921209 RUTHERFOR 748,091.00 SUR 53 14.230 1 0 0 S 3 13 89 MAPS 6-18
43/03 7.8970109 RUTHERFOR 4,097.80 SUR 41 0.100 1 0 0 S 3 13 89 MAP 19
43/04 7.8970909 RUTHERFOR 16,127.64 SUR 45 0.360 1 0 0 S 3 13 89 MAP 20
43/05 7.8971509 RUTHERFOR 82,156.50 SUR 54 1.520 1 0 0 S 3 13 89 MAPS 21-22
43/06 7.8972309 RUTHERFOR 5,084.64 SUR 51 0.100 1 0 0 S 3 13 89 MAP 23
PROJECT TOTAL = 1,485,579.34 THOMPSON CONTRACTORS,
44/01 B-2172 8.1000701 TRANSYLVA 290,481.75 RWY BRS 3,378 0.086 2 0 0 C 4 14 100
44/02 B-2172 8.1000701 TRANSYLVA 187,227.50 CLV BRS 0.009 1 2 5 C 4 14 100 16+11.500 L
PROJECT TOTAL = 477,709.25 CAROLINA MTN. CONSTRUC
***** JAN 1999 TOTAL = $54,240,225.98
***** FEB 1999 *****
09/01 K-3601 8.1242101 DUPLIN 321,800.00 MSC IMS 0.000 0 0 0 1 3 24
PROJECT TOTAL = 321,800.00 DIXIE GENERAL CONTRACT
10/01 7.2311128 BRUNSWICK 789,988.95 SUR 163 4.850 2 0 0 S 1 3 23 MAPS 1-6
10/02 7.2321123 BRUNSWICK 241,150.75 SUR 41 5.900 2 0 0 S 1 3 23 MAPS 7-9
10/03 7.2511123 NEW HANOV 322,350.70 SUR 806 0.400 2 0 0 S 1 3 25 MAPS 10-11
10/04 7.2511128 NEW HANOV 148,726.35 SUR 165 0.900 2 0 0 S 1 3 25 MAPS 12-16
10/05 7.2821123 NEW HANOV 231,707.10 SUR 42 5.580 2 0 0 S 1 3 25 MAPS 17-33
10/06 7.2721123 PENDER 272,817.75 SUR 61 4.500 2 0 0 S 1 3 27 MAPS 34-35
10/07 7.2770123 PENDER 175,426.20 SUR 175 1.000 2 0 0 S 1 3 27 MAP 36
PROJECT TOTAL = 2,182,167.80 BARRUS CONSTRUCTION CO
11/01 R-4027 8.1321601 NASH 1,142,161.75 RWY NHS 110 10.400 4 0 0 2 4 32
PROJECT TOTAL = 1,142,161.75 L. S. LEE, INC.
12/01 B-3070 8.2330801 WAYNE 420,411.93 RWY BRS 5,532 0.076 2 0 0 S S U C 2 4 33
12/02 B-3070 8.2330801 WAYNE 349,667.40 CLV BRS 0.009 1 4 3 S S U C 2 4 33 18+55.00 -L-
PROJECT TOTAL = 770,079.33 SANFORD CONTRACTORS, I
13/01 B-3085 8.2341501 WILSON 135,023.40 RWY BRZ 1,709 0.079 2 614 0 B 2 4 34
13/02 B-3085 8.2341501 WILSON 260,898.22 BRG BRZ Q 0.023 3 721 15 B 2 4 34 13+90.000 -L
PROJECT TOTAL = 395,921.62 S. T. WOOTEN CORPORATI
15/01 7.4411135 CUMBERLAN 158,338.33 SUR 48 3.280 1 0 0 S 1 6 44 MAP 1
15/02 7.4411145 CUMBERLAN 419,766.57 SUR 41 10.240 1 0 0 S 1 6 44 MAPS 4-6
15/03 7.4421138 CUMBERLAN 47,240.66 SUR 27 1.740 1 0 0 S 1 6 44 MAP 3
15/04 7.4421145 CUMBERLAN 806,920.56 SUR 43 18.580 1 0 0 S 1 6 44 MAPS 9-16
15/05 7.4472036 CUMBERLAN 171,530.43 SUR 746 0.230 1 0 0 S 1 6 44 MAP 2
15/06 7.4472045 CUMBERLAN 928,556.52 SUR 225 4.120 1 0 0 S 1 6 44 MAPS 17-23
15/07 7.4474345 CUMBERLAN 83,180.03 SUR 72 1.150 1 0 0 S 1 6 44 MAP 24
PROJECT TOTAL = 2,615,533.10 BARNHILL CONTRACTING C
16/01 7.4511144 HARNETT 234,509.34 SUR 39 6.050 2 0 0 S 2 6 45 MAP 1
16/02 7.4521144 HARNETT 376,157.37 SUR 34 10.930 2 0 0 S 2 6 45 MAPS 2-5
16/03 7.4571344 HARNETT 40,234.59 SUR 32 1.260 2 0 0 S 2 6 45 MAP 6
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 5
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
PROJECT TOTAL = 650,901.30 BARNHILL CONTRACTING C
17/01 B-2609 8.1580901 RICHMOND 128,832.75 RWY BRS 1,047 0.123 2 0 0 B 2 8 58
17/02 B-2609 8.1580901 RICHMOND 221,500.73 BRG BRS Q 0.019 2 721 15 B 2 8 58 18+44.00-L-
PROJECT TOTAL = 350,333.48 SANFORD CONTRACTORS, I
18/01 R-4014 8.1623601 FORSYTH 3,144,676.50 MSC NHS 114 27.500 2 0 0 2 9 62
PROJECT TOTAL = 3,144,676.50 THE RUTH COMPANY
19/01 7.6011176 DAVIDSON 337,918.94 SUR 48 7.100 1 0 0 S 2 9 60 MAPS 1 & 2
19/02 7.6021176 DAVIDSON 1,509,627.59 SUR 44 34.070 1 0 0 S 2 9 60 MAPS 3-25
19/03 7.6070476 DAVIDSON 72,327.42 SUR 132 0.550 1 0 0 S 2 9 60 MAP 26
19/04 7.6071176 DAVIDSON 18,803.82 SUR 67 0.280 1 0 0 S 2 9 60 MAP 27
PROJECT TOTAL = 1,938,677.77 LARCO CONST. CO., A DI
20/01 7.6111172 DAVIE 79,629.18 SUR 59 1.340 2 0 0 S 2 9 61 MAPS 1-2
20/02 7.6121172 DAVIE 182,085.29 SUR 59 3.100 2 0 0 S 2 9 61 MAP 3
20/03 7.6171272 DAVIE 155,991.54 SUR 82 1.900 2 0 0 S 2 9 61 MAPS 4-5
PROJECT TOTAL = 417,706.01 LARCO CONST. CO., A DI
21/01 7.6211173 FORSYTH 55,189.65 SUR 41 1.350 2 0 0 S 2 9 62 MAP 1
21/02 7.6411173 STOKES 209,664.36 SUR 40 5.200 2 0 0 S 2 9 64 MAP 2
21/03 7.6421173 STOKES 647,414.80 SUR 47 13.730 2 0 0 S 2 9 64 MAPS 3-8
PROJECT TOTAL = 912,268.81 LARCO CONST. CO., A DI
22/01 7.6221175 FORSYTH 744,307.00 SUR 0.000 2 0 0 S 2 9 62 MAPS 1-7
22/02 7.6270975 FORSYTH 37,352.07 SUR 0.000 2 0 0 S 2 9 62 MAP 8
22/03 7.6271875 FORSYTH 915,299.27 SUR 0.000 2 0 0 S 2 9 62 MAPS 9-21
22/04 7.6272375 FORSYTH 35,925.30 SUR 0.000 2 0 0 S 2 9 62 MAP 22
22/05 7.6272675 FORSYTH 117,626.43 SUR 0.000 2 0 0 S 2 9 62 MAP 23
22/06 7.6272875 FORSYTH 91,346.90 SUR 0.000 2 0 0 S 2 9 62 MAP 24
PROJECT TOTAL = 1,941,856.97 LARCO CONST. CO., A DI
23/01 7.6311171 ROWAN 560,236.12 SUR 57 9.770 2 0 0 S 2 9 63 MAPS 1-3
23/02 7.6321171 ROWAN 702,777.09 SUR 51 13.770 2 0 0 S 2 9 63 MAPS 4-11
23/03 7.6371371 ROWAN 124,545.94 SUR 82 1.510 2 0 0 S 2 9 63 MAP 12
23/04 7.6371471 ROWAN 225,011.51 SUR 201 1.120 2 0 0 S 2 9 63 MAPS 13-14
PROJECT TOTAL = 1,612,570.66 BLYTHE CONSTRUCTION, I
24/01 B-2590 8.2673201 MECKLENBG 240,242.65 RWY BRZ 1,741 0.138 2 0 0 C B 2 10 67
24/02 B-2590 8.2673201 MECKLENBG 201,252.66 CLV BRZ 0.007 1 3 13 C B 2 10 67 13+17.00 -L-
PROJECT TOTAL = 441,495.31 DANE CONSTRUCTION, INC
25/01 7.6511203 ANSON 199,115.12 SUR 83 2.400 2 0 0 S 2 10 65 MAP 1
25/02 7.6521203 ANSON 588,273.85 SUR 47 12.450 2 0 0 S 2 10 65 MAPS 2-4
25/03 7.6571603 ANSON 35,410.03 SUR 80 0.440 2 0 0 S 2 10 65 MAP 5
PROJECT TOTAL = 822,799.00 BOGGS PAVING, INC.
26/01 7.6911207 UNION 516,920.42 SUR 100 5.150 2 0 0 S 2 10 69 MAPS 1 & 2
26/02 7.6921207 UNION 1,121,970.78 SUR 47 23.690 2 0 0 S 2 10 69 MAPS 3-12
26/03 7.6971207 UNION 267,490.52 SUR 177 1.510 2 0 0 S 2 10 69 MAP 13
26/04 7.6971507 UNION 84,434.08 SUR 70 1.200 2 0 0 S 2 10 69 MAP 14
PROJECT TOTAL = 1,990,815.80 BOGGS PAVING, INC.
27/01 7.7011214 ALLEGHANY 267,156.24 SUR 34 7.830 2 0 0 S 3 11 70 MAPS 1-3
27/02 7.7021214 ALLEGHANY 158,130.20 SUR 37 4.290 2 0 0 S 3 11 70 MAPS 4-5
27/03 7.7072514 ALLEGHANY 22,960.36 SUR 49 0.470 2 0 0 S 3 11 70 MAP 6
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 6
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
27/04 7.7111214 ASHE 203,054.40 SUR 57 3.560 2 0 0 S 4 11 71 MAPS 7-8
27/05 7.7121214 ASHE 300,962.08 SUR 36 8.430 2 0 0 S 4 11 71 MAPS 9-12
27/06 7.7171314 ASHE 147,930.76 SUR 168 0.880 2 0 0 S 4 11 71 MAP 13
27/07 7.7172814 ASHE 75,813.68 SUR 138 0.550 2 0 0 S 4 11 71 MAP 14
PROJECT TOTAL = 1,176,007.72 JAMES R. VANNOY & SONS
28/01 7.7211215 AVERY 266,638.00 SUR 43 6.250 2 0 0 S 4 11 72 MAPS
28/02 7.7221215 AVERY 41,711.00 SUR 43 0.960 2 0 0 S 4 11 72 MAPS
28/03 7.7270615 AVERY 48,832.00 SUR 42 1.160 2 0 0 S 4 11 72 MAPS
28/04 7.7511215 WATAUGA 528,021.00 SUR 63 8.320 2 0 0 S 4 11 75 MAP
28/05 7.7521215 WATAUGA 209,143.00 SUR 53 3.950 2 0 0 S 4 11 75 MAPS
28/06 7.7570415 WATAUGA 283,877.40 SUR 177 1.600 2 0 0 S 4 11 75 MAPS
PROJECT TOTAL = 1,378,222.40 MAYMEAD, INC.
29/01 7.7311216 CALDWELL 151,900.50 SUR 33 4.560 1 0 0 S 3 11 73 MAPS 1-3
29/02 7.7321216 CALDWELL 323,374.50 SUR 38 8.500 1 0 0 S 3 11 73 MAPS 4-8
29/03 7.7373716 CALDWELL 30,586.50 SUR 33 0.930 1 0 0 S 3 11 73 MAPS 9-10
29/04 7.7611216 WILKES 358,287.00 SUR 46 7.870 1 0 0 S 3 11 76 MAPS 11-13
29/05 7.7621216 WILKES 604,263.50 SUR 36 16.940 1 0 0 S 3 11 76 MAPS 14-21
29/06 7.7672916 WILKES 68,565.00 SUR 60 1.150 1 0 0 S 3 11 76 MAPS 22-24
PROJECT TOTAL = 1,536,977.00 CARL ROSE & SONS, INC.
30/01 7.7411217 SURRY 307,355.59 SUR 47 6.560 2 0 0 S 2 11 74 MAPS 1-3
30/02 7.7421217 SURRY 401,533.30 SUR 34 11.750 2 0 0 S 2 11 74 MAPS 4-14
30/03 7.7470917 SURRY 18,644.41 SUR 39 0.480 2 0 0 S 2 11 74 MAP 15
30/04 7.7471717 SURRY 62,976.17 SUR 76 0.830 2 0 0 S 2 11 74 MAPS 16-17
30/05 7.7472117 SURRY 9,091.89 SUR 30 0.300 2 0 0 S 2 11 74 MAP 18
30/06 7.7711217 YADKIN 251,140.56 SUR 46 5.460 2 0 0 S 2 11 77 MAPS 19-21
30/07 7.7721217 YADKIN 369,331.13 SUR 35 10.520 2 0 0 S 2 11 77 MAPS 22-25
PROJECT TOTAL = 1,420,073.05 VIRGINIA CAROLINA PAVI
31/01 7.7111220 ASHE 465,875.75 SUR 52 9.010 2 0 0 S 4 11 71 MAPS 1-3
31/02 7.7211220 AVERY 229,153.55 SUR 59 3.900 2 0 0 S 4 11 72 MAPS 4-5
PROJECT TOTAL = 695,029.30 MAYMEAD, INC.
32/01 5.7421098 SURRY 145,375.19 SUR 11 12.750 2 0 0 S 2 11 74 MAPS 1-37
32/02 7.7311219 CALDWELL 61,319.52 SUR 11 5.700 2 0 0 S 3 11 73 MAP 38
32/03 7.7421219 SURRY 145,093.50 SUR 11 12.630 2 0 0 S 2 11 74 MAPS 39-46
32/04 7.7621219 WILKES 143,665.90 SUR 11 13.140 2 0 0 S 3 11 76 MAPS 47-56
32/05 7.7721219 YADKIN 117,788.06 SUR 12 10.170 2 0 0 S 2 11 77 MAPS 57-61
PROJECT TOTAL = 613,242.17 MAYMEAD, INC.
33/01 5.7221097 AVERY 75,480.48 SUR 11 6.670 2 0 0 S 4 11 72 MAPS 1-8
33/02 7.7021218 ALLEGHANY 33,734.02 SUR 13 2.690 2 0 0 S 3 11 70 MAPS 9-11
33/03 7.7121218 ASHE 99,644.15 SUR 11 9.270 2 0 0 S 4 11 71 MAPS 12-20
33/04 7.7221218 AVERY 99,964.59 SUR 12 8.590 2 0 0 S 4 11 72 MAPS 21-24
33/05 7.7273218 AVERY 4,848.79 SUR 12 0.420 2 0 0 S 4 11 72 MAPS 24A-26
33/06 7.7521218 WATAUGA 93,730.68 SUR 11 8.570 2 0 0 S 4 11 75 MAPS 27-42
PROJECT TOTAL = 407,402.71 MAYMEAD, INC.
34/01 I-4031 8.1801701 CLEVELAND 682,661.75 RWY IMS 89 7.670 2 0 0 3 12 80
PROJECT TOTAL = 682,661.75 BAGWELL FENCE COMPANY,
35/01 I-4007 8.1822801 IREDELL 661,142.10 RWY IMS 42 15.567 4 0 0 2 12 82
PROJECT TOTAL = 661,142.10 L. S. LEE, INC.
36/01 R-4030 8.1890901 RUTHERFOR 378,322.10 RWY NHS 45 8.416 4 0 0 3 13 89
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 7
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
PROJECT TOTAL = 378,322.10 BAGWELL FENCE COMPANY,
37/01 R-4033 8.1991301 SWAIN 1,001,564.85 RWY NHS 119 8.390 2 0 0 4 14 99
PROJECT TOTAL = 1,001,564.85 THE RUTH COMPANY
38/01 7.9421097 HAYWOOD 241,067.35 SUR 45 5.300 2 0 0 S 4 14 94 MAPS 1-6
38/02 7.9472297 HAYWOOD 59,576.30 SUR 56 1.070 2 0 0 S 4 14 94 MAP 7
38/03 7.9611097 JACKSON 101,888.75 SUR 97 1.050 2 0 0 S 4 14 96 MAP 8
38/04 7.9621097 JACKSON 265,190.95 SUR 44 6.030 2 0 0 S 4 14 96 MAPS 9-12
38/05 7.9670597 JACKSON 31,413.50 SUR 27 1.150 2 0 0 S 4 14 96 MAPS 13-14
PROJECT TOTAL = 699,136.85 HARRISON CONST. CO., I
39/01 7.9721096 MACON 187,425.25 SUR 46 4.080 2 0 0 S 4 14 97 MAPS 1-5
39/02 7.9771096 MACON 7,809.25 SUR 35 0.220 2 0 0 S 4 14 97 MAP 6
39/03 7.9921096 SWAIN 122,932.25 SUR 44 2.800 1 0 0 S 4 14 99 MAPS 7-8
PROJECT TOTAL = 318,166.75 HARRISON CONST. CO., I
40/01 6.912343 CHEROKEE 35,264.35 SUR 107 0.330 2 0 0 S 4 14 91 MAP 1
40/02 7.9121095 CHEROKEE 205,628.80 SUR 38 5.350 2 0 0 S 4 14 91 MAPS 2-7
40/03 7.9171695 CHEROKEE 13,394.00 SUR 42 0.320 2 0 0 S 4 14 91 MAP 8
40/04 7.9221095 CLAY 94,612.40 SUR 39 2.420 2 0 0 S 4 14 92 MAPS 9-10
40/05 7.9321095 GRAHAM 111,106.00 SUR 49 2.260 2 0 0 S 4 14 93 MAP 11
PROJECT TOTAL = 460,005.55 HARRISON CONST. CO., I
41/01 7.0011099 TRANSYLVA 714,634.80 SUR 91 7.850 2 0 0 S 4 14 100 MAP 1
41/02 7.0021099 TRANSYLVA 150,223.50 SUR 25 5.920 2 0 0 S 4 14 100 MAPS 2-9
41/03 7.0070299 TRANSYLVA 50,261.25 SUR 90 0.560 2 0 0 S 4 14 100 MAP 10
41/04 7.9511099 HENDERSON 590,522.76 SUR 122 4.860 2 0 0 S 4 14 95 MAPS 11-16
41/05 7.9521099 HENDERSON 492,927.00 SUR 26 19.200 2 0 0 S 4 14 95 MAPS 17-27
41/06 7.9571399 HENDERSON 238,517.00 SUR 262 0.910 2 0 0 S 4 14 95 MAP 28
41/07 7.9821099 POLK 224,441.70 SUR 35 6.340 2 0 0 S 3 14 98 MAPS 29-38
PROJECT TOTAL = 2,461,528.01 ASHEVILLE DIVISION,
42/01 I-2201 6.499012T GUILFORD 1,631,782.80 MSC 1,084 1.505 1 0 0 L 2 7 49
PROJECT TOTAL = 1,631,782.80 ODEBRECHT CONSTRUCTION
***** FEB 1999 TOTAL = $37,173,030.32
***** MAR 1999 *****
05/01 I-4014 8.1281101 SAMPSON 7,973,501.69 SUR IMS 100 79.780 4 0 0 S 1 3 28 MAPS 1-6
PROJECT TOTAL = 7,973,501.69 BARNHILL CONTRACTING C
06/01 R-4037 8.1404101 WAKE 566,951.80 RWY NHS 80 7.064 4 0 0 2 5 40
PROJECT TOTAL = 566,951.80 L. S. LEE, INC.
07/01 I-4020 8.1404301 WAKE 431,217.60 RWY IMS 52 8.260 4 0 0 2 5 40
PROJECT TOTAL = 431,217.60 L. S. LEE, INC.
09/01 I-4034 8.1661201 MECKLENBG 362,563.70 RWY IMS 50 7.250 4 0 0 2 10 67
PROJECT TOTAL = 362,563.70 L. S. LEE, INC.
10/01 I-4023 8.1822901 IREDELL 2,456,726.00 RWY IMS 99 24.896 4 0 0 2 12 82
PROJECT TOTAL = 2,456,726.00 REYNOLDS FENCE & GUARD
11/01 I-4010 8.1871601 MCDOWELL 1,044,847.30 RWY IMS 75 14.000 4 0 0 3 13 87
PROJECT TOTAL = 1,044,847.30 MAKCO, INC.
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 8
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
12/01 I-4000 8.1951701 HENDERSON 2,609,593.75 RWY IMS 93 28.200 4 0 0 4 14 95
PROJECT TOTAL = 2,609,593.75 THE RUTH COMPANY
13/01 B-3044 8.2590301 SCOTLAND 148,583.00 RWY BRZ 1,228 0.121 2 0 0 SLS B 2 8 59
13/02 B-3044 8.2590301 SCOTLAND 379,845.07 BRG BRZ A 0.046 4 721 15 SLS B 2 8 59 14+22.440 -L
PROJECT TOTAL = 528,428.07 S. T. WOOTEN CORPORATI
14/01 B-2580 8.2821701 IREDELL 316,991.50 RWY BRZ 2,045 0.155 2 0 0 C 2 12 82
14/02 B-2580 8.2821701 IREDELL 247,103.90 CLV BRZ 0.006 1 2 15 C 2 12 82 15+73.92 -L-
PROJECT TOTAL = 564,095.40 MILLER STRUCTURES, INC
15/01 I-4016 8.1844801 BUNCOMBE 3,366,305.50 RWY IMS 109 31.000 4 0 0 3 13 84
PROJECT TOTAL = 3,366,305.50 REYNOLDS FENCE & GUARD
***** MAR 1999 TOTAL = $19,904,230.81
***** APR 1999 *****
09/01 R-3843 8.1151001 BEAUFORT 373,427.20 RWY STP 70 5.350 1 0 0 1 2 15 MAPS 1-9
PROJECT TOTAL = 373,427.20 BAGWELL FENCE COMPANY,
10/01 R-3842 8.1210101 BEAUFORT 528,972.00 RWY STP 68 7.800 1 0 0 1 2 15 MAP 1-13
PROJECT TOTAL = 528,972.00 MAKCO, INC.
11/01 I-4009 8.1312401 JOHNSTON 3,133,887.00 RWY IMS 289 10.835 4 0 0 S 2 4 31
PROJECT TOTAL = 3,133,887.00 S. T. WOOTEN CORPORATI
12/01 U-4000 8.1352001 DURHAM 1,075,694.00 RWY NHS 130 8.290 4 0 0 2 5 35
PROJECT TOTAL = 1,075,694.00 APEX CONTRACTING, INC.
13/01 B-3010 8.2500901 ORANGE 365,443.35 RWY MA 1,124 0.325 2 0 0 S U C 2 7 50
13/02 B-3010 8.2500901 ORANGE 182,594.00 CLV MA 0.006 1 3 13 S U C 2 7 50 20+11.00 -LR
PROJECT TOTAL = 548,037.35 C. C. MANGUM, INC.
14/01 U-3115 9.8100485 CABARRUS 3,445,011.39 RWY 2,486 1.386 6 0 0 S S U 2 10 66
14/02 U-3115 9.8100485 CABARRUS 178,557.75 RWY 0.000 0 0 0 S S U 2 10 66 CONCORD
PROJECT TOTAL = 3,623,569.14 SEALAND CONTRACTORS CO
15/01 I-2807 8.1741303 SURRY 10,315,050.15 RWY IMS 2,579 4.000 4 0 0 S 2 11 74
PROJECT TOTAL = 10,315,050.15 APAC-GEORGIA, INC.
17/01 B-2862 8.2461301 ROBESON 239,032.55 RWY BRZ 1,220 0.196 2 0 0 C B 1 6 46
17/02 B-2862 8.2461301 ROBESON 83,900.70 CLV BRZ 0.006 1 3 4 C B 1 6 46 14+35.00 -L-
17/03 B-2862 8.2461301 ROBESON 258,362.16 BRG BRZ A 0.021 3 721 15 C B 1 6 46 17+85.00 -L-
PROJECT TOTAL = 581,295.41 S. T. WOOTEN CORPORATI
18/01 B-3022 8.2571401 RANDOLPH 235,580.90 RWY BRZ 1,530 0.154 2 612 0 U B 2 8 57
18/02 B-3022 8.2571401 RANDOLPH 427,589.15 BRG BRZ Q 0.035 3 845 15 U B 2 8 57 14+43.50 -L-
PROJECT TOTAL = 663,170.05 JOHN H. BRINKLEY, INC.
19/01 B-2970 8.2623501 FORSYTH 314,328.45 RWY BRZ 1,343 0.234 2 0 0 C 2 9 62
19/02 B-2970 8.2623501 FORSYTH 220,442.69 CLV BRZ 0.008 1 4 14 C 2 9 62 18+50.00 -L-
PROJECT TOTAL = 534,771.14 SMITH-ROWE, INC.
20/01 B-2868 8.2640601 STOKES 313,035.50 RWY BRZ 1,429 0.219 2 0 0 B 2 9 64
20/02 B-2868 8.2640601 STOKES 347,781.38 BRG BRZ Q 0.027 3 736 15 B 2 9 64 16+29.00 -L
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 9
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
PROJECT TOTAL = 660,816.88 THOMPSON-ARTHUR PAVING
21/01 B-3002 8.2871001 MCDOWELL 335,337.63 SUR MA 1,103 0.304 2 0 0 L U B 3 13 87
21/02 B-3002 8.2871001 MCDOWELL 296,601.42 BRG MA Q 0.021 3 718 15 L U B 3 13 87 17+36.00 -L-
PROJECT TOTAL = 631,939.05 R. E. BURNS & SONS CO.
22/01 B-3041 8.2890501 RUTHERFOR 322,045.75 RWY BRZ 2,284 0.141 2 0 0 B 3 13 89
22/02 B-3041 8.2890501 RUTHERFOR 890,666.86 BRG BRZ Q 0.086 6 854 15 B 3 13 89 13+10.00-L-R
PROJECT TOTAL = 1,212,712.61 CROWDER CONSTRUCTION C
23/01 B-3018 8.2980401 POLK 141,289.13 RWY BRZ 1,682 0.084 2 0 0 S B 3 14 98
23/02 B-3018 8.2980401 POLK 330,398.73 BRG BRZ 0.011 1 721 15 S B 3 14 98 12+72.00 -L-
PROJECT TOTAL = 471,687.86 APPLE TUCK & ASSOCIATE
***** APR 1999 TOTAL = $24,355,029.84
***** MAY 1999 *****
06/01 R-3845 8.1052001 DARE 874,400.00 RWY STP 75 11.606 2 0 0 1 1 5
PROJECT TOTAL = 874,400.00 L. S. LEE, INC.
07/01 R-3846 8.1130301 TYRRELL 645,547.50 RWY STP 56 11.483 2 0 0 1 1 13
PROJECT TOTAL = 645,547.50 L. S. LEE, INC.
08/01 U-3115 9.8100488 MECKLENBG 7,188,020.06 RWY 4,465 1.610 6 0 0 S S U C 2 10 67
08/02 U-3115 9.8100488 MECKLENBG 426,290.81 RWY 0.000 0 0 0 S S U C 2 10 67 CMUD
08/03 U-3115 9.8100488 MECKLENBG 14,965.07 CLV 0.000 1 201 4 S S U C 2 10 67 345+07.15 -L
08/04 U-3115 9.8100488 MECKLENBG 16,624.08 CLV 0.000 1 201 5 S S U C 2 10 67 371+02.99 -L
PROJECT TOTAL = 7,645,900.02 BLYTHE CONSTRUCTION, I
09/01 U-0401 8.2843301 BUNCOMBE 1,831,381.76 RWY STP 2,072 0.884 1 0 0 L U 3 13 84
PROJECT TOTAL = 1,831,381.76 CAROLINA MTN. CONSTRUC
10/01 7.3311208 WAYNE 519,289.30 SUR 110 4.710 2 0 0 S 2 4 33
PROJECT TOTAL = 519,289.30 BARRUS CONSTRUCTION CO
11/01 U-3860 9.8070749 ALAMANCE 532,639.30 RWY 840 0.634 2 0 0 2 7 47
PROJECT TOTAL = 532,639.30 BLYTHE CONSTRUCTION, I
12/01 B-2918 8.2720901 AVERY 213,485.05 RWY BRZ 2,885 0.074 2 0 0 B 4 11 72
12/02 B-2918 8.2720901 AVERY 139,835.50 BRG BRZ M 0.011 1 721 15 B 4 11 72 10+97.50 -L-
PROJECT TOTAL = 353,320.55 THOMPSON-ARTHUR PAVING
13/01 I-4002 8.1851701 BURKE 1,337,590.85 RWY IMS 0.000 4 0 0 S 3 13 85
13/02 I-4003 8.1851801 BURKE 5,260,653.15 RWY IMS 212 24.830 4 0 0 S 3 13 85
PROJECT TOTAL = 6,598,244.00 ASHEVILLE DIVISION, A
***** MAY 1999 TOTAL = $19,000,722.43
***** JUN 1999 *****
07/01 R-3838 8.1051902 DARE 394,737.16 RWY STP 31 12.534 4 0 0 1 1 5
PROJECT TOTAL = 394,737.16 R. P. C. CONTRACTING,
09/01 B-3392 8.1462401 SCOTLAND 951,820.99 RWY BRS 1,796 0.530 1 0 0 L U B 2 8 59
09/02 B-3392 8.1462401 ROBESON 679,663.50 BRG BRS Q 0.038 4 721 15 L U B 1 6 46 26+50.00-L-R
PROJECT TOTAL = 1,631,484.49 BMCO CONSTRUCTION, INC
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 10
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
10/01 B-3031 8.2461801 ROBESON 125,621.25 RWY BRS 974 0.129 1 0 0 B 1 6 46
10/02 B-3031 8.2461801 ROBESON 282,620.63 BRG BRS A 0.031 3 721 15 B 1 6 46 16+79.50 -L
PROJECT TOTAL = 408,241.88 SANFORD CONTRACTORS, I
11/01 I-4018 8.1493801 GUILFORD 1,195,558.25 RWY IMS 131 9.115 4 0 0 2 7 49
PROJECT TOTAL = 1,195,558.25 REYNOLDS FENCE & GUARD
13/01 B-2917 8.2720801 AVERY 332,638.75 RWY BRZ 1,472 0.226 2 0 0 S B 4 11 72
13/02 B-2917 8.2720801 AVERY 525,067.46 BRG BRZ Q 0.040 4 721 15 S B 4 11 72 18+88.75 -L-
PROJECT TOTAL = 857,706.21 MAYMEAD, INC.
14/01 R-3836 6.804832 ASHE 1,255,823.45 RWY 1,457 0.862 2 0 0 L U 4 11 71
PROJECT TOTAL = 1,255,823.45 JAMES R. VANNOY & SONS
15/01 R-4053 6.751010 WATAUGA 213,299.10 SUR 173 1.230 2 0 0 S 4 11 75
15/02 R-4052 6.771007 YADKIN 723,683.79 SUR 100 7.270 2 0 0 S 2 11 77
PROJECT TOTAL = 936,982.89 CARL ROSE & SONS, INC.
16/01 R-0085 8.T791710 CATAWBA 706,935.60 RWY NHS 115 6.150 4 0 0 2 12 79
PROJECT TOTAL = 706,935.60 APEX CONTRACTING, INC.
17/01 B-2574 8.1951201 HENDERSON 871,491.00 RWY BRS 6,225 0.140 2 0 0 L U B 4 14 95
17/02 B-2574 8.1951201 HENDERSON 3,113,949.61 BRG BRS I 0.135 4 681 15 L U B 4 14 95 16+73.75 -L-
PROJECT TOTAL = 3,985,440.61 CAROLINA BRIDGE COMPAN
***** JUN 1999 TOTAL = $11,372,910.54
***** JUL 1999 *****
07/01 R-3838 8.1051903 DARE 707,082.00 RWY STP 56 12.553 4 0 0 1 1 5
PROJECT TOTAL = 707,082.00 APEX CONTRACTING, INC.
08/01 U-2310 8.1321701 NASH 2,941,635.45 RWY STP 2,072 1.420 5 634 1 2 4 32 8+50 TO 83+5
PROJECT TOTAL = 2,941,635.45 BARNHILL CONTRACTING C
09/01 R-1023 6.349003T WILSON 431,503.50 RWY 0.000 2 0 0 2 4 34
PROJECT TOTAL = 431,503.50 S. T. WOOTEN CORPORATI
10/01 R-2204 8.1241802 BLADEN 361,581.15 SUR STP 0.000 0 0 0 L 1 6 42
PROJECT TOTAL = 361,581.15 VAUGHN, INCORPORATED
11/01 B-3035 8.2461201 ROBESON 215,485.00 RWY BRS 1,539 0.140 2 0 0 SLS B 1 6 46
11/02 B-3035 8.2461201 ROBESON 528,816.72 BRG BRS A 0.038 3 845 15 SLS B 1 6 46 17+33.25 -L-
PROJECT TOTAL = 744,301.72 DELLINGER, INC.
12/01 5.4411210 CUMBERLAN 368,452.83 SUR 102 3.620 2 0 0 S 1 6 44 MAPS 1-2
PROJECT TOTAL = 368,452.83 CROWELL CONSTRUCTORS,
13/01 R-3849 8.1530401 HOKE 331,618.10 RWY STP 150 2.210 3 0 0 S B 2 8 53 MAPS 1-15 OD
13/02 R-3849 7.5311039 HOKE 298,432.00 RWY 51 5.890 2 0 0 S B 2 8 53 MAPS 2-14 EV
13/03 R-3849 7.5373139 HOKE 6,097.50 RWY 55 0.110 2 0 0 S B 2 8 53 MAP 16
PROJECT TOTAL = 636,147.60 HIGHWAY CONSTRUCTORS,
14/01 B-2941 8.2791601 CATAWBA 569,711.52 RWY BRZ 2,424 0.235 2 0 0 B 2 12 79
14/02 B-2941 8.2791601 CATAWBA 409,353.01 BRG BRZ Q 0.026 3 845 15 B 2 12 79 17+66.50 -L-
PROJECT TOTAL = 979,064.53 CROWDER CONSTRUCTION C
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 11
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
15/01 I-907B 8.1870210 MCDOWELL 15,141,452.27 RWY IMF 2,703 5.601 4 0 0 LSL 3 13 87
15/02 I-907B 8.1870210 MCDOWELL 27,549.50 CLV IMF 0.000 1 0 0 LSL 3 13 87 298+17.00 -L
15/03 I-907B 8.1870210 MCDOWELL 735,327.36 BRG IMF I 0.039 4 845 11 LSL 3 13 87 301+45.98 -L
15/04 I-907B 8.1870210 MCDOWELL 552,287.24 BRG IMF I 0.000 3 845 11 LSL 3 13 87 301+45.98 -L
15/05 I-907B 8.1870210 MCDOWELL 892,073.17 BRG IMF Q 0.054 5 836 16 LSL 3 13 87 351+96.69 -L
15/06 I-907B 8.1870210 MCDOWELL 921,053.12 BRG IMF Q 0.000 5 836 16 LSL 3 13 87 351+49.81 -L
15/07 I-907B 8.1870210 MCDOWELL 848,856.22 BRG IMF Q 0.055 5 836 15 LSL 3 13 87 380+31.34 -L
15/08 I-907B 8.1870210 MCDOWELL 868,832.52 BRG IMF Q 0.000 5 836 15 LSL 3 13 87 380+65.99 -L
15/09 I-907B 8.1870210 BURKE 857,310.31 BRG IMF I 0.000 2 656 11 LSL 3 13 85 458+69.08 -L
PROJECT TOTAL = 20,844,741.71 TAYLOR & MURPHY CONSTR
16/01 B-3118 8.2843401 BUNCOMBE 481,707.00 RWY BRS 4,723 0.102 2 0 0 C 3 13 84
16/02 B-3118 8.2843401 BUNCOMBE 13,448.50 RWY BRS 0.000 0 0 0 C 3 13 84 ASHEVILLE CO
16/03 B-3118 8.2843401 BUNCOMBE 211,837.00 CLV BRS 0.006 1 2 4 C 3 13 84 19+50.00 -L-
PROJECT TOTAL = 706,992.50 TAYLOR & MURPHY CONSTR
17/01 A-0009 6.939004T GRAHAM 572,978.75 RWY 0.000 1 0 0 4 14 93
PROJECT TOTAL = 572,978.75 ROBBINSVILLE CONTRACTI
18/01 7.9411101 HAYWOOD 433,243.92 SUR 148 2.930 2 0 0 S 4 14 94 MAP 1
PROJECT TOTAL = 433,243.92 ASHEVILLE DIVISION, A
19/01 7.9811100 POLK 651,154.10 SUR 108 6.010 2 0 0 S 3 14 98 MAPS 1-6
PROJECT TOTAL = 651,154.10 THOMPSON CONTRACTORS,
20/01 U-3864 8.1251201 NEW HANOV 1,290,061.00 RWY STP 3,028 0.426 2 0 0 S U 1 3 25
PROJECT TOTAL = 1,290,061.00 BARRUS CONSTRUCTION CO
***** JUL 1999 TOTAL = $31,668,940.76
***** AUG 1999 *****
12/01 B-2859 8.2571301 RANDOLPH 336,122.58 RWY BRZ 1,943 0.173 2 614 0 B 2 8 57
12/02 B-2859 8.2571301 RANDOLPH 322,274.21 BRG BRZ I 0.026 2 854 15 B 2 8 57 17+14.50 -L-
PROJECT TOTAL = 658,396.79 SANFORD CONTRACTORS, I
13/01 B-2816 8.2801301 CLEVELAND 576,864.00 RWY BRZ 1,764 0.327 2 614 0 S S U B 3 12 80
13/02 B-2816 8.2801301 CLEVELAND 1,134.00 RWY BRZ 0.000 0 0 0 S S U B 3 12 80 CLEVELAND CO
13/03 B-2816 8.2801301 CLEVELAND 390,309.77 BRG BRZ 0.029 3 845 15 S S U B 3 12 80 19+32.00 -L-
PROJECT TOTAL = 968,307.77 R. E. BURNS & SONS CO.
14/01 B-2998 8.2870801 MCDOWELL 247,773.25 RWY BRZ 1,466 0.169 2 0 0 C 3 13 87
14/02 B-2998 8.2870801 MCDOWELL 123,068.00 CLV BRZ 0.008 1 3 15 C 3 13 87 14+49.28-L-
PROJECT TOTAL = 370,841.25 MILLER ENGINEERING CO.
15/01 U-4003 8.1404001 WAKE 1,504,180.25 SUR NHS 0.000 6 0 0 S 2 5 40
15/02 I-4040 8.1404401 WAKE 1,333,078.75 SUR IMS 158 8.420 6 0 0 S 2 5 40
PROJECT TOTAL = 2,837,259.00 MANGUM ASPHALT SERVICE
***** AUG 1999 TOTAL = $4,834,804.81
***** SEP 1999 *****
19/01 R-2000 6.408015T WAKE 1,381,029.70 RWY 0.000 1 0 0 2 5 40
PROJECT TOTAL = 1,381,029.70 C. C. MANGUM CONTRACTO
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 12
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
20/01 I-3828 8.1443501 CUMBERLAN 1,464,419.80 SUR IMS 66 22.220 1 0 0 S 1 6 44 MAPS 1-15
PROJECT TOTAL = 1,464,419.80 BOGGS PAVING, INC.
21/01 U-3865 8.1443601 CUMBERLAN 670,290.40 RWY STP 117 5.710 1 0 0 S 1 6 44
PROJECT TOTAL = 670,290.40 BOGGS PAVING, INC.
22/01 U-3866 8.1443701 CUMBERLAN 3,446,512.16 SUR NHS 199 17.340 1 0 0 S 1 6 44 MAPS 1-6
PROJECT TOTAL = 3,446,512.16 CROWELL CONSTRUCTORS,
23/01 R-3857 8.1431601 COLUMBUS 2,459,539.60 SUR N 139 17.700 1 0 0 S 1 6 43
PROJECT TOTAL = 2,459,539.60 BOGGS PAVING, INC.
24/01 R-4032 8.1590201 SCOTLAND 1,298,882.80 RWY NHS 124 10.500 4 0 0 2 8 59
PROJECT TOTAL = 1,298,882.80 ELDERLEE, INC.
25/01 R-2123 8.U671610 MECKLENBG 14,778,029.01 RWY NHF 3,981 3.712 2 0 0 UR C B 2 10 67
25/02 R-2123 8.U671610 MECKLENBG 334,471.50 RWY NHF 0.000 0 0 0 UR C B 2 10 67 CMUD
25/03 R-2123 8.U671610 MECKLENBG 246,739.60 CLV NHF 0.000 1 2 36 UR C B 2 10 67 1635+40.00-L
25/04 R-2123 8.U671610 MECKLENBG 106,233.80 CLV NHF 0.000 1 1 28 UR C B 2 10 67 1705+68.00-L
25/05 R-2123 8.U671610 MECKLENBG 382,418.30 CLV NHF 0.007 1 3 27 UR C B 2 10 67 1756+90.00-L
25/06 R-2123 8.U671610 MECKLENBG 572,559.60 CLV NHF 0.008 1 3 31 UR C B 2 10 67 1798+32.00-L
25/07 R-2123 8.U671610 MECKLENBG 985,216.54 BRG NHF I 0.000 2 660 11 UR C B 2 10 67 1682+88.39-L
25/08 R-2123 8.U671610 MECKLENBG 637,310.75 BRG NHF I 0.000 2 667 11 UR C B 2 10 67 1732+20.38-L
25/09 R-2123 8.U671610 MECKLENBG 2,731,452.47 BRG NHF J 0.000 4 579 21 UR C B 2 10 67 1829+32.47-L
PROJECT TOTAL = 20,774,431.57 REA CONSTRUCTION COMPA
27/01 B-2999 8.2870901 MCDOWELL 250,620.00 RWY BRZ 1,638 0.153 1 0 0 U C 3 13 87
27/02 B-2999 8.2870901 MCDOWELL 124,098.40 CLV BRZ 0.007 1 3 1 U C 3 13 87 16+12.00 -L-
PROJECT TOTAL = 374,718.40 TAYLOR & MURPHY CONSTR
28/01 R-3854 8.1910401 CHEROKEE 4,269,091.61 SUR NHS 91 47.170 1 0 0 S 4 14 91 MAPS 1-3
PROJECT TOTAL = 4,269,091.61 HARRISON CONST. CO., I
29/01 R-3852 8.1944401 HAYWOOD 6,117,692.88 SUR NHS 448 13.660 1 0 0 SL 4 14 94 MAPS 1-16
PROJECT TOTAL = 6,117,692.88 ASHEVILLE DIVISION, A
30/01 R-3856 8.1960801 JACKSON 2,478,187.20 SUR NHS 281 8.820 1 0 0 S 4 14 96 MAPS 1-2
PROJECT TOTAL = 2,478,187.20 HARRISON CONST. CO., I
31/01 R-3853 8.1970601 MACON 4,491,629.27 SUR NHS 213 21.050 1 0 0 S 4 14 97 MAPS 1-22
PROJECT TOTAL = 4,491,629.27 HARRISON CONST. CO., I
32/01 R-3855 8.1980701 POLK 2,114,674.40 SUR NHS 367 5.760 1 0 0 S 3 14 98 MAPS 1-5
PROJECT TOTAL = 2,114,674.40 ASHEVILLE DIVISION, A
***** SEP 1999 TOTAL = $51,341,099.79
***** OCT 1999 *****
12/01 B-2991 8.2311901 JOHNSTON 115,466.50 RWY BRZ 1,269 0.091 2 0 0 S U B 2 4 31
12/02 B-2991 8.2311901 JOHNSTON 216,579.55 BRG BRZ A 0.023 3 718 15 S U B 2 4 31 14+07.00-L-
PROJECT TOTAL = 332,046.05 DELLINGER, INC.
13/01 B-3183 8.2451001 HARNETT 121,258.11 RWY BRS 919 0.132 2 612 0 B 2 6 45
13/02 B-3183 8.2451001 HARNETT 217,320.48 BRG BRS A 0.018 2 718 15 B 2 6 45 14+17.42 -L-
PROJECT TOTAL = 338,578.59 S. T. WOOTEN CORPORATI
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 13
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
14/01 R-2217 6.529006T CHATHAM 2,121,354.69 RWY 3,219 0.659 5 632 0 S U WB 2 8 52
14/02 R-2217 6.529006T CHATHAM 4,033.00 RWY 0.000 0 0 0 S U WB 2 8 52 SILER CITY
14/03 R-2217 6.529006T CHATHAM 1,179,459.37 BRG Q 0.036 3 854 12 S U WB 2 8 52 582+51.71 LR
14/04 R-2217 6.529006T CHATHAM 482,635.98 BRG A 0.000 1 572 11 S U WB 2 8 52 594+12.12 LR
PROJECT TOTAL = 3,787,483.04 ENGLISH CONSTRUCTION C
15/01 R-2219 8.T520808 CHATHAM 6,257,890.23 RWY NHS 1,046 5.982 1 0 0 S 2 8 52
PROJECT TOTAL = 6,257,890.23 MAPCO, INC.
16/01 B-2803 8.2700201 ALLEGHANY 340,290.25 RWY BRZ 2,014 0.169 2 614 0 C B 3 11 70
16/02 B-2803 8.2700201 ALLEGHANY 306,537.58 CLV BRZ 0.006 1 2 20 C B 3 11 70 13+29.00 -L-
16/03 B-2803 8.2700201 ALLEGHANY 251,728.15 BRG BRZ 0.000 3 718 15 C B 3 11 70 13+61.00 -Y-
PROJECT TOTAL = 898,555.98 JAMES R. VANNOY & SONS
17/01 B-3048 8.2741301 SURRY 312,291.50 RWY BRZ 1,312 0.238 2 612 0 B 2 11 74
17/02 B-3048 8.2741301 SURRY 415,003.40 BRG BRZ B 0.027 1 566 15 B 2 11 74 20+30.00-L-
PROJECT TOTAL = 727,294.90 SMITH-ROWE, INC.
18/01 B-2846 8.2870601 MCDOWELL 352,500.82 RWY MA 1,439 0.245 2 612 0 S C B 3 13 87
18/02 B-2846 8.2870601 MCDOWELL 100,820.00 CLV MA 0.004 1 2 3 S C B 3 13 87 13+23.00-L-
18/03 B-2846 8.2870601 MCDOWELL 315,925.25 BRG MA A 0.035 4 721 15 S C B 3 13 87 19+80.00-L-
PROJECT TOTAL = 769,246.07 DANE CONSTRUCTION, INC
***** OCT 1999 TOTAL = $13,111,094.86
***** NOV 1999 *****
06/01 R-3838 8.1051904 DARE 3,069,235.00 RWY STP 230 13.317 2 0 0 S 1 1 5
PROJECT TOTAL = 3,069,235.00 BARNHILL CONTRACTING C
07/01 R-3839 8.1080801 HYDE 2,737,293.70 RWY STP 231 11.872 2 614 0 1 1 8
PROJECT TOTAL = 2,737,293.70 BARNHILL CONTRACTING C
08/01 I-4028 8.1675301 MECKLENBG 1,207,898.75 RWY IMS 34 35.510 1 0 0 2 10 67
PROJECT TOTAL = 1,207,898.75 REYNOLDS FENCE & GUARD
09/01 B-2130 8.1241701 DUPLIN 327,310.00 RWY BRS 1,387 0.236 1 0 0 C B 1 3 24
09/02 B-2130 8.1241701 DUPLIN 176,646.82 CLV BRS 0.005 1 2 6 C B 1 3 24 15+67.00-L-
09/03 B-2130 8.1241701 DUPLIN 322,238.50 BRG BRS A 0.024 3 718 15 C B 1 3 24 21+46.00-L-
PROJECT TOTAL = 826,195.32 SANFORD CONTRACTORS, I
10/01 B-3671 8.2312201 JOHNSTON 359,986.15 RWY BRZ 1,304 0.276 2 0 0 S U B 2 4 31
10/02 B-3671 8.2312201 JOHNSTON 337,682.20 BRG BRZ Q 0.028 3 721 15 S U B 2 4 31 21+48.00 -L-
PROJECT TOTAL = 697,668.35 DELLINGER, INC.
11/01 B-3028 8.1462601 ROBESON 260,197.78 RWY BRS 1,122 0.232 2 0 0 U B 1 6 46
11/02 B-3028 8.1462601 ROBESON 334,210.61 BRG BRS A 0.033 4 721 15 U B 1 6 46 17+86.50 -L-
PROJECT TOTAL = 594,408.39 S. T. WOOTEN CORPORATI
12/01 B-2809 8.2480801 CASWELL 432,347.00 RWY BRZ 1,347 0.321 2 614 0 L U B 2 7 48
12/02 B-2809 8.2480801 CASWELL 947,247.05 BRG BRZ Q 0.087 8 836 15 L U B 2 7 48 20+11.000 -L
PROJECT TOTAL = 1,379,594.05 BURLEIGH CONST. CO., I
13/01 B-1083 8.2660701 CABARRUS 227,035.88 RWY BRZ 1,707 0.133 2 0 0 B 2 10 66
13/02 B-1083 8.2660701 CABARRUS 473,936.74 BRG BRZ Q 0.028 3 836 15 B 2 10 66 14+15.0-LREV
PROJECT TOTAL = 700,972.62 DANE CONSTRUCTION, INC
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 14
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
***** NOV 1999 TOTAL = $11,213,266.18
***** DEC 1999 *****
06/01 B-1204 8.1180601 GREENE 556,224.77 RWY BRS 1,291 0.431 2 0 0 B 1 2 18
06/02 B-1204 8.1180601 GREENE 757,962.31 BRG BRS 0.043 3 854 15 B 1 2 18 24+90.00 -L
PROJECT TOTAL = 1,314,187.08 DELLINGER, INC.
07/01 U-2916 8.2200201 LENOIR 2,590,214.06 MSC S 0.000 1 0 0 1 2 20
PROJECT TOTAL = 2,590,214.06 M. E. HUNTER & ASSOCIA
08/01 5.2411138 DUPLIN 127,076.25 SUR 121 1.050 2 0 0 S 1 3 24 MAP 1
08/02 7.2411132 DUPLIN 462,657.10 SUR 53 8.800 2 0 0 S 1 3 24 MAP 2
08/03 7.2421132 DUPLIN 802,394.54 SUR 42 19.250 2 0 0 S 1 3 24 MAPS 3-13
08/04 7.2472732 DUPLIN 23,342.45 SUR 29 0.800 2 0 0 S 1 3 24 MAPS 14-15
08/05 7.2474332 DUPLIN 132,259.35 SUR 46 2.900 2 0 0 S 1 3 24 MAPS 16-17
08/06 7.2811132 SAMPSON 1,016,581.60 SUR 107 9.500 2 0 0 S 1 3 28 MAP 18
08/07 7.2821132 SAMPSON 848,697.55 SUR 37 22.810 2 0 0 S 1 3 28 MAPS 19-30
PROJECT TOTAL = 3,413,008.84 BARNHILL CONTRACTING C
09/01 7.2311130 BRUNSWICK 907,582.95 SUR 127 7.150 2 0 0 S 1 3 23 MAP 1-2
09/02 7.2321130 BRUNSWICK 683,272.35 SUR 39 17.550 2 0 0 S 1 3 23 MAP 3-13
09/03 7.2372430 BRUNSWICK 22,030.15 SUR 110 0.200 2 0 0 S 1 3 23 MAP 14
09/04 7.2373630 BRUNSWICK 174,938.75 SUR 113 1.550 2 0 0 S 1 3 23 MAP 15
09/05 7.2373830 BRUNSWICK 30,716.75 SUR 205 0.150 2 0 0 S 1 3 23 MAP 16
09/06 7.2521130 NEW HANOV 515,916.80 SUR 53 9.750 2 0 0 S 1 3 25 MAP 17-35
09/07 7.2573230 NEW HANOV 686,819.95 SUR 205 3.350 2 0 0 S 1 3 25 MAP 36-44
PROJECT TOTAL = 3,021,277.70 BOGGS PAVING, INC.
10/01 7.2621131 ONSLOW 414,700.58 SUR 83 5.000 2 0 0 S 1 3 26 MAP 1-2
10/02 7.2671431 ONSLOW 45,122.00 SUR 31 1.470 2 0 0 S 1 3 26 MAP 3-8
10/03 7.2721131 PENDER 545,357.95 SUR 53 10.280 2 0 0 S 1 3 27 MAP 9-14
10/04 7.2770631 PENDER 13,635.10 SUR 85 0.160 2 0 0 S 1 3 27 AMP 15
10/05 9.8031309 ONSLOW 22,937.70 SUR 67 0.340 2 0 0 S 1 3 26 MAP 16
10/06 9.8034704 PENDER 89,838.80 SUR 78 1.150 2 0 0 S 1 3 27 AMP 17
PROJECT TOTAL = 1,131,592.13 WILMINGTON DIVISION, A
11/01 B-3068 8.1331201 WAYNE 627,039.33 RWY BRS 1,497 0.419 2 612 0 C 2 4 33
11/02 B-3068 8.1331201 WAYNE 227,307.26 CLV BRS 0.007 1 4 10 C 2 4 33 22+25.00 -L-
PROJECT TOTAL = 854,346.59 GREENVILLE PAVING & C
12/01 B-3181 8.2300801 HALIFAX 172,282.00 RWY MAB 2,328 0.074 2 612 0 B 2 4 30
12/02 B-3181 8.2300801 HALIFAX 230,420.69 BRG MAB I 0.021 3 718 15 B 2 4 30 14+56.14 -L-
PROJECT TOTAL = 402,702.69 SANFORD CONTRACTORS, I
13/01 B-2978 8.2493701 GUILFORD 884,068.70 RWY 2,754 0.321 2 614 0 U B 2 7 49
13/02 B-2978 8.2493701 GUILFORD 81,893.35 RWY 0.000 0 0 0 U B 2 7 49 HIGH POINT
13/03 B-2978 8.2493701 GUILFORD 483,379.65 BRG 0.031 2 854 11 U B 2 7 49 18+22.08-L-
PROJECT TOTAL = 1,449,341.70 HAYMES BROTHERS, INC.
14/01 7.5111228 ROCKINGHA 394,698.77 SUR 43 9.280 2 0 0 S 2 7 51
14/02 7.5121228 ROCKINGHA 546,886.09 SUR 31 17.580 2 0 0 S 2 7 51
14/03 7.5171428 ROCKINGHA 183,975.84 SUR 114 1.610 2 0 0 S 2 7 51
14/04 7.5171528 ROCKINGHA 52,673.36 SUR 110 0.480 2 0 0 S 2 7 51
14/05 7.5172228 ROCKINGHA 296,278.61 SUR 98 3.030 2 0 0 S 2 7 51
PROJECT TOTAL = 1,474,512.67 THOMPSON-ARTHUR PAVING
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 15
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
15/01 B-2561 8.2623401 FORSYTH 411,465.03 RWY BRS 2,200 0.187 2 614 0 L U C 2 9 62
15/02 B-2561 8.2623401 FORSYTH 149,845.10 CLV BRS 0.005 1 2 4 L U C 2 9 62 15+39.00-L-
PROJECT TOTAL = 561,310.13 SMITH-ROWE, INC.
16/01 B-2509 8.1720901 AVERY 543,190.87 RWY BRS 7,441 0.073 2 0 0 WB 4 11 72
16/02 B-2509 8.1720901 AVERY 1,256,329.27 BRG BRS 0.031 3 336 15 WB 4 11 72 23+68.15 -L-
PROJECT TOTAL = 1,799,520.14 TAYLOR & MURPHY CONSTR
17/01 B-2916 8.2720701 AVERY 158,543.00 RWY BRZ 1,300 0.122 2 0 0 B 4 11 72
17/02 B-2916 8.2720701 AVERY 281,635.09 BRG BRZ Q 0.024 3 721 15 B 4 11 72 16+51.25-L
PROJECT TOTAL = 440,178.09 BURNSVILLE STEEL ERECT
18/01 7.8011282 CLEVELAND 470,442.58 SUR 54 8.690 2 0 0 S 3 12 80 MAPS 1-3
18/02 7.8021282 CLEVELAND 949,744.59 SUR 40 24.010 2 0 0 S 3 12 80 MAPS 4-18
18/03 7.8072982 CLEVELAND 123,549.76 SUR 50 2.490 2 0 0 S 3 12 80 MAPS 19-21
18/04 7.8073982 CLEVELAND 54,412.96 SUR 45 1.210 2 0 0 S 3 12 80 MAPS 22-23
18/05 7.8079782 CLEVELAND 46,406.76 SUR 37 1.240 2 0 0 S 3 12 80 MAPS 24-25
PROJECT TOTAL = 1,644,556.65 JOHN E. JENKINS, INC.
19/01 B-2604 8.2980301 POLK 267,684.60 RWY BRZ 2,075 0.129 1 612 0 B 3 14 98
19/02 B-2604 8.2980301 POLK 491,592.90 BRG BRZ Q 0.032 3 845 15 B 3 14 98 16+00.00-L-
PROJECT TOTAL = 759,277.50 R. E. BURNS & SONS CO.
***** DEC 1999 TOTAL = $20,856,025.97
GRAND TOTAL =$299,071,382.29
COST/PROJECT MILE = $144,107.24 TOTAL PROJECT MILES = 2075.339
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 16
AVERAGE UNIT BIDS
DATE 9901-9912
COMPLETE FILE FOR THIS PERIOD
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
1 MOBILIZATION LS 163 66,041.68 10,764,794.11
2 CONSTRUCTION SURVEYING LS 15 65,523.20 982,848.01
5 CLEARING & GRUBBING LS 221.21 13,390.00 2,962,001.77
6 SUPP CLEARING & GRUBBING ACR 39 2,283.87 89,071.00
10 SEALING ABANDONED WELLS EA 10 597.40 5,974.05
13 UNCLASSIFIED EXCAVATION CY 2,157,860 2.27 4,902,420.70
26 REINF BRG APR FILL ****** LS 36 14,102.11 507,676.00
19 UNDERCUT EXCAVATION CY 146,390 4.99 730,616.75
11 GRADING LS 33 62,008.48 2,046,280.00
8 SUPP CLEARING & GRUBBING ACR 32 670.69 21,462.00
9 UNDERCUT EXCAVATION CY 11,010 11.85 130,492.50
16 GRADING LS 1 145,000.00 145,000.00
21 SELECT GRANULAR MATERIAL CY 42,490 10.87 462,112.00
22 SOIL STABILIZATION FABRIC SY 66,680 1.96 130,669.50
28 BORROW EXCAVATION CY 725,984 5.24 3,805,707.15
31 BENCHING EXCAV FOR EMBKMT CY 3,500 5.00 17,500.00
34 DRAINAGE DITCH EXCAVATION CY 46,979 8.42 395,579.25
39 BERM DITCH CONSTRUCTION LF 15,225 2.07 31,498.50
38 PIPE CLEAN-OUT LF 1,309 13.98 18,302.00
47 REMOVAL OF ASPHALT PVMT SY 173,577 3.04 528,469.00
49 REMOVAL OF CONC PVMT SY 94,900 9.00 854,449.00
52 REMOVAL OF CONC PVMT SLBS SY 6,240 25.00 156,000.00
50 PROOF ROLLING HR 73 136.53 9,967.00
51 TEMPORARY SHORING SF 4,410 10.16 44,793.00
56 ROCK EMBANKMENT TON 945 75.00 70,875.00
62 SELECT MATERIAL CL I TON 100 20.00 2,000.00
64 SELECT MATERIAL CL III TON 5,700 9.90 56,430.00
59 FNDATION MATL, MINOR STRS TON 10,283 18.48 189,991.45
76 15" PLAIN CONC PIPE CULV LF 464 18.25 8,470.40
77 18" PLAIN CONC PIPE CULV LF 132 17.08 2,254.56
78 24" PLAIN CONC PIPE CULV LF 24 30.00 720.00
85 15" PARLL PIPE RC END SEC EA 7 428.57 3,000.00
87 24" PARLL PIPE RC END SEC EA 1 350.00 350.00
103 15"PARLL PIPE PF STL END EA 46 273.26 12,570.00
104 18"PARLL PIPE PF STL END EA 17 255.00 4,335.00
105 24"PARLL PIPE PF STL END EA 6 350.00 2,100.00
88 12" RC PIPE CULV III LF 688 20.87 14,360.00
89 15" RC PIPE CULV III LF 33,636 21.26 715,244.00
90 18" RC PIPE CULV III LF 16,676 23.94 399,264.72
91 24" RC PIPE CULV III LF 13,724 26.97 370,155.08
92 30" RC PIPE CULV III LF 3,888 35.51 138,055.96
93 36" RC PIPE CULV III LF 4,400 49.68 218,609.96
94 42" RC PIPE CULV III LF 2,776 55.23 153,314.80
95 48" RC PIPE CULV III LF 1,188 81.18 96,440.00
96 54" RC PIPE CULV III LF 720 103.69 74,660.96
97 60" RC PIPE CULV III LF 28 157.00 4,396.00
121 60" RC PIPE CULV IV LF 336 119.00 39,984.00
139 18" RC PIPE CULV V (RR) LF 20 45.00 900.00
153 15" RC FES EA 5 500.00 2,500.00
154 18" RC FES EA 2 450.00 900.00
167 18" X PIPE RC END SECTION EA 11 490.00 5,390.00
168 24" X PIPE RC END SECTION EA 5 665.00 3,325.00
169 30" X PIPE RC END SECTION EA 4 1,000.00 4,000.00
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 17
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
196 15X**X**" RCP TEE III EA 2 430.00 860.00
197 15X15X15" RCP TEE III EA 4 435.00 1,740.00
200 24X**X**" RCP TEE III EA 1 525.00 525.00
217 **" RC PIPE ELBOW III EA 1 300.00 300.00
218 15" RC PIPE ELBOW III EA 2 315.00 630.00
234 6" CS PIPE 0.064" SPR BOX LF 20 12.00 240.00
239 **" CS PIPE CULV *****" LF 1,288 22.83 29,412.00
240 15" CS PIPE CULV 0.064" LF 3,232 18.28 59,069.36
241 18" CS PIPE CULV 0.064" LF 1,066 18.53 19,755.00
242 24" CS PIPE CULV 0.064" LF 342 23.70 8,105.60
278 1**X**"CSP ARCH CULV***** LF 156 125.00 19,500.00
279 **" BCCSP A *****" LF 180 24.40 4,392.00
297 **" BCCSP B *****" LF 1,824 18.92 34,503.60
303 15" BCCSP B 0.064" LF 3,584 20.73 74,314.40
307 18" BCCSP B 0.064" LF 1,934 25.52 49,364.80
311 24" BCCSP B 0.064" LF 1,172 26.86 31,486.00
313 24" BCCSP B 0.109" LF 48 34.30 1,646.40
316 30" BCCSP B 0.079" LF 436 35.84 15,627.80
321 36" BCCSP B 0.079" LF 240 47.43 11,384.00
324 36" BCCSP B 0.109" LF 68 50.00 3,400.00
334 42" BCCSP B 0.109" LF 116 40.00 4,640.00
347 48" BCCSP B 0.109" LF 20 70.00 1,400.00
399 72" BCCSP B 0.168" LF 40 150.00 6,000.00
404 78" BCCSP B 0.109" 3X1" LF 152 120.30 18,285.60
440 **" BCCS ELB B *****" EA 85 179.35 15,245.00
441 15" BCCS ELB B 0.064" EA 96 188.24 18,071.00
442 18" BCCS ELB B 0.064" EA 23 223.91 5,150.00
443 24" BCCS ELB B 0.064" EA 14 178.57 2,500.00
445 30" BCCS ELB B 0.079" EA 4 360.00 1,440.00
466 60" BCCSP D 0.109" 3X1" LF 110 113.00 12,430.00
1047 4" SLOPE PROTECTION SY 1,760 42.00 73,920.00
1048 6" SLOPE PROTECTION SY 775 72.74 56,375.00
552 FINE GRADING LS 27 54,509.09 1,471,745.37
553 SEALING PVMT CRACKS LB 84,000 2.24 187,925.00
555 SEALING PVMT CRACKS & JTS LB 100 37.50 3,750.00
545 LIME TRTD SOIL (SLURRY) SY 368,780 1.61 593,647.80
546 LIME TRTD SOIL(QUICKLIME) SY 9,000 3.57 32,100.00
548 LIME FOR LIME TREATD SOIL TON 3,766 119.01 448,178.10
549 #57 STONE TON 266 35.75 9,510.00
551 RUBBLIZING CONC PAVEMENT SY 105,500 2.50 263,750.00
554 STABILIZER AGGREGATE TON 8,075 15.82 127,718.50
556 AGGREGATE BASE COURSE TON 406,267 10.75 4,368,162.45
574 **" SOIL CEMENT BASE SY 197,365 1.67 330,474.55
575 PC FOR SOIL CEMENT BASE TON 5,441 109.61 596,366.48
570 AGGREGATE FOR SOIL CEM BS TON 1,005 14.70 14,778.00
576 ASPHALT CURING SEAL GAL 73,500 1.42 104,790.00
580 INCIDENTAL STONE BASE TON 46,669 18.57 866,642.91
583 SHOULDER BORROW CY 49,041 0.40 19,571.00
558 DITCHING LF 6,600 2.60 17,160.00
585 SHOULDER CONSTRUCTION MLF 1,919.05 566.39 1,086,931.68
568 SHOULDER RECONSTRUCTION MI 436.39 2,423.85 1,057,746.07
589 PRIME COAT GAL 9,195 1.67 15,352.00
586 MILLING BIT PAVEMENT ** SY 1,520,360 1.48 2,253,515.02
584 MILLN BIT PVMT ** - ** SY 585,188 1.80 1,055,337.98
577 MILL ASPH PVMT **-1/4" SY 18,572 1.45 26,940.85
581 MILL ASPH PVMT **-1/2" SY 1,423,698 0.82 1,172,469.74
579 MILL ASPH PVMT ** -**-1/2 SY 42,739 2.13 91,073.90
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 18
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
571 MILL ASPH PVMT**.5 -**.5 SY 23,300 2.00 46,600.00
590 MILLED RUMBLE STRIPS LF 510,900 0.18 94,168.00
594 INCIDENTAL MILLING SY 46,730 3.51 164,061.75
593 ASPHALT CEMENT TON 160,301.50 138.20 22,153,880.95
569 WEDGING EXISTING PAVEMENT TON 2,820 35.16 99,145.00
597 ASPH CONC BASE CO, HB TON 321,482 28.24 9,077,984.20
598 SAND ASPH SURF CO,LEVELNG TON 2,920 22.70 66,284.00
600 SAND ASPH SURF CO, F1 TON 642 24.04 15,433.68
601 ASPH CONC BINDER CO, HDB TON 262,355 28.08 7,367,236.65
602 ASPH CONC BINDER CO, H TON 187,123 27.25 5,099,121.71
603 ASPH CONC SURF I-1, LEVLN TON 11,102 25.25 280,294.10
604 ASPH CONC SURFACE CO, I-1 TON 641,656 23.78 15,257,814.88
606 ASPH CONC SURF I-2, LEVLN TON 26,016 36.22 942,331.60
605 ASPH CONC SURFACE CO, I-2 TON 672,451 25.26 16,989,142.01
608 ASPH CONC SURF CO, HDS TON 677,098 25.44 17,224,706.65
611 ASPH PM PAVEMENT REPAIR TON 4,384 84.76 371,593.11
612 PATCHING EXIST PAVEMENT TON 30,724 90.46 2,779,333.10
619 AST, MAT COAT, #6 STONE SY 354,511 0.88 312,586.85
622 AST, SPLIT SEAL SY 20,700 1.25 25,875.00
631 AST, TRIPLE SEAL SY 982,779 1.03 1,011,635.04
682 SURF TEST CONC PAVEMENT LS 1 5,641.03 5,641.03
683 LAB RENTAL PORT CEMENT LS 1 5,641.03 5,641.03
685 RIGHT OF WAY MARKERS EA 668 103.97 69,452.83
687 PIPE REMOVAL LF 22,745 6.74 153,429.54
690 SUBDRAIN EXCAVATION CY 6,733 6.77 45,572.19
691 SUBDRAIN FINE AGGREGATE CY 4,816 30.72 147,936.96
692 4" PERF SUBDRN PIPE LF 40 9.10 364.00
693 4" SUBDRN Y,T,OR L EA 4 55.00 220.00
694 6" PERF SUBDRN PIPE LF 27,100 5.10 138,355.00
695 6" SUBDRN Y,T,OR L EA 813 17.33 14,091.30
698 CONC PAD SUBDRN OUTLET EA 58 234.74 13,614.95
699 4" OUTLET PIPE (SUBDRNS) LF 20 22.00 440.00
707 6" OUTLET PIPE (SUBDRNS) LF 348 8.37 2,913.72
702 SHOULDER DRAIN LF 96,450 2.51 242,420.00
703 4" SHOULDER DRAIN PIPE LF 100,650 0.99 99,545.50
706 4" OUTLET PIPE (SH DRNS) LF 7,835 4.52 35,444.00
704 CONC PAD SHLDR DRN OUTLET EA 228 193.74 44,173.15
705 BLOTTING SAND TON 1,044 1.40 1,458.84
708 METAL FUNNELS EA 61 526.47 32,114.70
710 12"FUNNEL DRAIN PIPE LF 3,369 14.42 48,567.52
713 12"FUNNEL DRAIN ELBOWS EA 122 135.83 16,571.96
715 SAND CEMENT HEADWALLS SF 810 37.50 30,375.00
716 CONC ENDWALLS CL A CY 11 534.54 5,880.00
717 CONC ENDWALLS CL B CY 82.20 755.96 62,139.70
719 BRICK MASONRY ENDWALLS CY 25.20 538.89 13,580.00
721 REINF BRICK MASRY ENDWALL CY 17 590.00 10,030.00
722 REINF STEEL, ENDWALLS LB 1,863 1.79 3,337.45
724 PIPE COLLARS CY 52.20 718.34 37,497.61
726 PIPE PLUGS CY 19.82 1,016.01 20,141.40
731 FLOWABLE FILL CY 78.50 121.91 9,570.00
732 MASNRY DRAINAGE STRUCT EA 856 1,067.45 913,738.31
733 MASNRY DRAINAGE STRUCT CY 7.50 530.00 3,975.00
734 MASNRY DRAINAGE STRUCT LF 130.30 261.82 34,115.38
744 FRAME W/GRATE 840.***** EA 7 300.00 2,100.00
748 FRAME-GRT-HD 840.03 ** EA 258 350.44 90,414.00
752 FRAME W/GRATE 840.13 EA 6 306.00 1,836.00
754 FRAME W/2GRTS 840.16 EA 123 334.50 41,143.20
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 19
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
757 FRAME W/2GRTS 840.20 EA 82 284.15 23,300.00
758 FRAME W/2GRTS 840.22 EA 135 291.49 39,350.93
762 FRAME W/2GRTS 840.24 EA 144 280.84 40,440.90
763 FRAME W/GRATE 840.29 EA 3 300.00 900.00
765 FRAME W/2GRTS 840.29 EA 51 372.52 18,998.80
764 FRAME W/COVER 840.54 EA 30 255.33 7,660.00
768 FRM W/GRATES, DRIVEWY DI EA 2 3,550.00 7,100.00
736 CONC APRON FOR DROP INLET EA 4 500.00 2,000.00
771 **" SLUICE GATE EA 2 2,500.00 5,000.00
772 CONCRETE RETAINING WALLS CY 15 527.75 7,916.25
778 CONCRETE STEPS CY 5 450.00 2,250.00
785 **"X**" CONCRETE CURB LF 2,510 22.81 57,258.50
788 1'-6"CONC CURB & GUTTER LF 79,153 11.50 910,412.50
789 2'-6"CONC CURB & GUTTER LF 52,486 12.24 642,647.80
790 SHOULDER BERM GUTTER LF 30,752.50 12.36 380,217.33
797 MODIFIED CONCRETE FLUME EA 11 1,650.00 18,150.00
796 CONC EXPRESSWAY GUTTER LF 1,015 16.92 17,175.00
798 4" CONCRETE VALLEY GUTTER SY 46 64.50 2,967.00
800 4" CONCRETE SIDEWALK SY 560 34.82 19,500.00
802 CONCRETE WHEELCHAIR RAMP SY 1,797.64 40.71 73,183.04
803 WHEELCHAIR RAMP EA 160 1,271.43 203,429.31
804 6" CONCRETE DRIVEWAY SY 4,531 37.87 171,594.90
806 4" CONCRETE PAVED DITCH SY 407 36.26 14,760.00
818 5" MONO CONC ISLANDS SY 2,686 35.87 96,351.00
820 6" MONO CONC ISLANDS SY 2,978 39.74 118,352.00
842 PC REINF BARRIER SNGL FC LF 2,681 70.91 190,112.20
841 SNGL FC PRECAST CONC BAR LF 50 200.00 10,000.00
844 ADJ CATCH BASINS EA 2 457.73 915.46
847 ADJ DROP INLETS EA 136 569.76 77,488.00
850 ADJ MANHOLES EA 1,354 291.00 394,016.93
853 ADJ METER OR VALVE BOXES EA 1,270 237.33 301,407.42
856 CONVERT CB TO JB EA 6 833.33 5,000.00
859 CONVERT CB TO DI EA 84 1,253.43 105,288.00
862 CONVERT DI TO JB EA 5 1,600.00 8,000.00
877 IMPACT ATTEN TYPE 350 EA 20 5,753.00 115,060.00
899 STL BM GUARDRAIL LF 1,658,353.50 8.69 14,412,783.11
902 SBGR SHOP CURVED LF 2,031.50 12.93 26,276.75
905 SBGR DOUBLE FACED LF 212,975 12.24 2,606,416.88
890 SBGR TERM SECT EA 24 60.07 1,441.60
910 20"TUBULAR 3C GUARDRAIL LF 1,359 65.73 89,335.00
911 W-TR SBGR TRANS SECTIONS EA 28 314.28 8,800.00
959 ADDIT GUARDRAIL POSTS EA 973 37.71 36,696.40
917 GR ANCHOR TYPE ********** EA 1,270 1,810.80 2,299,712.18
920 GR ANCHOR TYPE ********** EA 103 1,315.86 135,534.00
935 GR ANCHOR TYPE AT-1 EA 19 419.58 7,972.00
947 GR ANCHOR TYPE CAT-1 EA 651 508.39 330,960.47
924 GR ANCHOR TYPE VI (MOD) EA 4 1,345.00 5,380.00
934 GR ANCHOR TYPE XI EA 162 1,110.80 179,950.00
936 GR ANCHOR TYPE XI (MOD) EA 48 1,183.60 56,813.00
931 GR ANCHOR TYPE XIII EA 54 374.30 20,212.00
875 REMOVE & RESET GUARDRAIL LF 24,860 5.88 146,082.75
878 REMOVE EXISTING GUARDRAIL LF 172,127 1.18 203,132.43
881 REMVE & STKPILE GUARDRAIL LF 20 2.50 50.00
969 WOVEN WIRE FENCE 47" FAB LF 88,900 1.93 171,580.00
975 4" TIMBER POSTS 7'-6"LONG EA 5,686 14.23 80,929.40
981 5" TIMBER POSTS 8'-0"LONG EA 1,363 30.53 41,610.00
990 CL FEN **" FAB VINYL CTD LF 100 35.00 3,500.00
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 20
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
999 CL FEN **" FAB W/TOP TEN LF 640 9.00 5,760.00
1002 CL FEN 48" FAB W/TOP TEN LF 970 7.34 7,119.00
1005 MET LINE PST **" CL FEN EA 53 35.00 1,855.00
1008 MET LINE PST 48" CL FEN EA 78 28.71 2,239.50
1011 MET TERM PST **" CL FEN EA 8 110.00 880.00
1014 MET TERM PST 48" CL FEN EA 12 119.17 1,430.00
1017 MET GATE PST **" CL FEN S EA 4 105.00 420.00
1021 ADDITIONAL BARBED WIRE LF 1,280 0.72 922.00
1026 ** STRAND BW FENCE W/POST LF 1,115 3.93 4,386.00
1029 TEMP **" WW FENCE W/POSTS LF 1,930 4.18 8,070.00
1032 WOVEN WIRE FENCE RESET LF 910 4.00 3,640.00
1034 BARBED WIRE FENCE RESET LF 3,180 3.50 11,130.00
1036 CHAIN LINK FENCE RESET LF 825 9.39 7,750.00
1043 PLAIN RIP RAP, CLASS I SY 70 25.00 1,750.00
1045 PLAIN RIP RAP, CLASS I TON 7,156 29.44 210,658.30
1046 PLAIN RIP RAP, CLASS II TON 1,570 30.69 48,188.00
1060 PLAIN RIP RAP, CLASS A TON 391 30.91 12,086.50
1061 PLAIN RIP RAP, CLASS B TON 13,522 26.32 355,968.61
33 FILTER FABRIC FOR DRAINGE SY 54,645 2.55 139,144.30
1106 DEMOLIT OF BLDG'S ITEM ** LS 1 25,000.00 25,000.00
1107 BLDG REMOVAL ITEM ** LS 41 872.73 35,782.00
1669 TYPE A SIGNS, FABRICATION SF 3,359.75 19.54 65,668.10
1670 TYPE B SIGNS, FABRICATION SF 924.50 19.54 18,067.27
1671 TYPE D SIGNS, FABRICATION SF 2,879.75 12.49 35,965.45
1672 TYPE E SIGNS, FABRICATION SF 1,071.50 11.43 12,247.81
1673 TYPE F SIGNS, FABRICATION SF 544.26 11.38 6,192.64
1675 MILEMARKERS, FABRICATION SF 72 20.69 1,489.68
1681 REINF CL A CONC FOOTINGS CY 49 556.55 27,271.00
1682 PLN CL A CONC FOOTINGS CY 12 633.00 7,596.00
1677 BREAKAWAY STL BM SUPPORT LB 43,640 2.10 91,778.54
1678 SIMPLE STL BM SUPPORTS LB 9,662 1.51 14,571.22
1679 3# STEEL U-CHANNEL POSTS LF 16,642 6.75 112,384.09
1680 2# STEEL U-CHANNEL POSTS EA 35 29.94 1,047.76
1663 TYPE A SIGNS, ERECTION EA 45 397.90 17,905.50
1664 TYPE B SIGNS, ERECTION EA 58 229.18 13,292.50
1666 TYPE D SIGNS, ERECTION EA 60 105.50 6,329.96
1667 TYPE E SIGNS, ERECTION EA 552 75.39 41,616.40
1668 TYPE F SIGNS, ERECTION EA 112 105.21 11,783.22
1674 MILEMARKERS, ERECTION EA 33 29.54 974.88
1707 OVERHEAD SIGN ASSEMBLY ** LS 20 33,091.50 661,830.00
1714 LITE SYS OVERHD SIGN ** LS 23 5,673.91 130,500.00
1732 R&D SIGNS ON 1 SUPPORT EA 4 25.75 103.00
1735 R&D SIGNS ON 2 SUPPORTS EA 41 118.77 4,869.50
1738 R&D SUPPORTS EA 93 63.01 5,859.60
1740 REMV & DISPL OF FOOTINGS EA 73 87.66 6,399.00
1747 R&D SIGNS MTD ON U POSTS EA 1 6.18 6.18
1753 R&D U CHNNEL POSTS EA 23 16.66 383.18
1756 R&D MILEMARKERS & POSTS EA 8 6.18 49.44
1757 R&D OVERHD SIGN ASSEMBLY EA 4 750.00 3,000.00
1727 R&D OF OVRHD SIGNS EA 6 200.00 1,200.00
1739 R&D LITE SYS FOR OVRHD SN EA 2 400.00 800.00
1763 ATT OVRHD SIGN/OVERHD STR EA 11 400.00 4,400.00
1764 R&D SIGN & U POST EA 352 28.89 10,170.63
1726 ERECT SIGNS ON NEW SUPP EA 1 206.00 206.00
1728 ERECT SIGNS ON NEW U-CHNL EA 32 120.56 3,858.06
2037 WORK ZONE SIGNS (FIXED) SF 34,838.37 8.39 292,450.46
2153 WORK ZONE SIGNS (PORTABLE SF 23,049 7.89 181,897.07
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 21
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
2047 WORK ZONE SIGNS (BARRICDE SF 4,571.50 8.53 39,018.60
2155 FLASHING ARROW PNL TYPE C EA 102 1,937.10 197,584.24
2146 CHANGEABLE MESSAGE SIGNS EA 86 6,889.01 592,455.20
2152 DRUMS EA 16,176 50.48 816,565.23
2161 WARNING FLAGS EA 235 49.98 11,745.88
2159 CONES EA 3,235 19.74 63,867.50
2160 BARRICADES (TYPE II) LF 282 15.32 4,320.00
2040 BARRICADES (TYPE III) LF 7,640 12.78 97,682.89
2163 FLAGGER HR 12,752 15.41 196,538.88
2164 FLAGGER MD 4,230 146.42 619,354.50
2154 WARNING LIGHTS (TYPE B) EA 156 130.10 20,295.60
2133 TEMPORARY CRASH CUSHIONS EA 16 7,106.25 113,700.00
2135 RESET TEMP CRASH CUSHION EA 8 2,062.50 16,500.00
2137 TRUCK MTD IMP ATTN 45 MPH EA 27 4,934.63 133,235.00
2145 TRUCK MTD IMP ATTN 60 MPH EA 92 6,151.58 565,945.42
2058 PORT CONC BARRIER LF 42,833 13.11 561,715.00
2069 PORT CONC BARRIER(ANCHRD) LF 2,540 27.93 70,950.00
2061 RESET PORT CONC BARRIER LF 63,483 2.78 176,312.50
2166 POLICE HR 195 33.85 6,600.00
2178 BACKFILL MATERIAL LF 20,000 3.70 74,000.00
2180 TEMP GLARE SCREEN LF 2,050 15.00 30,750.00
2088 REM TAPE PVMT MRKINGS 4" LF 8,900 1.23 10,950.00
2094 REM TAPE PVMT MRKINGS 8" LF 11,300 2.13 24,113.00
2025 TEMP RAISED PVT MARKERS EA 9,368 5.39 50,458.61
1710 GRDRAIL DELIN TEMP CRYST EA 308 6.68 2,056.36
2063 GRDRAIL DELIN TEMP YELLOW EA 30 6.18 185.40
1711 BARRIER DELIN TEMP CRYST EA 161 7.78 1,253.20
1712 BARRIER DELIN TEMP YELLOW EA 2,060 6.04 12,439.00
2046 TEMPORARY SBGR LF 5,087.50 8.31 42,261.63
2052 GR ANCHOR TYP ***** TEMP EA 23 825.04 18,976.00
2055 GR ANCHOR TYP ***** TEMP EA 34 1,587.01 53,958.50
1768 THERMO PVT MKG LINES 4"90 LF 9,251,391 0.30 2,792,944.65
1769 THERMO PVT MKG LINE 4"120 LF 4,939,877 0.35 1,711,498.68
1776 6"WIDE THERMO 120 MILS LF 125,100 0.45 56,574.00
1772 8"WIDE THERMO 90 MILS LF 135,885 0.75 102,407.78
1779 THERMO PVT MKG LINE 8"120 LF 31,182 1.03 32,281.81
1777 12"WIDE THERMO 90 MILS LF 15,278 1.57 23,995.00
1784 12"WIDE THERMO 120 MILS LF 445 1.19 532.00
1785 THERMO LINES 16" 120MILS LF 14,350 1.27 18,303.50
1775 24"WIDE THERMO 120 MILS LF 29,262 4.11 120,291.17
1830 THERMO CHARACTER 120MILS EA 914 49.47 45,214.64
1854 THERMO PVT SYMBOL 90MILS EA 5,621 72.29 406,356.54
1860 6" EPOXY PVT MKG LINES LF 11,120 0.67 7,450.40
1858 8" EPOXY PVT MKG LINES LF 86,000 0.77 66,220.00
1862 12" EPOXY PVT MKG LINES LF 1,600 1.03 1,648.00
1899 EPOXY PVT MKG SYMBOL EA 6 102.56 615.36
1920 4" COLD APPL PLSTIC LINES LF 6,277 1.40 8,796.10
1922 24" COLD APPL PLSTIC LINE LF 200 10.00 2,000.00
1956 COLD APPL PLSTIC CHARACT EA 12 60.00 720.00
2073 PAINT PVMT MARKINGS 4" LF 14,205,792 0.09 1,297,253.68
2077 PAINT PVMT MARKINGS 6" LF 88,413 0.12 10,564.73
2079 PAINT PVMT MARKINGS 8" LF 190,358 0.26 48,795.22
2078 PAINT PVMT MARKINGS 12" LF 15,200 0.35 5,276.00
2086 PAINT PVT MKGS lines 16" LF 775 0.74 577.50
2085 PAINT PVMT MRKG LINES 24" LF 6,328 2.16 13,705.02
2107 PAINT PVT MKG CHARACTER EA 148 30.66 4,538.00
2113 PAINT PVT MKG SYMBOL EA 1,440 37.02 53,311.56
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 22
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
2100 LINE REMOVAL 4" WIDE LF 79,178 0.52 41,110.83
2102 LINE REMOVAL 8" WIDE LF 76,000 0.56 42,700.00
2129 LINE REMOVAL 24" WIDE LF 54 5.33 288.00
2127 SYMBOLS ETC REMOVAL EA 34 34.75 1,181.68
2001 CURING COMP REMOVAL LINES LF 1,200 0.85 1,020.00
2010 PERM RAIS PVT MARKERS EA 63,516 4.42 280,616.11
2007 SNO PLOWB RAIS PVT MKRS EA 11,620 32.58 378,549.50
2057 GRDRAIL DELIN PERM CRYS EA 8,371 6.22 52,107.06
2062 GRDRAIL DELIN PERM YELLOW EA 21,243 5.62 119,381.55
1698 BARRIER DELIN PERM CRYST EA 727 9.28 6,744.20
1699 BARRIER DELIN PERM YELLOW EA 160 6.98 1,117.08
1695 7' U-CHANNEL POSTS EA 30 42.27 1,268.00
1718 FLXBL DELINTR (CRYSTAL) EA 1,672 24.82 41,500.79
1720 FLXBL DELINTR (YELLOW) EA 629 24.15 15,188.48
1721 FLXBL DELINTR (CRY & RED) EA 190 25.26 4,799.20
1733 FLXBL DELINTR (YEL & RED) EA 165 25.01 4,126.75
2019 OBJECT MARKERS, TYPE 1 EA 1 100.00 100.00
1703 OBJECT MARKERS, TYPE 3 EA 33 119.39 3,940.00
1704 OBJECT MARKERS, END OF RD EA 14 83.57 1,170.00
1290 PORTABLE LIGHTING LS 14 30,342.28 424,792.00
1484 FND CONDIT MAT CL ******* TON 4,574.55 14.46 66,152.75
1480 BEDDING MATL, CL ******** TON 4,574.55 14.07 64,368.25
1485 PVMT REPAIR UTILITY WORK TON 738.82 113.38 83,768.00
1322 6" DI WATER PIPE ******** LF 47 13.00 611.00
1323 8" DI WATER PIPE ******** LF 3,694 15.43 57,011.50
1325 12"DI WATER PIPE ******** LF 8 125.00 1,000.00
1306 4" DI WATER PIPE PC 350 LF 156 18.33 2,859.00
1307 6" DI WATER PIPE PC 350 LF 902 24.15 21,780.16
1308 8" DI WATER PIPE PC 350 LF 967 22.72 21,966.50
1309 10" DI WATER PIPE PC 350 LF 880 31.50 27,720.00
1310 12" DI WATER PIPE PC 350 LF 2,431 36.24 88,099.65
1311 16" DI WATER PIPE PC **** LF 13,100 35.93 470,718.62
1313 24" DI WATER PIPE PC **** LF 1,520 66.99 101,824.80
1298 DI RES JT FITTNS ******** LB 9,860 2.88 28,378.75
1316 3/4"CU WATER PIPE TYPE ** LF 1,918 11.15 21,383.55
1355 2"PVC WATER PIPE ******** LF 495 5.93 2,935.40
1356 4"PVC WATER PIPE ******** LF 2,157 5.00 10,785.00
1357 6"PVC WATER PIPE ******** LF 619 7.00 4,333.00
1358 8"PVC WATER PIPE ******** LF 1,844 17.66 32,562.00
1359 10"PVC WATER PIPE******** LF 38 11.00 418.00
1360 12"PVC WATER PIPE******** LF 27,733 12.00 332,796.00
1362 6" PVC H2O P C900 ** *** LF 1,615 14.00 22,610.00
1363 8" PVC H2O P C900 ** *** LF 191 20.00 3,820.00
1364 DI H2O FITTINGS 250# MIN LB 63,461 2.62 166,528.26
1343 3/4"PE WAT TUBN SDR9 **** LF 5,872 2.53 14,875.00
1368 3/4" CORPORATION STOP EA 126 33.93 4,275.75
1369 1" CORPORATION STOP EA 1 140.00 140.00
1371 2" CORPORATION STOP EA 7 112.14 785.00
1397 **" GATE V&VB *****WP EA 21 330.71 6,945.00
1398 6" GATE V&VB *****WP EA 35 506.01 17,710.50
1399 8" GATE V&VB *****WP EA 12 705.96 8,471.50
1400 10" GATE V&VB *****WP EA 2 1,080.00 2,160.00
1401 12" GATE V&VB *****WP EA 12 1,158.33 13,900.00
1425 **"AIR RELEASE VALVE & MH EA 2 1,850.00 3,700.00
1414 8" TAPN SLVE V&VB *****WP EA 1 2,250.00 2,250.00
1422 **"X **" TAPPING SADDLE EA 2 225.00 450.00
1421 **"X3/4" TAPPING SADDLE EA 100 131.03 13,102.74
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 23
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
1446 1" AIR RELEASE ASSEMBLY EA 2 1,945.00 3,890.00
1447 2" AIR RELEASE ASSEMBLY EA 2 2,500.00 5,000.00
1423 **"TRANSIT COUPLN ******* EA 2 1,000.00 2,000.00
1439 RELOCATE EXIST WAT METER EA 37 208.85 7,727.60
1430 FIRE HYDRANTS, *****WP EA 8 1,411.25 11,290.00
1433 RELOCATE EXIST FIRE HYD EA 41 970.27 39,781.20
1488 4" PVC SEWER PIPE, SDR ** LF 500 9.00 4,500.00
1490 8" PVC SEWER PIPE, SDR ** LF 607 11.60 7,041.20
1496 6"PVC FORCE MN SDR******* LF 955 15.00 14,325.00
1536 8" DI SEWR PIPE CL ***** LF 475 33.00 15,675.00
1540 18"DI SEWR PIPE CL ***** LF 679 100.00 67,900.00
1541 24"DI SEWR PIPE CL ***** LF 412 125.00 51,500.00
1542 30"DI SEWR PIPE CL ***** LF 135 385.00 51,975.00
1501 4" DI SEWER PIPE PC 350 LF 200 18.75 3,750.00
1502 6" DI SEWER PIPE PC 350 LF 68 16.00 1,088.00
1503 8" DI SEWER PIPE PC 350 LF 632 28.02 17,712.00
1504 10" DI SEWER PIPE PC 350 LF 280 34.00 9,520.00
1505 12" DI SEWER PIPE PC 350 LF 40 26.00 1,040.00
1508 24" DI SEWER PIPE PC *** LF 329 86.02 28,302.50
1548 8" DI FORC MAIN ******* LF 163 22.00 3,586.00
1574 DI SS PIPE FITNS ******* LB 930 3.84 3,575.00
1622 SANITARY SEWER CLEAN-OUT EA 25 133.60 3,340.00
1581 4'DIA PC SS MH 0-6' EA 19 1,360.53 25,850.00
1585 5'DIA PC SS MH 0-6' EA 5 1,800.00 9,000.00
1600 PC CONC MH WALL 4'D 6'+ LF 32.60 425.18 13,861.00
1601 PC CONC MH WALL 5'D 6'+ LF 33.30 236.19 7,865.00
1644 FIL OR REMV **" PIPE, *** LF 746 16.96 12,650.00
1645 FIL OR REMV 6" PIPE, **** LF 922 8.00 7,376.00
1646 FIL OR REMV 8" PIPE, **** LF 138 2.00 276.00
1648 FIL OR REMV 12" PIPE, *** LF 681 3.51 2,391.00
1604 BRK DN,PLUG & FILL UT MH EA 3 466.67 1,400.00
1613 BREAK DOWN & REBUILD MH EA 3 710.50 2,131.50
1616 REMOVE EXISTING MANHOLE EA 7 750.00 5,250.00
1468 **"STL NCAS PIPE *****"OC LF 853 46.54 39,700.00
1469 12-3/4"NCAS PIPE *****"OC LF 181 25.00 4,525.00
1471 24"STL NCAS PIPE *****"OC LF 680 60.00 40,800.00
1474 **"STL NCAS PIPE *****B&J LF 333 79.95 26,625.00
1475 12-3/4"NCAS PIPE *****B&J LF 136 55.00 7,480.00
1477 24"STL NCAS PIPE *****B&J LF 129 172.32 22,228.80
1090 TEMPORARY SILT FENCE LF 383,605 1.51 581,334.55
1100 EROS CONTRL STONE CL A TON 329 48.18 15,850.60
1101 EROS CONTRL STONE CL B TON 24,475 29.33 717,775.20
1099 SEDIMENT CONTROL STONE TON 11,328 24.92 282,348.45
1084 TEMPORARY MULCHING ACR 840.50 411.16 345,578.00
1068 SEED FOR TEMP SEEDING LB 34,225 2.88 98,460.50
1069 FERT FOR TEMP SEEDING TON 137.30 493.82 67,801.40
1085 TEMPORARY SLOPE DRAINS LF 12,085 10.59 127,984.25
1097 INLET PROTCN @ SLOPE DRNS EA 286 201.93 57,753.00
42 SILT EXCAVATION CY 114,410 5.50 629,451.50
1059 SYNTHETIC ROVING SY 63,840 1.81 115,444.75
1076 MATTING FOR EROS CONTROL SY 59,152 1.81 107,309.70
1102 1/4" HARDWARE CLOTH LF 17,135 3.99 68,404.00
1109 **" TEMPORARY PIPE LF 980 12.81 12,551.20
1110 FLOAT TURBIDITY CURTAIN SY 2,875 12.43 35,740.00
44 **X**X** CSP T RISER 064" EA 1 3,000.00 3,000.00
45 **X**X** CSP T RISER 079" EA 1 3,000.00 3,000.00
46 **X**X** CSP T RISER 109" EA 5 4,000.00 20,000.00
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 24
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
1096 STILLING BASINS CY 2,503 19.63 49,139.85
1083 SELECT UNDERGRTH REMOVAL ACR 1 1,600.00 1,600.00
1064 SEEDING AND MULCHING ACR 1,462.38 1,124.41 1,644,309.28
1067 MOWING ACR 543.02 44.76 24,303.56
1070 SEED FOR REPAIR SEEDING LB 11,665 5.60 65,326.00
1071 FERT FOR REPAIR SEEDING TON 29.58 715.63 21,168.34
1072 SEED FOR SUPP SEEDING LB 22,850 2.40 54,844.00
1074 SODDING SY 973,771 4.54 4,426,487.00
1075 WATER M/G 6,190.44 70.83 438,501.05
1077 FERTILIZER TOPDRESSING TON 679.24 350.69 238,205.26
1103 IMPERVIOUS DIKE LF 4,235 54.64 231,425.25
1104 SPECIALIZED HAND MOWING HR 179.50 44.69 8,022.60
1105 RESPONSE FOR EROS CONTROL EA 120 199.28 23,914.00
1112 CULVERT DIVERSION CHANNEL CY 1,660 14.77 24,515.00
2417 RED MAPLE EA 29 80.87 2,345.25
2525 FLOWERING DOGWOOD EA 5 78.75 393.75
1092 REFORESTATION ACR 51.23 647.33 33,163.00
1113 STREAMBANK REFORESTATION ACR 1.92 14,012.55 26,904.10
1091 WETLAND REFORESTATION ACR 29.30 969.96 28,419.90
2729 MULCH FOR PLANTING CY 82 46.88 3,844.00
2731 WATER FOR PLANTING M/G 2.70 148.48 400.90
2741 3 SECT 12" SIG HEAD EA 48 432.34 20,752.44
2743 4 SECT 12" VERTICL SIG HD EA 4 550.00 2,200.00
2747 5 SECT 12" SIG HEAD EA 20 703.56 14,071.24
2769 RELOC 3 SECT 12" SIG HD EA 6 150.00 900.00
2771 RELOC 4 SECT 12"VERT SIG EA 2 150.00 300.00
2865 LOUVER FOR 12" SIG SECT EA 26 85.00 2,210.00
2867 12" PEDEST SIG HEAD EA 8 465.00 3,720.00
2872 SIGN EA 32 122.87 3,932.00
2734 12-4 TRAFFIC SIG CABLE LF 700 2.00 1,400.00
2880 AERIAL COMMUNICAT CABLE LF 19,500 2.00 39,000.00
2878 1/4" MESSENGER CABLE LF 165,342 0.93 153,220.46
2877 3/8" MESSENGER CABLE LF 5,130 1.79 9,184.55
2941 SPLICE CABINET EA 1 3,580.30 3,580.30
2939 INTERCONNECT CENTER EA 36 1,558.57 56,108.52
2912 2-8 PHASE CONTRL & CAB EA 7 9,368.32 65,578.25
2915 INSTL 2-8 PH CONTRL & CAB EA 2 2,000.00 4,000.00
2918 MOD CONTRL & CABINET EA 4 1,500.00 6,000.00
2922 FOUNDAT FOR CONTRLR CABNT EA 7 666.61 4,666.26
2896 INDUCTIVE LOOP SAWCUT LF 58,454 3.65 213,583.06
2904 LEAD-IN CABLE LF 42,350 1.04 44,181.00
2907 2" PVC CONDUIT LF 11,342 1.36 15,395.00
2908 TRENCHING (UNPAVED) LF 12,197 3.69 45,034.50
2909 TRENCHING (PAVED) LF 245 18.96 4,645.00
2923 ONE-CHNL DETECTOR UNIT EA 5 236.06 1,180.30
2902 TWO-CHNL DETECTOR UNIT EA 45 372.70 16,771.69
2925 PULL BOX EA 168 266.10 44,705.68
2940 OVER-SIZED PULL BOX EA 50 973.99 48,699.60
2928 WOOD POLE EA 26 627.68 16,319.76
2926 1" RISER WITH WEATHERHEAD EA 33 324.57 10,710.80
2927 2" RISER WITH WEATHERHEAD EA 186 289.15 53,782.68
2751 GUY ASSEMBLY EA 105 216.89 22,773.40
2871 PEDESTRIAN SIG PEDESTAL EA 2 1,050.00 2,100.00
2929 METAL POLE EA 11 3,648.36 40,132.00
2942 MASTARM LF 400 28.60 11,440.00
2756 RIGID SIG HEAD MOUNTING EA 19 156.26 2,969.00
2791 RIGID SIGN MOUNTING BRACK EA 6 100.00 600.00
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 25
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
2933 FOUNDATION FOR METAL POLE EA 11 2,482.09 27,303.00
2936 JACKING & BORING LF 425 27.70 11,775.00
2179 CM&R TEMP STR *********** LS 2 117,354.10 234,708.20
2182 REMV EXIST STR ********** LS 1 20,000.00 20,000.00
2185 REMV EXIST STR ********** LS 42 34,418.10 1,445,560.40
2191 REMV EXIST STR ********** LS 15 16,505.07 247,576.00
2194 FOUNDATION EXCAVATION CY 416 38.32 15,940.00
2200 FND EXCAV EB** STA******* LS 1 10,000.00 10,000.00
2203 FND EXCAV B** STA ******* LS 16 15,781.25 252,500.00
2204 **'-**" DRILLD PIER NO RK LF 5,091 309.17 1,573,971.04
2205 **'-**" DRILLD PIER IN RK LF 1,260.27 1,073.86 1,353,359.31
2207 **' - **" DIA STL CASING LF 1,520.78 169.67 258,032.52
2206 UNCLASSIFIED STR EXCAV CY 9,102.20 9.60 87,427.70
2208 CULV EXCAV *********** LS 22 17,514.75 385,324.50
2211 FND CONDIT MAT, BOX CULV TON 4,590 25.68 117,893.45
2217 REINF CONCRETE DECK SLAB SF 246,351.70 16.27 4,007,982.17
2219 GROOVING BRIDGE FLOORS SF 207,687.30 0.53 110,107.50
2221 CLASS AA CONC (BRIDGE) CY 1,810.70 339.53 614,790.13
2222 CLASS A CONCRETE (BRIDGE) CY 6,598.10 478.33 3,156,060.54
2228 CLASS A CONCRETE (CULV) CY 9,669.60 300.27 2,903,498.96
2365 BRG APPR SLAB *********** LS 45 15,756.33 709,034.98
2234 REINF STEEL (BRIDGE) LB 1,777,415 0.55 985,849.26
2237 EPOXY COAT REINF STL BRDG LB 64,617 0.55 35,539.35
2243 SPIRAL COL REINF STL BRG LB 269,394 1.01 273,522.88
2246 REINF STEEL (CULVERT) LB 1,532,388 0.53 812,198.15
2252 36" PRESTR CONCRETE GIRDR LF 10,913.18 77.23 842,811.90
2253 45" PRESTR CONCRETE GIRDR LF 5,254.46 112.47 590,992.01
2254 54" PRESTR CONCRETE GIRDR LF 6,367.48 122.26 778,515.48
2255 STRUCTURAL STEEL LS 4,191,179 1.14 4,796,759.40
2262 PAINTING STR STL ******** LS 1 125,000.00 125,000.00
2278 12" PRESTR CONC PILES LF 1,248 29.73 37,102.20
2290 HP12X53 PILES LF 37,278 24.43 910,659.00
2299 HP14X73 PILES LF 6,746 32.23 217,416.50
2303 STEEL PILE POINTS EA 330 105.39 34,778.36
2304 STEEL PILE TIPS EA 5 360.00 1,800.00
2301 PNTING STL PILES @ ****** LS 7 12,274.86 85,924.00
2317 METHOD A WATERPROOFING SY 211.20 42.00 8,870.40
2326 METHOD D DAMPPROOFING SY 474.40 44.10 20,920.60
2341 TWO BAR METAL RAIL LF 1,799.11 72.57 130,563.39
2353 CONCRETE BARRIER RAIL LF 15,554.05 44.49 692,075.60
2355 1'-**"X*****"CONC PARAPET LF 1,865.58 51.02 95,181.32
2389 4" SLOPE PROTECTION SY 5,406 42.88 231,788.00
2382 PLAIN RIP RAP II (2'-0") TON 19,550 32.98 644,769.65
2378 FILTER FABRIC FOR RIP RAP SY 1,525 2.92 4,456.50
2371 TFE EXPANS BEARING ASSMBL LS 1 6,800.00 6,800.00
2372 POT BEARINGS LS 2 34,000.00 68,000.00
2374 ELASTOMERIC BEARINGS LS 34 3,727.20 126,725.00
2390 EVAZOTE JOINT SEALS LS 16 8,310.00 132,960.00
2391 STRIP SEALS LS 1 6,000.00 6,000.00
2392 EXPANSION JOINT SEALS LS 2 21,500.00 43,000.00
2393 MODULAR EXP JOINT SEALS LS 1 59,203.82 59,203.82
2398 ELEC CONDUIT SYS ******** LS 4 11,800.00 47,200.00
2404 STR DRN SYS ************ LS 1 115,000.00 115,000.00
2407 SELECT BKFILL MAT CL ** TON 300 35.00 10,500.00
2410 3'-0"X 1'-6"PRESTR SLABS LF 7,588.07 78.43 595,135.25
2413 3'-0"X 1'-9"PRESTR SLABS LF 19,725.65 79.91 1,576,252.39
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 26
MISC. ITEMS NOT INCLUDED IN ABOVE ITEM LIST.
MISC. GRADING 10,320,768.22
MISC. DRAINAGE 915,721.47
MISC. PAVING 29,071,210.93
MISC. FENCING 15,223.00
MISC. BUILDINGS 1.00
MISC. LANDSCAPING 1,982,945.37
MISC. SIGNS 1,464,058.66
MISC. SIGNALIZATN 4,840,092.56
MISC. LIGHTING 51,900.00
MISC. UTILITIES 301,784.00
MISC. RR TRACK 322,373.50
MISC. CULVERTS 12,740.00
MISC. BRIDGES 667,512.27
MISC. OTHER 11,062,557.85
MISC. ELECTRICAL 1,612.50
TOTALS FOR ALL ITEMS IN EACH WORK GROUP.
TOTAL GRADING 52,536,605.40
TOTAL DRAINAGE 7,675,880.91
TOTAL PAVING 147,797,140.86
TOTAL FENCING 333,467.90
TOTAL BUILDINGS 95,759.00
TOTAL LANDSCAPING 12,619,964.56
TOTAL SIGNS 2,783,875.27
TOTAL SIGNALIZATN 5,865,018.05
TOTAL LIGHTING 476,692.00
TOTAL UTILITIES 2,608,907.48
TOTAL RR TRACK 322,373.50
TOTAL CULVERTS 4,479,231.06
TOTAL BRIDGES 28,849,059.02
TOTAL OTHER 22,970,052.97
TOTAL ELECTRICAL 9,657,354.31
GRAND TOTAL 299,071,382.29
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 27
AVERAGE UNIT BIDS
DIVISION 01
DATE 9901-9912
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
***** MAY 1999 *****
06/01 R-3845 8.1052001 DARE 874,400.00 RWY STP 75 11.606 2 0 0 1 1 5
PROJECT TOTAL = 874,400.00 L. S. LEE, INC.
07/01 R-3846 8.1130301 TYRRELL 645,547.50 RWY STP 56 11.483 2 0 0 1 1 13
PROJECT TOTAL = 645,547.50 L. S. LEE, INC.
***** MAY 1999 TOTAL = $1,519,947.50
***** JUN 1999 *****
07/01 R-3838 8.1051902 DARE 394,737.16 RWY STP 31 12.534 4 0 0 1 1 5
PROJECT TOTAL = 394,737.16 R. P. C. CONTRACTING,
***** JUN 1999 TOTAL = $394,737.16
***** JUL 1999 *****
07/01 R-3838 8.1051903 DARE 707,082.00 RWY STP 56 12.553 4 0 0 1 1 5
PROJECT TOTAL = 707,082.00 APEX CONTRACTING, INC.
***** JUL 1999 TOTAL = $707,082.00
***** NOV 1999 *****
06/01 R-3838 8.1051904 DARE 3,069,235.00 RWY STP 230 13.317 2 0 0 S 1 1 5
PROJECT TOTAL = 3,069,235.00 BARNHILL CONTRACTING C
07/01 R-3839 8.1080801 HYDE 2,737,293.70 RWY STP 231 11.872 2 614 0 1 1 8
PROJECT TOTAL = 2,737,293.70 BARNHILL CONTRACTING C
***** NOV 1999 TOTAL = $5,806,528.70
GRAND TOTAL = $8,428,295.36
COST/PROJECT MILE = $114,881.69 TOTAL PROJECT MILES = 73.365
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 28
AVERAGE UNIT BIDS
DIVISION 01
DATE 9901-9912
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
1 MOBILIZATION LS 6 68,630.17 411,781.00
22 SOIL STABILIZATION FABRIC SY 1,190 1.25 1,487.50
28 BORROW EXCAVATION CY 34,150 7.04 240,301.00
56 ROCK EMBANKMENT TON 945 75.00 70,875.00
59 FNDATION MATL, MINOR STRS TON 15 30.00 450.00
580 INCIDENTAL STONE BASE TON 445 33.21 14,780.00
611 ASPH PM PAVEMENT REPAIR TON 40 100.00 4,000.00
687 PIPE REMOVAL LF 290 7.50 2,175.00
726 PIPE PLUGS CY 4 2,000.00 8,000.00
731 FLOWABLE FILL CY 66 120.00 7,920.00
899 STL BM GUARDRAIL LF 98,075 10.62 1,041,718.75
902 SBGR SHOP CURVED LF 209 13.46 2,813.50
910 20"TUBULAR 3C GUARDRAIL LF 1,359 65.73 89,335.00
911 W-TR SBGR TRANS SECTIONS EA 28 314.28 8,800.00
959 ADDIT GUARDRAIL POSTS EA 140 51.14 7,160.00
917 GR ANCHOR TYPE ********** EA 178 2,042.02 363,480.00
920 GR ANCHOR TYPE ********** EA 1 1,500.00 1,500.00
935 GR ANCHOR TYPE AT-1 EA 6 466.67 2,800.00
878 REMOVE EXISTING GUARDRAIL LF 1,105 1.99 2,205.00
1045 PLAIN RIP RAP, CLASS I TON 100 52.00 5,200.00
1769 THERMO PVT MKG LINE 4"120 LF 49,775 0.49 24,389.75
2073 PAINT PVMT MARKINGS 4" LF 631,546 0.10 63,154.60
2010 PERM RAIS PVT MARKERS EA 1,685 4.31 7,271.35
2057 GRDRAIL DELIN PERM CRYS EA 3,370 5.95 20,060.00
1090 TEMPORARY SILT FENCE LF 333,950 1.29 431,007.50
1076 MATTING FOR EROS CONTROL SY 12,900 1.30 16,840.00
1110 FLOAT TURBIDITY CURTAIN SY 2,720 12.00 32,640.00
1064 SEEDING AND MULCHING ACR 67.22 959.98 64,529.67
1067 MOWING ACR 74 45.00 3,330.00
1070 SEED FOR REPAIR SEEDING LB 845 4.03 3,403.00
1071 FERT FOR REPAIR SEEDING TON 1.80 311.94 561.50
1074 SODDING SY 41,640 4.00 166,560.00
1075 WATER M/G 321 90.03 28,901.25
1103 IMPERVIOUS DIKE LF 30 250.00 7,500.00
1104 SPECIALIZED HAND MOWING HR 58 29.31 1,700.00
MISC. ITEMS NOT INCLUDED IN ABOVE ITEM LIST.
MISC. GRADING 2,176,118.55
MISC. PAVING 2,781,126.50
MISC. LANDSCAPING 312,419.94
TOTALS FOR ALL ITEMS IN EACH WORK GROUP.
TOTAL GRADING 4,030,749.30
TOTAL DRAINAGE 16,370.00
TOTAL PAVING 2,875,612.45
TOTAL LANDSCAPING 1,069,392.86
TOTAL OTHER 411,781.00
TOTAL ELECTRICAL 24,389.75
GRAND TOTAL 8,428,295.36
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 29
AVERAGE UNIT BIDS
DIVISION 02
DATE 9901-9912
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
***** JAN 1999 *****
12/01 F-3310 8.1171701 CRAVEN 10,768,441.00 MSC FBD 0.000 0 0 0 1 2 17
PROJECT TOTAL = 10,768,441.00 HALTER MARINE, INC.
13/01 R-2001 6.201016 LENOIR 9,290,697.46 RWY 1,778 5.225 2 0 0 L U C 1 2 20
13/02 R-2001 6.201016 LENOIR 166,491.44 RWY 0.000 0 0 0 L U C 1 2 20 DEEP RUN COS
13/03 R-2001 6.201016 LENOIR 143,297.76 CLV 0.000 1 2 3 L U C 1 2 20 450+65.00-L-
13/04 R-2001 6.201016 LENOIR 91,012.34 CLV 0.000 1 202 4 L U C 1 2 20 536+87.19-L
PROJECT TOTAL = 9,691,499.00 BARRUS CONSTRUCTION CO
14/01 4.6021201 CRAVEN 56,748.60 SUR 57 1.000 2 0 0 S 1 2 17 MAP 32
14/02 7.1611093 CARTERET 514,797.00 SUR 47 11.000 2 0 0 S 1 2 16 MAPS 1-2
14/03 7.1621093 CARTERET 311,014.00 SUR 35 8.800 2 0 0 S 1 2 16 MAPS 3-10
14/04 7.1670993 CARTERET 102,699.99 SUR 60 1.700 2 0 0 S 1 2 16 MAPS 11-12
14/05 7.1721093 CRAVEN 284,125.00 SUR 34 8.450 2 0 0 S 1 2 17 MAPS 13-20
14/06 7.1921093 JONES 173,021.00 SUR 27 6.450 2 0 0 S 1 2 19 MAPS 21-25
14/07 7.2121093 PAMLICO 151,649.00 SUR 35 4.300 2 0 0 S 1 2 21 MAPS 26-30
14/08 7.2174393 PAMLICO 12,681.00 SUR 36 0.350 2 0 0 S 1 2 21 MAP 31
PROJECT TOTAL = 1,606,735.59 BARRUS CONSTRUCTION CO
15/01 7.1511094 BEAUFORT 306,035.18 SUR 70 4.400 2 0 0 S 1 2 15 MAPS 1-4
15/02 7.1521094 BEAUFORT 476,921.05 SUR 27 17.900 2 0 0 S 1 2 15 MAPS 5-16
15/03 7.1570594 BEAUFORT 45,047.62 SUR 38 1.200 2 0 0 S 1 2 15 MAP 18
15/04 7.1574894 BEAUFORT 280,175.64 SUR 140 2.000 2 0 0 S 1 2 15 MAP 17
15/05 7.1821094 GREENE 233,873.65 SUR 25 9.400 2 0 0 S 1 2 18 MAPS 19-21
15/06 7.2011094 LENOIR 28,143.08 SUR 35 0.800 2 0 0 S 1 2 20 MAP 22
15/07 7.2021094 LENOIR 424,790.85 SUR 25 17.050 2 0 0 S 1 2 20 MAPS 23-32
15/08 7.2072494 LENOIR 983,255.54 SUR 129 7.600 2 0 0 S 1 2 20 MAPS 33-37
15/09 7.2211094 PITT 96,635.60 SUR 46 2.100 2 0 0 S 1 2 22 MAP 38
15/10 7.2221094 PITT 466,417.25 SUR 25 18.700 2 0 0 S 1 2 22 MAPS 39-46
PROJECT TOTAL = 3,341,295.46 GREENVILLE PAVING &
***** JAN 1999 TOTAL = $25,407,971.05
***** APR 1999 *****
09/01 R-3843 8.1151001 BEAUFORT 373,427.20 RWY STP 70 5.350 1 0 0 1 2 15 MAPS 1-9
PROJECT TOTAL = 373,427.20 BAGWELL FENCE COMPANY,
10/01 R-3842 8.1210101 BEAUFORT 528,972.00 RWY STP 68 7.800 1 0 0 1 2 15 MAP 1-13
PROJECT TOTAL = 528,972.00 MAKCO, INC.
***** APR 1999 TOTAL = $902,399.20
***** DEC 1999 *****
06/01 B-1204 8.1180601 GREENE 556,224.77 RWY BRS 1,291 0.431 2 0 0 B 1 2 18
06/02 B-1204 8.1180601 GREENE 757,962.31 BRG BRS 0.043 3 854 15 B 1 2 18 24+90.00 -L
PROJECT TOTAL = 1,314,187.08 DELLINGER, INC.
07/01 U-2916 8.2200201 LENOIR 2,590,214.06 MSC S 0.000 1 0 0 1 2 20
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 30
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
PROJECT TOTAL = 2,590,214.06 M. E. HUNTER & ASSOCIA
***** DEC 1999 TOTAL = $3,904,401.14
GRAND TOTAL = $30,214,771.39
COST/PROJECT MILE = $212,706.68 TOTAL PROJECT MILES = 142.049
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 31
AVERAGE UNIT BIDS
DIVISION 02
DATE 9901-9912
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
1 MOBILIZATION LS 6 124,164.00 744,984.00
5 CLEARING & GRUBBING LS 5 74,500.00 372,500.00
6 SUPP CLEARING & GRUBBING ACR 2 2,850.00 5,700.00
10 SEALING ABANDONED WELLS EA 1 1,225.00 1,225.00
13 UNCLASSIFIED EXCAVATION CY 109,860 4.72 518,265.00
26 REINF BRG APR FILL ****** LS 1 20,000.00 20,000.00
19 UNDERCUT EXCAVATION CY 24,350 5.24 127,690.00
21 SELECT GRANULAR MATERIAL CY 6,000 7.35 44,100.00
22 SOIL STABILIZATION FABRIC SY 2,000 1.45 2,900.00
28 BORROW EXCAVATION CY 57,400 5.50 315,800.00
34 DRAINAGE DITCH EXCAVATION CY 6,855 5.97 40,922.90
38 PIPE CLEAN-OUT LF 50 34.20 1,710.00
47 REMOVAL OF ASPHALT PVMT SY 9,350 2.94 27,461.50
59 FNDATION MATL, MINOR STRS TON 1,870 22.47 42,024.95
103 15"PARLL PIPE PF STL END EA 38 215.00 8,170.00
104 18"PARLL PIPE PF STL END EA 17 255.00 4,335.00
105 24"PARLL PIPE PF STL END EA 6 350.00 2,100.00
88 12" RC PIPE CULV III LF 432 21.00 9,072.00
89 15" RC PIPE CULV III LF 7,352 22.00 161,744.00
90 18" RC PIPE CULV III LF 4,032 23.61 95,192.00
91 24" RC PIPE CULV III LF 2,952 31.00 91,512.00
92 30" RC PIPE CULV III LF 324 42.00 13,608.00
93 36" RC PIPE CULV III LF 36 57.00 2,052.00
94 42" RC PIPE CULV III LF 292 75.00 21,900.00
97 60" RC PIPE CULV III LF 28 157.00 4,396.00
167 18" X PIPE RC END SECTION EA 9 510.00 4,590.00
168 24" X PIPE RC END SECTION EA 5 665.00 3,325.00
169 30" X PIPE RC END SECTION EA 4 1,000.00 4,000.00
196 15X**X**" RCP TEE III EA 2 430.00 860.00
197 15X15X15" RCP TEE III EA 4 435.00 1,740.00
200 24X**X**" RCP TEE III EA 1 525.00 525.00
217 **" RC PIPE ELBOW III EA 1 300.00 300.00
218 15" RC PIPE ELBOW III EA 2 315.00 630.00
239 **" CS PIPE CULV *****" LF 16 16.50 264.00
240 15" CS PIPE CULV 0.064" LF 1,032 16.40 16,924.80
241 18" CS PIPE CULV 0.064" LF 492 17.75 8,733.00
242 24" CS PIPE CULV 0.064" LF 184 21.40 3,937.60
297 **" BCCSP B *****" LF 96 17.10 1,641.60
303 15" BCCSP B 0.064" LF 48 22.80 1,094.40
440 **" BCCS ELB B *****" EA 6 142.50 855.00
441 15" BCCS ELB B 0.064" EA 2 142.50 285.00
552 FINE GRADING LS 1 20,000.00 20,000.00
553 SEALING PVMT CRACKS LB 2,000 3.00 6,000.00
546 LIME TRTD SOIL(QUICKLIME) SY 6,000 3.10 18,600.00
548 LIME FOR LIME TREATD SOIL TON 50 200.00 10,000.00
549 #57 STONE TON 16 47.50 760.00
556 AGGREGATE BASE COURSE TON 35,000 14.50 507,500.00
580 INCIDENTAL STONE BASE TON 200 25.88 5,176.00
584 MILLN BIT PVMT ** - ** SY 294,431 1.01 298,882.88
593 ASPHALT CEMENT TON 7,436 119.20 886,366.40
597 ASPH CONC BASE CO, HB TON