This bidtabs sheet is in English units. The Metric Units version is also available.
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 1
AVERAGE UNIT BIDS
DATE 9701-9712
COMPLETE FILE FOR THIS PERIOD
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
***** JAN 1997 *****
09/01 F-2415 8.1171501 CRAVEN 5,375,000.00 MSC FBD 0.000 0 0 0 1 2 17
PROJECT TOTAL = 5,375,000.00 STEINER SHIPYARD, INC.
10/01 B-2179 8.1750901 WATAUGA 215,332.90 RWY BRS 2,658 0.081 1 0 0 SLS U C 4 11 75
10/02 B-2179 8.1750901 WATAUGA 181,118.03 BRG BRS 0.012 1 333 15 SLS U C 4 11 75 18+52.00-L
PROJECT TOTAL = 396,450.93 TAYLOR & MURPHY CONST.
11/01 B-2538 8.2602201 DAVIDSON 432,048.30 RWY BRZ 1,403 0.308 2 612 0 S C 2 9 60
11/02 B-2538 8.2602201 DAVIDSON 155,133.00 CLV BRZ 0.005 1 2 7 S C 2 9 60 19+37.00-LRE
PROJECT TOTAL = 587,181.30 JOHN H. BRINKLEY, INC.
12/01 E-2987 8.2623101 FORSYTH 1,470,356.65 BRG STP 0.047 1 98 31 B 2 9 62 10+21.97-L-
PROJECT TOTAL = 1,470,356.65 FOWLER JONES BEERS CON
13/01 7.1511085 BEAUFORT 859,656.30 SUR 32 27.000 2 0 0 S 1 2 15 MAPS 1-2
13/02 7.1521085 BEAUFORT 280,475.00 SUR 23 11.950 2 0 0 S 1 2 15 MAPS 3-7
13/03 7.1574885 BEAUFORT 199,325.44 SUR 125 1.600 2 0 0 S 1 2 15 MAPS 8
13/04 7.1811085 GREENE 179,527.10 SUR 29 6.100 2 0 0 S 1 2 18 MAPS 9
13/05 7.1821085 GREENE 142,285.40 SUR 23 6.250 2 0 0 S 1 2 18 MAPS 10-12
13/06 7.2021085 LENOIR 290,442.10 SUR 24 12.250 2 0 0 S 1 2 20 MAPS 13-30
13/07 7.2072485 LENOIR 40,757.50 SUR 25 1.650 2 0 0 S 1 2 20 MAPS 31-36
13/08 7.2073685 LENOIR 10,028.40 SUR 40 0.250 2 0 0 S 1 2 20 MAPS 37
13/09 7.2211085 PITT 472,260.55 SUR 47 10.050 2 0 0 S 1 2 22 MAPS 38-39
13/10 7.2221085 PITT 434,442.30 SUR 25 17.250 2 0 0 S 1 2 22 MAPS 40-48
13/11 7.2271685 PITT 10,384.10 SUR 35 0.300 2 0 0 S 1 2 22 MAPS 49
13/12 7.2272085 PITT 67,617.23 SUR 128 0.530 2 0 0 S 1 2 22 AMSP 50
PROJECT TOTAL = 2,987,201.42 BARRUS CONSTRUCTION CO
14/01 7.1611086 CARTERET 166,497.40 SUR 37 4.500 2 0 0 S 1 2 16 MAP 1
14/02 7.1621086 CARTERET 135,857.50 SUR 36 3.750 2 0 0 S 1 2 16 MAPS 2-4
14/03 7.1711086 CRAVEN 271,138.96 SUR 37 7.300 2 0 0 S 1 2 17 MAPS 5
14/04 7.1721086 CRAVEN 1,158,559.50 SUR 28 40.900 2 0 0 S 1 2 17 MAPS 6-23
14/05 7.1771386 CRAVEN 13,793.50 SUR 31 0.450 2 0 0 S 1 2 17 MAPS 24
14/06 7.1772986 CRAVEN 40,220.46 SUR 38 1.050 2 0 0 S 1 2 17 MAPS 25
14/07 7.1774586 CRAVEN 18,417.50 SUR 26 0.700 2 0 0 S 1 2 17 MAPS 26
14/08 7.1775786 CRAVEN 107,548.31 SUR 47 2.290 2 0 0 S 1 2 17 MAPS 27
14/09 7.1911086 JONES 90,027.24 SUR 37 2.450 2 0 0 S 1 2 19 MAPS 28
14/10 7.1921086 JONES 195,167.50 SUR 27 7.300 2 0 0 S 1 2 19 MAPS 29-34
14/11 7.2121086 PAMLICO 191,747.00 SUR 26 7.400 2 0 0 S 1 2 21 MAPS 35-40
14/12 7.2170886 PAMLICO 42,807.66 SUR 30 1.450 2 0 0 S 1 2 21 MAPS 41-44
14/13 4.6023201 PAMLICO 21,785.50 SUR 27 0.820 2 0 0 S 1 2 21 MAPS 45-47
PROJECT TOTAL = 2,453,568.03 BARRUS CONSTRUCTION CO
16/01 R-2405 6.279005T PENDER 5,458,912.30 RWY 1,537 3.551 4 0 0 LS U C 1 3 27
PROJECT TOTAL = 5,458,912.30 BARRUS CONSTRUCTION CO
19/01 7.2521110 NEW HANOV 188,075.95 SUR 66 2.830 2 0 0 S 1 3 25 MAPS 1-5
19/02 7.2573210 NEW HANOV 358,190.90 SUR 112 3.200 2 0 0 S 1 3 25 MAPS 6-11
19/03 7.2611110 ONSLOW 506,458.15 SUR 78 6.500 2 0 0 S 1 3 26 MAPS 12
19/04 7.2621110 ONSLOW 276,302.80 SUR 53 5.200 2 0 0 S 1 3 26 MAPS 13-15
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 2
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
19/05 7.2711110 PENDER 1,194,515.40 SUR 81 14.800 2 0 0 S 1 3 27 MAPS 16-17
19/06 7.2721110 PENDER 215,686.20 SUR 51 4.240 2 0 0 S 1 3 27 MAPS 18-21
19/07 7.2770610 PENDER 29,138.05 SUR 65 0.450 2 0 0 S 1 3 27 MAPS 22-23
19/08 7.2774710 PENDER 99,318.75 SUR 58 1.700 2 0 0 S 1 3 27 MAPS 24-25
PROJECT TOTAL = 2,867,686.20 THE PAPCO GROUP, INC.
20/01 UM-256 5.4080011 WAKE 632,001.00 RWY 10,361 0.061 10 482 0 B 2 5 40
20/02 UM-256 5.4080011 WAKE 216,057.54 BRG 0.000 4 396 15 B 2 5 40 WESTBOUND LA
20/03 UM-256 5.4080011 WAKE 271,801.66 BRG 0.000 4 396 15 B 2 5 40 EASTBOUND LA
PROJECT TOTAL = 1,119,860.20 LANFORD BROTHERS COMPA
21/01 R-2558 6.469004T ROBESON 8,260,879.40 RWY 1,473 5.610 4 654 0 LS U C B 1 6 46
21/02 R-2558 6.469004T ROBESON 138,168.89 CLV 0.004 1 202 8 LS U C B 1 6 46 575+97.00-L
21/03 R-2558 6.469004T ROBESON 84,955.55 CLV 0.000 1 202 5 LS U C B 1 6 46 593+15.00-L
21/04 R-2558 6.469004T ROBESON 86,547.35 CLV 0.000 1 202 5 LS U C B 1 6 46 9+80.00C/LME
21/05 R-2558 6.469004T ROBESON 175,599.63 CLV 0.004 1 202 5 LS U C B 1 6 46 11+75.00-L1
21/06 R-2558 6.469004T ROBESON 280,155.70 BRG A 0.026 3 836 19 LS U C B 1 6 46 582+09-L-(WB
21/07 R-2558 6.469004T ROBESON 257,095.70 BRG A 0.000 3 836 19 LS U C B 1 6 46 582+09-L-(EB
21/08 R-2558 6.469004T ROBESON 753,608.50 BRG Q 0.052 3 854 15 LS U C B 1 6 46 20+55-L1-(WB
21/09 R-2558 6.469004T ROBESON 710,195.00 BRG Q 0.000 3 854 15 LS U C B 1 6 46 20+55-L1-(EB
21/10 R-2558 6.469004T COLUMBUS 377,506.70 BRG Q 0.026 2 845 19 LS U C B 1 6 43 27+59.9-L1-W
21/11 R-2558 6.469004T COLUMBUS 351,436.20 BRG Q 0.000 2 845 19 LS U C B 1 6 43 27+59.9-L1-E
21/12 R-2558 6.469004T COLUMBUS 52,660.00 BRG A 0.026 3 98 19 LS U C B 1 6 43 34+84.5-L1-W
21/13 R-2558 6.469004T COLUMBUS 258,896.70 BRG A 0.000 3 836 19 LS U C B 1 6 43 34+84.5-L1-E
PROJECT TOTAL = 11,787,705.32 BMCO CONSTRUCTION, INC
22/01 7.4711191 ALAMANCE 233,043.38 SUR 27 8.780 2 0 0 S 2 7 47 MAPS 1-2
22/02 7.4721191 ALAMANCE 584,870.94 SUR 27 21.770 2 0 0 S 2 7 47 MAPS 3-13
22/03 7.4770191 ALAMANCE 489,982.78 SUR 105 4.670 2 0 0 S 2 7 47 MAPS 14-17
22/04 7.4770791 ALAMANCE 19,618.46 SUR 36 0.550 2 0 0 S 2 7 47 MAPS 18-19
22/05 7.4772391 ALAMANCE 12,863.82 SUR 30 0.430 2 0 0 S 2 7 47 MAPS 20-21
PROJECT TOTAL = 1,340,379.38 RILEY PAVING, INC.
23/01 5.6021120 DAVIDSON 697,032.64 SUR 43 16.070 2 0 0 S 2 9 60 MAPS 1-8
23/02 7.6011159 DAVIDSON 527,499.69 SUR 55 9.520 2 0 0 S 2 9 60 MAPS 9-12
23/03 7.6021159 DAVIDSON 831,982.96 SUR 43 19.460 2 0 0 S 2 9 60 MAPS 13-19
PROJECT TOTAL = 2,056,515.29 MOFFITT & PIERCE CONST
24/01 5.6321119 ROWAN 109,028.15 SUR 69 1.580 2 0 0 S 2 9 63 MAPS 1-3
24/02 7.6311157 ROWAN 755,889.65 SUR 168 4.510 2 0 0 S 2 9 63 MAPS 4-6
24/03 7.6321157 ROWAN 1,544,516.75 SUR 81 19.010 2 0 0 S 2 9 63 MAPS 7-17
24/04 7.6370257 ROWAN 13,735.00 SUR 69 0.200 2 0 0 S 2 9 63 MAPS 18
24/05 7.6370657 ROWAN 26,310.00 SUR 64 0.410 2 0 0 S 2 9 63 MAPS 19
24/06 7.6371357 ROWAN 25,290.10 SUR 82 0.310 2 0 0 S 2 9 63 MAPS 20
24/07 7.6371457 ROWAN 160,954.60 SUR 88 1.820 2 0 0 S 2 9 63 MAPS 21
24/08 7.6372457 ROWAN 89,113.80 SUR 66 1.360 2 0 0 S 2 9 63 MAPS 22-23
PROJECT TOTAL = 2,724,838.05 THE PAPCO GROUP, INC.
25/01 7.6111158 DAVIE 274,384.43 SUR 82 3.340 2 0 0 S 2 9 61 MAP 1
25/02 7.6121158 DAVIE 185,220.95 SUR 62 3.010 2 0 0 S 2 9 61 MAPS 2-5
25/03 7.6171258 DAVIE 77,899.18 SUR 64 1.210 2 0 0 S 2 9 61 MAPS 6-7
PROJECT TOTAL = 537,504.56 THE PAPCO GROUP, INC.
26/01 7.6211160 FORSYTH 206,226.68 SUR 40 5.160 2 0 0 S 2 9 62 MAPS 1-2
26/02 7.6221160 FORSYTH 851,099.11 SUR 75 11.280 2 0 0 S 2 9 62 MAPS 3-8
26/03 7.6271860 FORSYTH 110,817.08 SUR 48 2.330 2 0 0 S 2 9 62 MAPS 9-10
26/04 7.6272360 FORSYTH 79,611.55 SUR 57 1.390 2 0 0 S 2 9 62 MAPS 11-12
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 3
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
26/05 7.6272860 FORSYTH 166,667.42 SUR 63 2.640 2 0 0 S 2 9 62 MAPS 13
PROJECT TOTAL = 1,414,421.84 THE PAPCO GROUP, INC.
27/01 U-1959 7.6411156 STOKES 222,490.98 SUR 52 4.320 2 0 0 S 2 9 64 MAPS 1-3
27/02 U-1959 7.6421156 STOKES 487,204.19 SUR 46 10.490 2 0 0 S 2 9 64 MAPS 4-7
27/03 U-1959 7.6472256 STOKES 18,190.00 SUR 61 0.300 2 0 0 S 2 9 64 MAPS 8
27/04 U-1959 9.8092212 STOKES 75,704.77 SUR 34 2.250 2 0 0 S 2 9 64 MAPS 9
PROJECT TOTAL = 803,589.94 VIRGINIA-CAROLINA PAVI
28/01 7.8011230 CLEVELAND 499,590.46 SUR 46 10.750 2 0 0 S 3 12 80 MAPS 1-2
28/02 7.8021230 CLEVELAND 785,424.42 SUR 34 23.100 2 0 0 S 3 12 80 MAPS 3-25
28/03 7.8072930 CLEVELAND 320,015.66 SUR 96 3.320 2 0 0 S 3 12 80 MAPS 26-31
28/04 7.8074030 CLEVELAND 24,017.50 SUR 32 0.750 2 0 0 S 3 12 80 MAP 32
28/05 7.8074130 CLEVELAND 39,511.46 SUR 27 1.480 2 0 0 S 3 12 80 MAP 33
28/06 7.8079630 CLEVELAND 14,510.20 SUR 32 0.450 2 0 0 S 3 12 80 MAP 34
28/07 7.8079730 CLEVELAND 87,712.08 SUR 54 1.620 2 0 0 S 3 12 80 MAP 35
28/08 7.8079930 CLEVELAND 56,726.42 SUR 42 1.350 2 0 0 S 3 12 80 MAP 36
28/09 7.8311230 LINCOLN 19,006.56 SUR 48 0.400 2 0 0 S 2 12 83 MAP 37
PROJECT TOTAL = 1,846,514.76 JOHN E. JENKINS, INC.
29/01 R-2623 9.8122511 CATAWBA 3,292,007.05 RWY 1,256 2.620 2 0 0 S U 2 12 79
29/02 R-2623 9.8122511 CATAWBA 428,602.75 BRG Q 0.030 3 845 15 S U 2 12 79 81+73.00 -L-
29/03 R-2623 9.8122511 CATAWBA 399,256.53 BRG Q 0.029 3 845 15 S U 2 12 79 111+63.50 -L
PROJECT TOTAL = 4,119,866.33 DIXIE GRADING & EQUIPM
30/01 7.0021089 TRANSYLVA 213,652.50 SUR 26 8.240 2 0 0 S 4 14 100 MAPS 1-12
30/02 7.9411089 HAYWOOD 612,324.11 SUR 130 4.720 2 0 0 S 4 14 94 MAPS 13-14
30/03 7.9421089 HAYWOOD 274,601.50 SUR 25 11.130 2 0 0 S 4 14 94 MAPS 15-28
30/04 7.9470489 HAYWOOD 141,897.23 SUR 107 1.320 2 0 0 S 4 14 94 MAP 29
30/05 7.9479989 HAYWOOD 2,354.50 SUR 47 0.050 2 0 0 S 4 14 94 MAP 30
PROJECT TOTAL = 1,244,829.84 ASHEVILLE DIVISION,
31/01 7.9111090 CHEROKEE 571,921.66 SUR 42 13.530 2 0 0 S 4 14 91 MAP 1-2
31/02 7.9121090 CHEROKEE 221,978.10 SUR 25 9.060 2 0 0 S 4 14 91 MAP 3-6
31/03 7.9221090 CLAY 82,489.80 SUR 37 2.200 2 0 0 S 4 14 92 MAP 7-8
31/04 7.9321090 GRAHAM 100,303.40 SUR 24 4.170 2 0 0 S 4 14 93 MAP 9-11
PROJECT TOTAL = 976,692.96 HARRISON CONST. CO., I
32/01 7.9511087 HENDERSON 142,334.70 SUR 83 1.720 2 0 0 S 4 14 95 MAPS 1
32/02 7.9521087 HENDERSON 739,460.00 SUR 34 21.440 2 0 0 S 4 14 95 MAPS 2-28
32/03 7.9571387 HENDERSON 42,395.32 SUR 137 0.310 2 0 0 S 4 14 95 MAPS 29
32/04 7.9821087 POLK 130,071.95 SUR 25 5.110 2 0 0 S 3 14 98 MAPS 30-34
32/05 7.9870787 POLK 15,593.90 SUR 26 0.610 2 0 0 S 3 14 98 MAPS 35
PROJECT TOTAL = 1,069,855.87 ASHEVILLE DIVISION,
33/01 7.9611088 JACKSON 1,228,190.44 SUR 130 9.430 2 0 0 S 4 14 96 MAPS 1-3
33/02 7.9621088 JACKSON 336,742.00 SUR 35 9.560 2 0 0 S 4 14 96 MAPS 4-12
33/03 7.9672088 JACKSON 194,660.84 SUR 87 2.240 2 0 0 S 4 14 96 MAPS 13-16
33/04 7.9672388 JACKSON 13,115.00 SUR 24 0.540 2 0 0 S 4 14 96 MAP 17
33/05 7.9672688 JACKSON 26,026.74 SUR 70 0.370 2 0 0 S 4 14 96 MAP 18
33/06 7.9711088 MACON 273,834.17 SUR 105 2.620 2 0 0 S 4 14 97 MAP 19
33/07 7.9721088 MACON 305,701.50 SUR 48 6.330 2 0 0 S 4 14 97 MAPS 20-25
33/08 7.9911088 SWAIN 763,347.34 SUR 155 4.910 2 0 0 S 4 14 99 MAPS 26
33/09 7.9921088 SWAIN 145,925.00 SUR 25 5.840 2 0 0 S 4 14 99 MAPS 27-32
33/10 7.9972688 SWAIN 97,480.86 SUR 137 0.710 2 0 0 S 4 14 99 MAPS 33
PROJECT TOTAL = 3,385,023.89 HARRISON CONST. CO., I
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 4
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
***** JAN 1997 TOTAL = $56,023,955.06
***** FEB 1997 *****
14/01 U-2556 8.1171003 CRAVEN 8,392,402.80 RWY STP 2,858 2.936 2 0 0 1 2 17
14/02 U-2556 8.1171003 CRAVEN 272,025.00 RWY STP 0.000 0 0 0 1 2 17 NEW BERN
14/03 U-2556 8.1171003 CRAVEN 88,781.53 CLV STP 0.000 1 202 9 1 2 17 53+61.50-L-
14/04 U-2556 8.1171003 CRAVEN 79,495.90 CLV STP 0.000 1 201 3 1 2 17 167+13.00-L-
PROJECT TOTAL = 8,832,705.23 BARRUS CONSTRUCTION CO
15/01 U-2802 9.8070186 ALAMANCE 865,760.50 RWY 2,697 0.321 2 0 0 S 2 7 47
15/02 U-2802 9.8070186 ALAMANCE 16,900.00 RWY 0.000 0 0 0 S 2 7 47 CITY OF BURL
PROJECT TOTAL = 882,660.50 SANTARO INDUSTRIES, IN
16/01 R-2422 6.804796 WAYNE 1,297,767.80 RWY 578 2.246 1 0 0 SLS U 2 4 33 10+50-129+10
PROJECT TOTAL = 1,297,767.80 BARRUS CONSTRUCTION CO
17/01 U-2226 9.8022831 CARTERET 5,613,225.00 RWY 2,338 2.401 4 0 0 S C 1 2 16
17/02 U-2226 9.8022831 CARTERET 75,467.62 CLV 0.000 1 1 17 S C 1 2 16 60+55.00-L
17/03 U-2226 9.8022831 CARTERET 77,264.57 CLV 0.000 1 1 10 S C 1 2 16 86+62.00-L
PROJECT TOTAL = 5,765,957.19 BARRUS CONSTRUCTION CO
18/01 U-2400 9.8100163 STANLY 6,455,928.68 RWY 1,913 3.375 2 614 0 S S UR C B 2 10 68
18/02 U-2400 9.8100163 STANLY 951,367.50 RWY 0.000 0 0 0 S S UR C B 2 10 68 ALBEMARLE
18/03 U-2400 9.8100163 STANLY 55,901.42 CLV 0.000 1 1 12 S S UR C B 2 10 68 56+15.00-L-R
18/04 U-2400 9.8100163 STANLY 278,265.46 CLV 0.007 1 3 8 S S UR C B 2 10 68 174+02.0-L-R
18/05 U-2400 9.8100163 STANLY 575,857.80 BRG I 0.023 3 745 12 S S UR C B 2 10 68 153+13.99-L-
PROJECT TOTAL = 8,317,320.86 BRANCH HIGHWAYS, INC.
19/01 5.5021154 ORANGE 258,047.90 SUR 33 7.900 2 0 0 S 2 7 50 MAPS 1-3
19/02 7.5011192 ORANGE 407,958.22 SUR 35 11.520 2 0 0 S 2 7 50 MAPS 4-7
19/03 7.5021192 ORANGE 433,092.40 SUR 60 7.270 2 0 0 S 2 7 50 MAPS 8-10
19/04 7.5070292 ORANGE 25,771.17 SUR 54 0.480 2 0 0 S 2 7 50 MAPS 11
19/05 7.5070392 ORANGE 351,295.25 SUR 98 3.580 2 0 0 S 2 7 50 MAPS 12-15
19/06 7.5071192 ORANGE 69,432.71 SUR 77 0.900 2 0 0 S 2 7 50 MAPS 16
19/07 7.5071692 ORANGE 8,642.20 SUR 86 0.100 2 0 0 S 2 7 50 MAPS 17
PROJECT TOTAL = 1,554,239.85 BLYTHE CONSTRUCTION, I
22/01 5.5221083 CHATHAM 95,725.30 SUR 28 3.410 2 0 0 S 2 8 52 MAP 3
22/02 7.5211037 CHATHAM 108,465.53 SUR 45 2.400 2 0 0 S 2 8 52 MAPS 1-2
22/03 7.5221037 CHATHAM 306,404.00 SUR 27 11.150 2 0 0 S 2 8 52 MAPS 3-12
22/04 7.5273037 CHATHAM 20,356.57 SUR 70 0.290 2 0 0 S 2 8 52 MAP 13
22/05 5.5411079 LEE 65,178.62 SUR 14 4.550 2 0 0 S 2 8 54 MAPS 1,2,4
22/06 5.5421079 LEE 7,000.00 SUR 0.000 0 0 0 S 2 8 54
22/07 5.5473779 LEE 17,250.00 SUR 18 0.970 2 0 0 S 2 8 54 MAPS 12,18
22/08 7.5411036 LEE 261,421.93 SUR 40 6.500 2 0 0 S 2 8 54 MAPS 1-5
22/09 7.5421036 LEE 131,354.98 SUR 24 5.440 2 0 0 S 2 8 54 MAPS 6-10
22/10 7.5473736 LEE 341,552.41 SUR 68 5.020 2 0 0 S 2 8 54 MAPS 11-20
PROJECT TOTAL = 1,354,709.34 LEE PAVING COMPANY
23/01 5.5521082 MONTGOMER 30,131.80 SUR 8 3.600 2 0 0 S 2 8 55 MAP 3
23/02 7.5511038 MONTGOMER 180,378.26 SUR 34 5.320 2 0 0 S 2 8 55 MAP 1-2
23/03 7.5521038 MONTGOMER 166,298.50 SUR 28 5.950 2 0 0 S 2 8 55 MAP 3-7
23/04 7.5570538 MONTGOMER 71,608.83 SUR 93 0.770 2 0 0 S 2 8 55 MAP 8-10
23/05 7.5572638 MONTGOMER 60,205.74 SUR 48 1.250 2 0 0 S 2 8 55 MAP 11-12
23/06 7.5574438 MONTGOMER 79,722.52 SUR 35 2.280 2 0 0 S 2 8 55 MAP 13-18
PROJECT TOTAL = 588,345.65 MOFFITT & PIERCE CONST
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 5
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
24/01 5.5621083 MOORE 98,492.00 SUR 23 4.300 2 0 0 S 2 8 56 MAP 3
24/02 7.5611035 MOORE 365,004.50 SUR 38 9.680 2 0 0 S 2 8 56 MAP 1
24/03 7.5621035 MOORE 367,590.00 SUR 29 12.500 2 0 0 S 2 8 56 MAPS 2-9
24/04 7.5670135 MOORE 13,593.50 SUR 38 0.360 2 0 0 S 2 8 56 MAPS 10
24/05 7.5674035 MOORE 102,930.75 SUR 90 1.150 2 0 0 S 2 8 56 MAP 11-12
PROJECT TOTAL = 947,610.75 HIGHWAY CONSTRUCTORS,
25/01 5.5721082 RANDOLPH 96,488.59 SUR 31 3.100 2 0 0 S 2 8 57 MAP 6,7,8
25/02 7.5711045 RANDOLPH 427,269.71 SUR 40 10.660 2 0 0 S 2 8 57 MAPS 1-5
25/03 7.5721045 RANDOLPH 529,211.55 SUR 24 21.700 2 0 0 S 2 8 57 MAPS 6-29
25/04 7.5770245 RANDOLPH 51,452.64 SUR 30 1.740 2 0 0 S 2 8 57 MAPS 30-32
25/05 7.5770345 RANDOLPH 277,220.47 SUR 75 3.700 2 0 0 S 2 8 57 MAPS 33-38
25/06 7.5773245 RANDOLPH 13,735.40 SUR 38 0.360 2 0 0 S 2 8 57 MAP 39
PROJECT TOTAL = 1,395,378.36 MOFFITT & PIERCE CONST
28/01 7.5321034 HOKE 125,403.50 SUR 23 5.370 2 0 0 S 2 8 53 MAPS 1-13
28/02 7.5911033 SCOTLAND 152,860.00 SUR 49 3.100 2 0 0 S 2 8 59 MAP 1
28/03 7.5921033 SCOTLAND 174,727.00 SUR 22 7.850 2 0 0 S 2 8 59 MAPS 2-7
28/04 7.5972133 SCOTLAND 55,159.50 SUR 45 1.220 2 0 0 S 2 8 59 MAPS 8-11
PROJECT TOTAL = 508,150.00 HIGHWAY CONSTRUCTORS,
29/01 7.5811037 RICHMOND 136,540.50 SUR 50 2.720 2 0 0 S 2 8 58 MAPS 1-2
29/02 7.5821037 RICHMOND 223,730.00 SUR 21 10.500 2 0 0 S 2 8 58 MAPS 3-11
29/03 7.5871637 RICHMOND 89,173.00 SUR 78 1.140 2 0 0 S 2 8 58 MAPS 12-13
29/04 7.5871837 RICHMOND 39,632.00 SUR 45 0.880 2 0 0 S 2 8 58 MAP 14
29/05 7.5873637 RICHMOND 24,237.50 SUR 61 0.400 2 0 0 S 2 8 58 MAPS 15-16
29/06 7.5874937 RICHMOND 34,572.00 SUR 38 0.920 2 0 0 S 2 8 58 MAP 17
PROJECT TOTAL = 547,885.00 HIGHWAY CONSTRUCTORS,
30/01 5.7021091 ALLEGHANY 41,530.12 SUR 10 4.000 2 0 0 S 3 11 70 MAPS 1-5
30/02 5.7221091 AVERY 77,704.46 SUR 10 7.700 2 0 0 S 4 11 72 MAPS 6-15
30/03 7.7021203 ALLEGHANY 152,566.09 SUR 10 14.610 2 0 0 S 3 11 70 MAPS 16-25
30/04 7.7121203 ASHE 257,436.27 SUR 10 25.550 2 0 0 S 4 11 71 MAPS 26-55
30/05 7.7221203 AVERY 70,218.48 SUR 10 7.350 2 0 0 S 4 11 72 MAPS 56-67
30/06 7.7521203 WATAUGA 199,315.06 SUR 10 19.210 2 0 0 S 4 11 75 MAPS 68-94
PROJECT TOTAL = 798,770.48 MAYMEAD, INC.
31/01 5.7421092 SURRY 151,693.58 SUR 11 14.120 2 0 0 S 2 11 74 MAPS 1-17
31/02 5.7621092 WILKES 56,217.76 SUR 11 5.260 2 0 0 S 3 11 76 MAPS 18-21
31/03 5.7721092 YADKIN 16,582.91 SUR 9 1.900 2 0 0 S 2 11 77 MAPS 22
31/04 7.7321204 CALDWELL 76,177.34 SUR 10 7.650 2 0 0 S 3 11 73 MAPS 23-39
31/05 7.7421204 SURRY 93,372.79 SUR 10 9.790 2 0 0 S 2 11 74 MAPS 40-44
31/06 7.7621204 WILKES 211,997.73 SUR 10 20.230 2 0 0 S 3 11 76 MAPS 45-59
31/07 7.7721204 YADKIN 201,695.11 SUR 10 19.920 2 0 0 S 2 11 77 MAPS 60-78
PROJECT TOTAL = 807,737.22 MAYMEAD, INC.
32/01 7.7011199 ALLEGHANY 329,171.30 SUR 57 5.790 2 0 0 S 3 11 70 MAPS 1-2
32/02 7.7021199 ALLEGHANY 5,492.50 SUR 32 0.170 2 0 0 S 3 11 70 MAPS 3
32/03 7.7111199 ASHE 567,097.00 SUR 70 8.060 2 0 0 S 4 11 71 MAPS 5-7
32/04 7.7171399 ASHE 184,984.00 SUR 157 1.180 2 0 0 S 4 11 71 MAPS 8-9
32/05 9.8112517 ALLEGHANY 66,213.60 SUR 60 1.100 2 0 0 S 3 11 70 MAP 5
PROJECT TOTAL = 1,152,958.40 JAMES R. VANNOY & SONS
33/01 7.7211200 AVERY 253,981.12 SUR 54 4.720 2 0 0 S 4 11 72 MAPS 1-2
33/02 7.7221200 AVERY 35,729.61 SUR 37 0.960 2 0 0 S 4 11 72 MAPS 3-4
33/03 7.7511200 WATAUGA 283,970.62 SUR 69 4.100 2 0 0 S 4 11 75 MAPS 7-8
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 6
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
33/04 7.7521200 WATAUGA 38,054.30 SUR 33 1.150 2 0 0 S 4 11 75 MAPS 9
33/05 7.7570400 WATAUGA 36,718.46 SUR 52 0.710 2 0 0 S 4 11 75 MAPS 10
33/06 9.8113203 AVERY 35,214.78 SUR 39 0.900 2 0 0 S 4 11 72 MAPS 5-6
PROJECT TOTAL = 683,668.89 MAYMEAD, INC.
34/01 U-2061 7.7311201 CALDWELL 407,234.27 SUR 93 4.360 2 0 0 S 3 11 73 MAPS 1-4
34/02 U-2061 7.7321201 CALDWELL 187,172.24 SUR 32 5.780 2 0 0 S 3 11 73 MAPS 5-7
34/03 U-2061 7.7371101 CALDWELL 247,225.39 SUR 106 2.340 2 0 0 S 3 11 73 MAP 8
34/04 U-2061 7.7371201 CALDWELL 144,855.14 SUR 115 1.260 2 0 0 S 3 11 73 MAP 9
34/05 U-2061 7.7371501 CALDWELL 432,547.78 SUR 87 4.990 2 0 0 S 3 11 73 MAPS 10-11
34/06 U-2061 7.7611201 WILKES 638,908.62 SUR 72 8.880 2 0 0 S 3 11 76 MAPS 12-15
34/07 U-2061 7.7621201 WILKES 392,162.01 SUR 38 10.200 2 0 0 S 3 11 76 MAPS 16-21
34/08 U-2061 7.7671901 WILKES 73,870.56 SUR 137 0.540 2 0 0 S 3 11 76 MAPS 22-23
34/09 U-2061 7.7672901 WILKES 49,042.36 SUR 77 0.640 2 0 0 S 3 11 76 MAPS 24
34/10 U-2061 9.8112940 WILKES 34,110.37 SUR 162 0.210 2 0 0 S 3 11 76 MASP 25
PROJECT TOTAL = 2,607,128.74 MIDSTATE CONTRACTORS,
35/01 U-2061 7.7411202 SURRY 715,019.22 SUR 58 12.280 2 0 0 S 2 11 74 MAPS 1-5
35/02 U-1961 7.7421202 SURRY 495,995.71 SUR 38 13.160 2 0 0 S 2 11 74 MAPD 6-12
35/03 U-1961 7.7470902 SURRY 94,163.00 SUR 66 1.430 2 0 0 S 2 11 74 MAPS 13-14
35/04 U-1961 7.7471702 SURRY 74,888.36 SUR 57 1.320 2 0 0 S 2 11 74 MAPS 15-17
35/05 U-1961 7.7711202 YADKIN 450,812.00 SUR 85 5.320 2 0 0 S 2 11 77 MAPS 21-22
35/06 U-1961 7.7721202 YADKIN 191,889.31 SUR 35 5.550 2 0 0 S 2 11 77 MAPS 23-25
35/07 U-1961 7.7770502 YADKIN 50,557.63 SUR 75 0.670 2 0 0 S 2 11 77 MAPS 26
35/08 U-1961 7.7770802 YADKIN 11,474.78 SUR 36 0.320 2 0 0 S 2 11 77 MAPS 27
35/09 U-1961 7.7771402 YADKIN 276,227.68 SUR 142 1.950 2 0 0 S 2 11 77 MAPS 28
35/10 U-1961 7.7773002 YADKIN 78,602.16 SUR 54 1.450 2 0 0 S 2 11 77 MAPS 29-30
35/11 U-2061 9.8110720 SURRY 46,903.77 SUR 72 0.650 2 0 0 S 2 11 74 MAPS 18-19
35/12 U-1961 9.8111763 SURRY 29,198.70 SUR 49 0.600 2 0 0 S 2 11 74 MAP 20
PROJECT TOTAL = 2,515,732.32 CARL ROSE & SONS, INC.
36/01 7.8211234 IREDELL 162,446.25 SUR 57 2.840 2 0 0 S 2 12 82 MAPS 1-2
36/02 7.8221234 IREDELL 968,374.62 SUR 44 21.990 2 0 0 S 2 12 82 MAPS 3-40
36/03 7.8273134 IREDELL 88,032.07 SUR 54 1.630 2 0 0 S 2 12 82 MAPS 41-44
PROJECT TOTAL = 1,218,852.94 CENTRAL CAROLINA DIVIS
37/01 7.8411187 BUNCOMBE 803,544.36 SUR 89 9.070 2 0 0 S 3 13 84 MAPS 1-2
37/02 7.8421187 BUNCOMBE 699,526.40 SUR 38 18.210 2 0 0 S 3 13 84 MAPS 3-19
37/03 7.8470287 BUNCOMBE 227,890.15 SUR 63 3.640 2 0 0 S 3 13 84 MAPS 20-25
37/04 7.8472687 BUNCOMBE 14,319.95 SUR 89 0.160 2 0 0 S 3 13 84 MAPS 26
37/05 9.8130526 BUNCOMBE 52,410.35 SUR 32 1.640 2 0 0 S 3 13 84 MAPS 27
PROJECT TOTAL = 1,797,691.21 ASHEVILLE DIVISION,
38/01 7.8511188 BURKE 559,900.58 SUR 54 10.440 2 0 0 S 3 13 85 MAPS 1-4
38/02 7.8521188 BURKE 576,528.76 SUR 41 14.000 2 0 0 S 3 13 85 MAPS 5-23
38/03 7.8570888 BURKE 17,057.78 SUR 43 0.400 2 0 0 S 3 13 85 MAPS 24
38/04 7.8571288 BURKE 10,686.62 SUR 43 0.250 2 0 0 S 3 13 85 MAPS 25
38/05 7.8571988 BURKE 149,040.09 SUR 47 3.190 2 0 0 S 3 13 85 MAPS 26-28
38/06 7.8572588 BURKE 14,067.08 SUR 43 0.330 2 0 0 S 3 13 85 MAPS 29
38/07 7.8579788 BURKE 45,066.53 SUR 43 1.060 2 0 0 S 3 13 85 MAPS 30
PROJECT TOTAL = 1,372,347.44 MIDSTATE CONTRACTORS,
39/01 7.8611186 MADISON 308,522.15 SUR 49 6.340 2 0 0 S 4 13 86 MAPS 1-3
39/02 7.8621186 MADISON 152,271.05 SUR 41 3.700 2 0 0 S 4 13 86 MAPS 4-7
39/03 7.8671386 MADISON 84,165.20 SUR 53 1.580 2 0 0 S 4 13 86 AMSP 8-9
39/04 7.9011186 YANCEY 719,476.45 SUR 40 17.920 2 0 0 S 4 13 90 MAPS 10-12
39/05 7.9021186 YANCEY 78,059.85 SUR 35 2.200 2 0 0 S 4 13 90 MAPS 13-14
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 7
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
39/06 7.9070786 YANCEY 150,975.60 SUR 85 1.780 2 0 0 S 4 13 90 MAPS 15
PROJECT TOTAL = 1,493,470.30 ASHEVILLE DIVISION,
40/01 7.8711190 MCDOWELL 673,870.54 SUR 49 13.670 2 0 0 S 3 13 87 MAPS 1-4
40/02 7.8721190 MCDOWELL 173,941.73 SUR 43 4.020 2 0 0 S 3 13 87 MAPS 5-9
40/03 7.8771690 MCDOWELL 38,137.10 SUR 50 0.760 2 0 0 S 3 13 87 MAPS 10
40/04 7.8772090 MCDOWELL 38,803.42 SUR 54 0.720 2 0 0 S 3 13 87 MAPS 11
40/05 7.8811190 MITCHELL 211,388.65 SUR 43 4.870 2 0 0 S 4 13 88 MAPS 12-14
40/06 7.8821190 MITCHELL 73,916.22 SUR 41 1.800 2 0 0 S 4 13 88 MAPS 15-17
40/07 7.8870390 MITCHELL 17,120.33 SUR 46 0.370 2 0 0 S 4 13 88 MAPS 18
40/08 7.8872490 MITCHELL 23,940.70 SUR 41 0.580 2 0 0 S 4 13 88 MAPS 19
PROJECT TOTAL = 1,251,118.69 ASHEVILLE DIVISION,
41/01 7.8911189 RUTHERFOR 729,529.71 SUR 52 13.900 2 0 0 S 3 13 89 MAPS 1-4
41/02 7.8921189 RUTHERFOR 463,565.97 SUR 44 10.500 2 0 0 S 3 13 89 MAPS 5-11
41/03 7.8971089 RUTHERFOR 76,990.43 SUR 47 1.640 2 0 0 S 3 13 89 MAPS 12-13
41/04 7.8972389 RUTHERFOR 25,832.94 SUR 47 0.550 2 0 0 S 3 13 89 MAPS 14
PROJECT TOTAL = 1,295,919.05 THOMPSON CONTRACTORS,
***** FEB 1997 TOTAL = $48,988,126.21
***** MAR 1997 *****
12/01 U-2302 8.1501003 ORANGE 5,638,751.39 RWY STP 2,759 2.044 5 634 0 S U CW 2 7 50 10+00-117+00
12/02 U-2302 8.1501003 ORANGE 49,987.30 RWY STP 0.000 0 0 0 S U CW 2 7 50 OWASA COST
12/03 U-2302 8.1501003 ORANGE 118,955.70 CLV STP 0.000 1 2 11 S U CW 2 7 50 99+30 -L-REV
PROJECT TOTAL = 5,807,694.39 RIFENBURG CONSTRUCTION
13/01 R-2218 8.T521103 CHATHAM 9,514,232.77 RWY NHF 1,763 5.396 4 0 0 C 2 8 52
13/02 R-2218 8.T521103 CHATHAM 49,529.96 CLV NHF 0.000 1 201 35 C 2 8 52 274+62.91-LM
13/03 R-2218 8.T521103 CHATHAM 76,190.87 CLV NHF 0.000 1 201 28 C 2 8 52 329+04.57-LM
13/04 R-2218 8.T521103 CHATHAM 97,968.36 CLV NHF 0.000 1 202 19 C 2 8 52 338+11.53-LM
13/05 R-2218 8.T521103 CHATHAM 8,825.08 CLV NHF 0.000 1 201 11 C 2 8 52 353+62.22-LM
13/06 R-2218 8.T521103 CHATHAM 39,255.57 CLV NHF 0.000 1 201 8 C 2 8 52 396+50.98-LM
13/07 R-2218 8.T521103 CHATHAM 30,037.42 CLV NHF 0.000 1 201 5 C 2 8 52 406+57.70-LM
13/08 R-2218 8.T521103 CHATHAM 57,191.28 CLV NHF 0.000 1 201 4 C 2 8 52 413+26.07-LM
13/09 R-2218 8.T521103 CHATHAM 29,133.34 CLV NHF 0.000 1 201 5 C 2 8 52 417+80.48-LM
13/10 R-2218 8.T521103 CHATHAM 34,796.44 CLV NHF 0.000 1 201 17 C 2 8 52 467+33.65-LM
PROJECT TOTAL = 9,937,161.09 BROWN & ROOT, INC.
15/01 R-2224 6.961021 JACKSON 1,072,517.18 RWY 1,469 0.730 2 0 0 LS U 4 14 96
PROJECT TOTAL = 1,072,517.18 PHILLIPS & JORDAN, INC
16/01 7.0371043 CHOWAN 69,384.12 SUR 63 1.100 2 0 0 S 1 1 3 MAPS 1-4
16/02 7.0821243 HYDE 56,694.53 SUR 25 2.250 2 0 0 S 1 1 8 MAPS 5-6
16/03 7.0911243 MARTIN 528,430.94 SUR 48 11.070 2 0 0 S 1 1 9 MAPS 7-14
16/04 7.0921243 MARTIN 73,676.79 SUR 25 2.900 2 0 0 S 1 1 9 MAPS 15-16
16/05 7.0974043 MARTIN 230,160.37 SUR 85 2.710 2 0 0 S 1 1 9 MAPS 17-22
16/06 7.1321243 TYRRELL 87,535.17 SUR 34 2.600 2 0 0 S 1 1 13 MAPS 23-24
16/07 7.1411243 WASHINGTN 532,821.96 SUR 31 17.100 2 0 0 S 1 1 14 MAPS 25-27
16/08 7.1421243 WASHINGTN 50,693.94 SUR 27 1.900 2 0 0 S 1 1 14 MAPS 28
16/09 7.1473243 WASHINGTN 13,387.09 SUR 33 0.400 2 0 0 S 1 1 14 MAPS 29-30
PROJECT TOTAL = 1,642,784.91 NELLO L. TEER COMPANY
17/01 E-3600 7.0511242 DARE 65,992.05 SUR STP 183 0.360 2 0 0 S 1 1 5 MAP 1
17/02 U-2651 7.0521242 DARE 138,443.60 SUR 31 4.450 2 0 0 S 1 1 5 MAPS 2-20
17/03 U-2651 7.0572642 DARE 2,079.80 SUR 35 0.060 2 0 0 S 1 1 5 MAPS 21
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 8
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
17/04 E-3600 8.2050901 DARE 690,782.15 SUR STP 95 7.300 2 0 0 S 1 1 5 MAPS 22-23
17/05 U-2651 9.8014824 DARE 10,589.00 SUR 30 0.350 2 0 0 S 1 1 5 MAPS 24-25
PROJECT TOTAL = 907,886.60 BARNHILL CONTRACTING C
18/01 7.0611241 GATES 849,583.06 SUR 41 20.900 2 0 0 S 1 1 6 MAPS 1-5
18/02 7.0621241 GATES 156,712.14 SUR 25 6.270 2 0 0 S 1 1 6 MAPS 6-8
18/03 7.1221241 PERQUIMAN 154,967.98 SUR 23 6.700 2 0 0 S 1 1 12 MAPS 9-11
18/04 7.1272041 PERQUIMAN 18,068.08 SUR 100 0.180 2 0 0 S 1 1 12 MAP 12
PROJECT TOTAL = 1,179,331.26 ROSE BROTHERS PAVING C
19/01 7.2411111 DUPLIN 1,252,722.70 SUR 111 11.250 2 0 0 S 1 3 24 MAPS 1-2
19/02 7.2421111 DUPLIN 628,263.50 SUR 50 12.600 2 0 0 S 1 3 24 MAPS 3-8
19/03 7.2470311 DUPLIN 66,693.75 SUR 74 0.900 2 0 0 S 1 3 24 MAPS 9-10
PROJECT TOTAL = 1,947,679.95 BARRUS CONSTRUCTION CO
20/01 7.2811111 SAMPSON 1,029,192.48 SUR 95 10.850 2 0 0 S 1 3 28 MAPS 11-13
20/02 7.2821111 SAMPSON 528,179.10 SUR 41 12.790 2 0 0 S 1 3 28 MAPS 14-20
20/03 7.2870211 SAMPSON 20,802.16 SUR 30 0.700 2 0 0 S 1 3 28 MAP 21
20/04 7.2870911 SAMPSON 53,323.64 SUR 46 1.150 2 0 0 S 1 3 28 MAPS 22-24
20/05 7.2871211 SAMPSON 64,365.88 SUR 64 1.000 2 0 0 S 1 3 28 MAPS 25
PROJECT TOTAL = 1,695,863.26 BARNHILL CONTRACTING C
24/01 7.2911184 EDGECOMBE 473,913.08 SUR 44 10.710 2 0 0 S 2 4 29 MAPS 1-4
24/02 7.2921184 EDGECOMBE 275,546.60 SUR 23 12.240 2 0 0 S 2 4 29 MAPS 5-8
24/03 7.2974184 EDGECOMBE 158,465.14 SUR 75 2.120 2 0 0 S 2 4 29 MAPS 9-12
24/04 7.3011185 HALIFAX 575,359.57 SUR 40 14.360 2 0 0 S 2 4 30 MAPS 1-5
24/05 7.3021185 HALIFAX 164,467.80 SUR 21 7.880 2 0 0 S 2 4 30 MAPS 6-9
24/06 7.3071585 HALIFAX 40,114.70 SUR 44 0.910 2 0 0 S 2 4 30 MAPS 10
24/07 7.3073085 HALIFAX 32,831.56 SUR 50 0.660 2 0 0 S 2 4 30 MAPS 11-14
24/08 7.3073385 HALIFAX 111,351.30 SUR 89 1.250 2 0 0 S 2 4 30 MAPS 15-20
24/09 7.3074285 HALIFAX 19,338.58 SUR 36 0.530 2 0 0 S 2 4 30 MAP 21
24/10 7.3211187 NASH 384,866.74 SUR 74 5.230 2 0 0 S 2 4 32 MAPS 1-2
24/11 7.3221187 NASH 246,826.40 SUR 22 11.480 2 0 0 S 2 4 32 MAPS 3-7
24/12 7.3270587 NASH 17,175.50 SUR 23 0.760 2 0 0 S 2 4 32 MAP 8
24/13 7.3272387 NASH 10,903.38 SUR 61 0.180 2 0 0 S 2 4 32 MAP 9
24/14 7.3273187 NASH 673,478.73 SUR 131 5.140 2 0 0 S 2 4 32 MAPS 10-15
24/15 7.3274387 NASH 31,737.83 SUR 88 0.360 2 0 0 S 2 4 32 MAP 16
PROJECT TOTAL = 3,216,376.91 BARNHILL CONTRACTING C
25/01 7.3111186 JOHNSTON 900,616.00 SUR 79 11.360 2 0 0 S 2 4 31 MAPS 1-3
25/02 7.3121186 JOHNSTON 633,967.25 SUR 29 21.710 2 0 0 S 2 4 31 MAPS 4-13
25/03 7.3170686 JOHNSTON 115,083.00 SUR 98 1.180 2 0 0 S 2 4 31 MAPS 14-19
PROJECT TOTAL = 1,649,666.25 S. T. WOOTEN CORPORATI
26/01 7.3311188 WAYNE 351,953.00 SUR 98 3.600 2 0 0 S 2 4 33 MAP 1
26/02 7.3321188 WAYNE 441,632.00 SUR 33 13.320 2 0 0 S 2 4 33 MAPS 2-8
26/03 7.3371388 WAYNE 23,641.00 SUR 39 0.610 2 0 0 S 2 4 33 MAP 9
26/04 7.3371488 WAYNE 408,996.00 SUR 113 3.630 2 0 0 S 2 4 33 MAPS 10-18
PROJECT TOTAL = 1,226,222.00 BARRUS CONSTRUCTION CO
27/01 7.3411189 WILSON 315,468.43 SUR 75 4.190 2 0 0 S 2 4 34 MAPS 1&10
27/02 7.3421189 WILSON 152,124.20 SUR 32 4.800 2 0 0 S 2 4 34 MAPS 2-4
27/03 7.3474089 WILSON 7,957.00 SUR 53 0.150 2 0 0 S 2 4 34 MAP 5
27/04 7.3474589 WILSON 292,948.10 SUR 76 3.850 2 0 0 S 2 4 34 MAPS 6-9
PROJECT TOTAL = 768,497.73 S. T. WOOTEN CORPORATI
29/01 5.3821156 PERSON 141,470.56 SUR 27 5.300 2 0 0 S 2 5 38 MAPS 1-2
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 9
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
29/02 6.382326 PERSON 86,538.76 SUR 38 2.300 2 0 0 S 2 5 38 MAPS 3
29/03 6.382035T PERSON 90,126.25 SUR 38 2.400 2 0 0 S 2 5 38 MAPS 4
29/04 7.3821179 PERSON 122,527.52 SUR 29 4.250 2 0 0 S 2 5 38 MAPS 5-8
29/05 7.3872279 PERSON 59,135.38 SUR 38 1.560 2 0 0 S 2 5 38 MAPS 9-10
PROJECT TOTAL = 499,798.47 THE SUNROCK CONST. COR
30/01 5.4011154 WAKE 101,805.62 SUR 57 1.800 2 0 0 S 2 5 40 MAPS 1-3
30/02 5.4021154 WAKE 164,685.82 SUR 35 4.700 2 0 0 S 2 5 40 MAPS 4-7
30/03 6.402481 WAKE 142,051.30 SUR 36 4.000 2 0 0 S 2 5 40 MAPS 8
30/04 7.3521176 DURHAM 13,941.36 SUR 35 0.400 2 0 0 S 2 5 35 MAPS 9
30/05 7.4011176 WAKE 132,136.64 SUR 120 1.100 2 0 0 S 2 5 40 MAPS 10
30/06 7.4021176 WAKE 2,716,594.38 SUR 34 79.300 2 0 0 S 2 5 40 MAPS 11-48
30/07 7.4070176 WAKE 37,813.82 SUR 47 0.800 2 0 0 S 2 5 40 MAPS 49
30/08 7.4070376 WAKE 312,904.71 SUR 68 4.600 2 0 0 S 2 5 40 MAPS 50-53
30/09 7.4070776 WAKE 14,704.36 SUR 37 0.400 2 0 0 S 2 5 40 MAPS 54
30/10 7.4072076 WAKE 309,401.14 SUR 69 4.500 2 0 0 S 2 5 40 MAPS 55-60
PROJECT TOTAL = 3,946,039.15 C. C. MANGUM, INC.
31/01 6.372363 GRANVILLE 171,024.00 SUR 39 4.400 2 0 0 S 2 5 37 MAPS 1-2
31/02 7.3711178 GRANVILLE 437,503.74 SUR 48 9.100 2 0 0 S 2 5 37 MAPS 3
31/03 7.3721178 GRANVILLE 205,916.00 SUR 24 8.500 2 0 0 S 2 5 37 MAPS 4-7
31/04 7.3771978 GRANVILLE 98,009.68 SUR 136 0.720 2 0 0 S 2 5 37 MAPS 8-11
31/05 7.3772378 GRANVILLE 21,535.00 SUR 36 0.600 2 0 0 S 2 5 37 MAPS 12-13
PROJECT TOTAL = 933,988.42 REA CONSTRUCTION COMPA
32/01 7.3511177 DURHAM 571,221.10 SUR 68 8.370 2 0 0 S 2 5 35 MAPS 1-5
32/02 7.3521177 DURHAM 922,092.94 SUR 39 23.840 2 0 0 S 2 5 35 MAPS 6-38
32/03 7.3570577 DURHAM 270,338.11 SUR 42 6.410 2 0 0 S 2 5 35 MAPS 39-45
32/04 7.4021177 WAKE 6,342.58 SUR 32 0.200 2 0 0 S 2 5 40 MAPS 46
PROJECT TOTAL = 1,769,994.73 C. C. MANGUM, INC.
33/01 7.3611180 FRANKLIN 226,969.18 SUR 32 7.200 2 0 0 L 2 5 36 MAPS 1
33/02 7.3621180 FRANKLIN 334,693.70 SUR 28 11.800 2 0 0 L 2 5 36 MAPS 2-7
33/03 7.3670680 FRANKLIN 55,874.96 SUR 42 1.330 2 0 0 L 2 5 36 MAPS 8-9
33/04 7.3671480 FRANKLIN 16,632.00 SUR 36 0.460 2 0 0 L 2 5 36 MAPS 10
PROJECT TOTAL = 634,169.84 C. C. MANGUM, INC.
35/01 7.3921175 VANCE 7,772.45 SUR 39 0.200 2 0 0 S 2 5 39 MAP 1
35/02 7.4111175 WARREN 117,001.39 SUR 33 3.600 2 0 0 S 2 5 41 MAP 2
35/03 7.4121175 WARREN 277,524.44 SUR 27 10.350 2 0 0 S 2 5 41 MAPS 3-10
PROJECT TOTAL = 402,298.28 NELLO L. TEER COMPANY
36/01 7.7911235 CATAWBA 330,920.37 SUR 40 8.200 2 0 0 S 2 12 79 MAP 1
36/02 7.7921235 CATAWBA 905,945.80 SUR 48 18.680 2 0 0 S 2 12 79 MAPS 2-22
36/03 7.7970835 CATAWBA 54,534.67 SUR 63 0.870 2 0 0 S 2 12 79 MAP 23
36/04 7.7971635 CATAWBA 631,931.63 SUR 155 4.070 2 0 0 S 2 12 79 MAPS 24-26
PROJECT TOTAL = 1,923,332.47 CENTRAL CAROLINA DIVIS
37/01 7.8111236 GASTON 37,108.50 SUR 93 0.400 2 0 0 S 2 12 81 MAP 1
37/02 7.8121236 GASTON 383,820.50 SUR 45 8.610 2 0 0 S 2 12 81 MAPS 2-10
37/03 7.8170136 GASTON 50,226.50 SUR 85 0.590 2 0 0 S 2 12 81 MAP 11
37/04 7.8170236 GASTON 50,319.00 SUR 45 1.130 2 0 0 S 2 12 81 MAP 12
37/05 7.8171036 GASTON 118,274.50 SUR 100 1.180 2 0 0 S 2 12 81 MAP 13
37/06 7.8171336 GASTON 202,030.50 SUR 97 2.080 2 0 0 S 2 12 81 MAPS 14-16
37/07 7.8173536 GASTON 39,944.00 SUR 37 1.070 2 0 0 S 2 12 81 MAP 17
PROJECT TOTAL = 881,723.50 ASPHALT PAVING OF SHEL
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 10
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
***** MAR 1997 TOTAL = $42,043,026.39
***** APR 1997 *****
07/01 U-3426 9.8100373 MECKLENBG 1,350,707.05 SUR 1,825 0.740 2 0 0 2 10 67
07/02 U-3426 9.8100373 MECKLENBG 135,395.00 RWY 0.000 0 0 0 2 10 67 CMUD COST
PROJECT TOTAL = 1,486,102.05 BLYTHE DEVELOPMENT COM
09/01 U-2538 8.1571003 RANDOLPH 6,310,116.65 RWY STP 2,128 2.965 5 638 0 S S U C 2 8 57
09/02 U-2538 8.1571003 RANDOLPH 880,954.50 RWY STP 0.000 0 0 0 S S U C 2 8 57 TOWN OF ARCH
09/03 U-2538 8.1571003 RANDOLPH 40,817.00 CLV STP 0.000 1 201 4 S S U C 2 8 57 51+90.74-L-
09/04 U-2538 8.1571003 RANDOLPH 100,861.00 CLV STP 0.000 1 1 3 S S U C 2 8 57 68+98-L-REV.
09/05 U-2538 8.1571003 RANDOLPH 236,533.00 CLV STP 0.006 1 3 8 S S U C 2 8 57 69+45-L-REV.
09/06 U-2538 8.1571003 RANDOLPH 6,650.00 RWY STP 0.000 0 0 0 S S U C 2 8 57 ARCHDALE COS
PROJECT TOTAL = 7,575,932.15 SANTARO INDUSTRIES, IN
10/01 R-2211 6.249003T DUPLIN 6,979,553.08 RWY 1,207 5.782 2 0 0 S 1 3 24
PROJECT TOTAL = 6,979,553.08 BARNHILL CONTRACTING C
11/01 7.4921193 GUILFORD 3,463.80 SUR 87 0.040 2 0 0 S 2 7 49 MAP 1
11/02 7.4970893 GUILFORD 556,513.47 SUR 103 5.400 2 0 0 S 2 7 49 MAPS 2-8
11/03 7.4971093 GUILFORD 654,078.46 SUR 207 3.160 2 0 0 S 2 7 49 MAPS 9-10
PROJECT TOTAL = 1,214,055.73 BLYTHE CONSTRUCTION, I
12/01 7.8911183 RUTHERFOR 1,777,756.24 SUR 228 7.790 2 0 0 S 3 13 89 MAP 1
PROJECT TOTAL = 1,777,756.24 ASPHALT PAVING OF SHEL
13/01 UM-255 5.6280011 FORSYTH 14,489.60 RWY 763 0.019 2 0 0 S B 2 9 62
13/02 UM-255 5.6280011 FORSYTH 136,754.00 BRG 0.054 4 396 11 S B 2 9 62 10+35.25-Y7
PROJECT TOTAL = 151,243.60 LANFORD BROTHERS COMPA
***** APR 1997 TOTAL = $19,184,642.85
***** MAY 1997 *****
12/01 I-2508 8.1370303 GRANVILLE 12,509,492.50 RWY IMF 1,230 10.170 2 614 0 S B 2 5 37
12/02 I-2508 8.1370303 GRANVILLE 33,607.00 BRG IMF 0.000 4 98 31 S B 2 5 37 64+02.04-LME
PROJECT TOTAL = 12,543,099.50 GILBERT SOUTHERN CORP.
13/01 R-2000 8.U401723 DURHAM 2,266,532.50 RWY STP 0.000 4 0 0 C 2 5 35
13/02 R-2000 8.U401723 DURHAM 101,796.00 CLV STP 0.000 1 101 14 C 2 5 35 285+39.00-L
PROJECT TOTAL = 2,368,328.50 ENGLISH CONSTRUCTION C
14/01 U-233 8.2370202 GRANVILLE 997,194.00 RWY STP 2,610 0.382 4 0 0 S W 2 5 37
14/02 U-233 8.2370202 GRANVILLE 158,471.75 RWY STP 0.000 0 0 0 S W 2 5 37 OXFORD COST
PROJECT TOTAL = 1,155,665.75 S. T. WOOTEN CORPORATI
15/01 5.4511173 HARNETT 18,056.52 SUR 15 1.240 2 0 0 S 2 6 45 MAP 1
15/02 7.4411124 CUMBERLAN 280,364.22 SUR 61 4.560 2 0 0 S 1 6 44 MAP 2
15/03 7.4421124 CUMBERLAN 1,011,214.92 SUR 49 20.830 2 0 0 S 1 6 44 MAP 3-40
15/04 7.4472024 CUMBERLAN 689,238.32 SUR 177 3.900 2 0 0 S 1 6 44 MAPS 41-45
15/05 7.4474324 CUMBERLAN 14,681.05 SUR 59 0.250 2 0 0 S 1 6 44 MAPS 46-47
15/06 7.4474424 CUMBERLAN 48,321.30 SUR 31 1.540 2 0 0 S 1 6 44 MAPS 48-49
15/07 7.4511124 HARNETT 603,276.12 SUR 57 10.600 2 0 0 S 2 6 45 MAPS 50-55
15/08 7.4521124 HARNETT 379,121.09 SUR 40 9.430 2 0 0 S 2 6 45 MAPS 56-70
15/09 7.4571324 HARNETT 14,116.95 SUR 43 0.330 2 0 0 S 2 6 45 MAPS 71
PROJECT TOTAL = 3,058,390.49 BARNHILL CONTRACTING C
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 11
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
16/01 7.4611123 ROBESON 488,265.25 SUR 41 11.850 2 0 0 S 1 6 46 MAPS 1-2
16/02 7.4621123 ROBESON 724,477.89 SUR 36 20.390 2 0 0 S 1 6 46 MAPS 3-10
16/03 7.4671823 ROBESON 28,840.90 SUR 46 0.630 2 0 0 S 1 6 46 MAP 11
16/04 7.4672723 ROBESON 87,865.40 SUR 58 1.520 2 0 0 S 1 6 46 MAPS 12-14
PROJECT TOTAL = 1,329,449.44 CROWELL CONSTRUCTORS,
17/01 7.4970895 GUILFORD 1,489,332.70 SUR 163 9.120 2 0 0 S 2 7 49 MAP 1
PROJECT TOTAL = 1,489,332.70 THOMPSON-ARTHUR PAVING
18/01 5.6021121 DAVIDSON 461,026.01 SUR 8 57.790 2 0 0 S 2 9 60 MAPS 1-153
18/02 5.6321121 ROWAN 356,355.20 SUR 7 48.770 2 0 0 S 2 9 63 MAPS 154-178
PROJECT TOTAL = 817,381.21 MOFFITT & PIERCE CONST
19/01 7.6011155 DAVIDSON 1,201,919.45 SUR 112 10.710 2 0 0 S 2 9 60 MAPS 1 3 6 8
19/02 7.6071155 DAVIDSON 263,821.95 SUR 122 2.160 2 0 0 S 2 9 60 MAPS 2 7
19/03 7.6071655 DAVIDSON 287,896.73 SUR 125 2.310 2 0 0 S 2 9 60 MAPS 4 5
PROJECT TOTAL = 1,753,638.13 LARCO CONST. CO., A DI
20/01 I-2401 6.679006T MECKLENBG 2,106,604.50 RWY 1,505 1.400 4 0 0 2 10 67
PROJECT TOTAL = 2,106,604.50 CROWDER CONSTRUCTION C
21/01 7.6611180 CABARRUS 298,625.64 SUR 63 4.710 2 0 0 S 2 10 66 MAPS 1-3
21/02 7.6621180 CABARRUS 497,070.59 SUR 93 5.360 2 0 0 S 2 10 66 MAPS 4-8
21/03 7.6670480 CABARRUS 28,699.99 SUR 99 0.290 2 0 0 S 2 10 66 MAPS 9
21/04 7.6673480 CABARRUS 133,539.63 SUR 60 2.240 2 0 0 S 2 10 66 MAPS 10-14
PROJECT TOTAL = 957,935.85 BOGGS PAVING, INC.
22/01 7.6721182 MECKLENBG 781,655.05 SUR 85 9.220 2 0 0 S 2 10 67 MAPS 1-6
22/02 7.6770382 MECKLENBG 566,184.76 SUR 93 6.090 2 0 0 S 2 10 67 MAPS 7-13
22/03 7.6770582 MECKLENBG 116,348.68 SUR 89 1.300 2 0 0 S 2 10 67 MAPS 14
22/04 7.6770782 MECKLENBG 160,609.30 SUR 96 1.680 2 0 0 S 2 10 67 MAPS 15
22/05 7.6771382 MECKLENBG 101,417.68 SUR 88 1.150 2 0 0 S 2 10 67 MAPS 16
PROJECT TOTAL = 1,726,215.47 BLYTHE CONSTRUCTION, I
23/01 7.6821181 STANLY 286,463.48 SUR 57 5.010 2 0 0 S 2 10 68 MAP 1
23/02 7.6871881 STANLY 18,078.48 SUR 90 0.200 2 0 0 S 2 10 68 MAP 2
23/03 7.6871981 STANLY 90,582.60 SUR 159 0.570 2 0 0 S 2 10 68 MAP 3
PROJECT TOTAL = 395,124.56 THE PAPCO GROUP, INC.
***** MAY 1997 TOTAL = $29,701,166.10
***** JUN 1997 *****
09/01 I-2305 8.1461404 ROBESON 14,412,461.75 RWY IMF 2,726 5.288 4 0 0 LSL C B 1 6 46
09/02 U-2415 8.1461602 ROBESON 8,113,188.95 RWY STP 6,189 1.311 4 0 0 LSL C B 1 6 46
09/03 I-2305 8.1461404 ROBESON 59,304.00 RWY IMF 0.000 0 0 0 LSL C B 1 6 46 LUMBERTON
09/04 U-2415 8.1461602 ROBESON 145,273.00 RWY STP 0.000 0 0 0 LSL C B 1 6 46 LUMBERTON
09/05 U-2415 8.1461602 ROBESON 97,082.80 CLV STP 0.004 1 202 3 LSL C B 1 6 46 332+52.00-L
09/06 I-2305 8.1461404 ROBESON 2,634,936.29 BRG IMF Q 0.072 8 836 15 LSL C B 1 6 46 243+46.10-L
09/07 U-2415 8.1461602 ROBESON 1,671,086.49 BRG STP I 0.051 4 890 11 LSL C B 1 6 46 317+04.58-L1
09/08 U-2415 8.1461602 ROBESON 2,118,722.98 BRG STP Q 0.067 5 899 15 LSL C B 1 6 46 29+62.00-L2
09/09 U-2415 8.1461602 ROBESON 1,624,559.17 BRG STP I 0.049 4 890 11 LSL C B 1 6 46 167+49.49-L1
PROJECT TOTAL = 30,876,615.43 W. C. ENGLISH, INC.
10/01 I-2511 8.1631505 ROWAN 19,345,221.94 RWY IMF 7,194 2.689 6 0 0 SLS U C B 2 9 63
10/02 I-2511 8.1631505 ROWAN 252,799.40 CLV IMF 0.000 1 200 7 SLS U C B 2 9 63 205+02.14-L-
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 12
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
10/03 I-2511 8.1631505 ROWAN 90,304.42 CLV IMF 0.000 1 201 17 SLS U C B 2 9 63 239+89.63-L-
10/04 I-2511 8.1631505 ROWAN 33,976.14 CLV IMF 0.000 1 201 8 SLS U C B 2 9 63 270+38.92-L-
10/05 I-2511 8.1631505 ROWAN 51,908.87 CLV IMF 0.000 1 201 11 SLS U C B 2 9 63 281+99.80-L-
10/06 I-2511 8.1631505 ROWAN 303,770.25 CLV IMF 0.000 1 200 23 SLS U C B 2 9 63 119+38.56-Y2
10/07 I-2511 8.1631505 ROWAN 230,426.71 CLV IMF 0.000 1 4 16 SLS U C B 2 9 63 114+38.00Y3R
10/08 I-2511 8.1631505 ROWAN 40,854.88 CLV IMF 0.000 1 1 8 SLS U C B 2 9 63 30+70.00-SRC
10/09 I-2511 8.1631505 ROWAN 632,864.33 BRG IMF I 0.000 4 647 11 SLS U C B 2 9 63 196+18.68-L-
10/10 I-2511 8.1631505 ROWAN 1,047,201.80 BRG IMF I 0.000 2 676 11 SLS U C B 2 9 63 256+02.00-L-
PROJECT TOTAL = 22,029,328.74 REA CONSTRUCTION COMPA
11/01 A-10 8.T842401 MADISON 198,230.00 MSC APD 0.000 2 0 0 4 13 86
PROJECT TOTAL = 198,230.00 TAYLOR & MURPHY CONSTR
12/01 W-3603 8.7316009 CARTERET 399,668.00 MSC STP 0.000 2 0 0 S 1 2 16
PROJECT TOTAL = 399,668.00 ALS OF NORTH CAROLINA,
13/01 R-2422 6.804797 WAYNE 57,500.00 RWY 55 1.053 2 0 0 2 4 33
PROJECT TOTAL = 57,500.00 REYNOLDS FENCE &
14/01 R-2123 6.678016T MECKLENBG 10,578,983.48 RWY 3,907 2.708 6 0 0 SLS C B 2 10 67
14/02 R-2123 6.678016T MECKLENBG 147,526.00 RWY 148 1.000 0 0 0 SLS C B 2 10 67 CMUD
14/03 R-2123 6.678016T MECKLENBG 291,222.96 CLV 0.005 1 3 25 SLS C B 2 10 67 999+88.00-L-
14/04 R-2123 6.678016T MECKLENBG 50,235.36 CLV 0.000 1 2 4 SLS C B 2 10 67 13+93.00Y2RE
14/05 R-2123 6.678016T MECKLENBG 412,107.57 BRG I 0.000 3 854 11 SLS C B 2 10 67 927+95.10 C/
14/06 R-2123 6.678016T MECKLENBG 554,974.86 BRG I 0.000 3 854 11 SLS C B 2 10 67 929+02.78-L-
14/07 R-2123 6.678016T MECKLENBG 729,253.60 BRG I 0.049 3 854 11 SLS C B 2 10 67 929+36.20-L-
14/08 R-2123 6.678016T MECKLENBG 736,810.71 BRG I 0.000 4 559 11 SLS C B 2 10 67 987+33.83-L-
14/09 R-2123 6.678016T MECKLENBG 1,036,220.37 BRG I 0.000 2 660 11 SLS C B 2 10 67 1021+48.00-L
PROJECT TOTAL = 14,537,334.91 MCWHIRTER GRADING COMP
15/01 P-3308 9.8091474 ROWAN 938,484.75 SUR 1,324 0.709 2 0 0 B 2 9 63
PROJECT TOTAL = 938,484.75 THE PAPCO GROUP, INC.
16/01 7.4211125 BLADEN 106,828.41 SUR 63 1.700 2 0 0 S 1 6 42 MAP 1
16/02 7.4221125 BLADEN 406,460.26 SUR 62 6.600 2 0 0 S 1 6 42 MAPS 2-3
16/03 7.4311125 COLUMBUS 439,631.98 SUR 41 10.700 2 0 0 S 1 6 43 MAPS 4-7
16/04 7.4321125 COLUMBUS 622,269.01 SUR 33 18.610 2 0 0 S 1 6 43 MAPS 8-20
16/05 7.4370525 COLUMBUS 16,486.76 SUR 55 0.300 2 0 0 S 1 6 43 MAPS 21
16/06 7.4371725 COLUMBUS 82,869.74 SUR 92 0.900 2 0 0 S 1 6 43 MAPS 22
16/07 7.4374125 COLUMBUS 68,165.69 SUR 68 1.000 2 0 0 S 1 6 43 MAPS 23
PROJECT TOTAL = 1,742,711.85 CROWELL CONSTRUCTORS,
17/01 7.4911194 GUILFORD 396,097.00 SUR 35 11.290 2 0 0 S 2 7 49 MAPS 1-6
17/02 7.4921194 GUILFORD 1,300,676.16 SUR 41 31.550 2 0 0 S 2 7 49 MAPS 7-25
17/03 7.4970894 GUILFORD 97,946.34 SUR 87 1.130 2 0 0 S 2 7 49 MAPS 26
17/04 7.4971094 GUILFORD 9,485.50 SUR 50 0.190 2 0 0 S 2 7 49 MAPS 27-28
17/05 7.4971294 GUILFORD 45,083.00 SUR 63 0.720 2 0 0 S 2 7 49 MAPS 29
17/06 7.4972994 GUILFORD 96,553.00 SUR 34 2.800 2 0 0 S 2 7 49 MAPS 30
17/07 7.4979994 GUILFORD 3,242.00 SUR 41 0.080 2 0 0 S 2 7 49 MAPS 31
PROJECT TOTAL = 1,949,083.00 THOMPSON-ARTHUR PAVING
18/01 7.6511183 ANSON 247,187.29 SUR 97 2.550 2 0 0 S 2 10 65 MAP 1
18/02 7.6521183 ANSON 327,885.45 SUR 40 8.190 2 0 0 S 2 10 65 MAPS 2 THUR
PROJECT TOTAL = 575,072.74 BOGGS PAVING, INC.
19/01 7.6911184 UNION 490,886.83 SUR 65 7.540 2 0 0 S 2 10 69 MAPS 1-4
19/02 7.6921184 UNION 1,026,771.35 SUR 60 17.180 2 0 0 S 2 10 69 MAPS 5-10
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 13
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
19/03 7.6971584 UNION 450,795.43 SUR 71 6.370 2 0 0 S 2 10 69 MAPS 11-13
PROJECT TOTAL = 1,968,453.61 BOGGS PAVING, INC.
***** JUN 1997 TOTAL = $75,272,483.03
***** JUL 1997 *****
16/01 K-3600 8.1951501 BUNCOMBE 915,396.39 MSC IMS 0.000 1 0 0 L 3 13 84
PROJECT TOTAL = 915,396.39 MCCARROL CONSTRUCTION,
17/01 F-3303 6.051031 HYDE 1,558,939.30 BRG A 0.025 0 98 0 B 1 1 8 SOUTH DOCK
17/02 F-3303 6.051031 DARE 391,655.70 BRG 0.000 0 98 0 B 1 1 5 NORTH DOCK
PROJECT TOTAL = 1,950,595.00 TIDEWATER CONSTRUCTION
18/01 7.0811231 HYDE 1,048,669.20 SUR 59 17.750 2 0 0 S 1 1 8
PROJECT TOTAL = 1,048,669.20 CAROLINA LANDSCAPING &
22/01 U-1267 9.8041477 WAYNE 650,022.25 RWY 2,289 0.284 2 614 0 UR 2 4 33 9+00 TO 24+0
22/02 U-1267 9.8041477 WAYNE 27,973.75 RWY 0.000 0 0 0 UR 2 4 33 GOLDSBORO CO
PROJECT TOTAL = 677,996.00 BARRUS CONSTRUCTION CO
23/01 7.2911190 EDGECOMBE 63,569.29 SUR 38 1.680 2 0 0 S 2 4 29
23/02 7.2972990 EDGECOMBE 17,182.95 SUR 30 0.580 2 0 0 S 2 4 29
PROJECT TOTAL = 80,752.24 BARNHILL CONTRACTING C
24/01 7.2973193 EDGECOMBE 122,826.40 SUR 67 1.840 2 0 0 S 2 4 29 MAPS 1-4
24/02 7.2974393 EDGECOMBE 6,704.70 SUR 48 0.140 2 0 0 S 2 4 29 MAP 5
24/03 7.3211193 NASH 136,185.95 SUR 73 1.860 2 0 0 S 2 4 32 MAPS 6-7
24/04 7.3221193 NASH 87,058.60 SUR 22 3.940 2 0 0 S 2 4 32 MAPS 8-9
PROJECT TOTAL = 352,775.65 BARNHILL CONTRACTING C
25/01 7.3011191 HALIFAX 87,065.20 SUR 36 2.440 2 0 0 S 2 4 30 MAPS 1
25/02 7.3073391 HALIFAX 42,500.82 SUR 73 0.580 2 0 0 S 2 4 30 MAPS 2-3
PROJECT TOTAL = 129,566.02 BARNHILL CONTRACTING C
26/01 7.3111192 JOHNSTON 59,613.00 SUR 52 1.140 2 0 0 S 2 4 31 MAP 1
26/02 7.3121192 JOHNSTON 160,952.00 SUR 189 0.850 2 0 0 S 2 4 31 MAP 2
26/03 7.3173792 JOHNSTON 121,206.00 SUR 60 2.020 2 0 0 S 2 4 31 MAPS 3-4
PROJECT TOTAL = 341,771.00 BARRUS CONSTRUCTION CO
27/01 7.3311194 WAYNE 125,138.00 SUR 114 1.100 2 0 0 S 2 4 33 MAP 1
27/02 7.3321194 WAYNE 23,063.50 SUR 35 0.660 2 0 0 S 2 4 33 MAPS 2-3
27/03 7.3371494 WAYNE 44,418.50 SUR 63 0.700 2 0 0 S 2 4 33 MAPS 4-5
PROJECT TOTAL = 192,620.00 BARRUS CONSTRUCTION CO
28/01 7.3421195 WILSON 118,525.20 SUR 25 4.740 2 0 0 S 2 4 34 MAPS 1-4
28/02 7.3474595 WILSON 111,726.65 SUR 51 2.180 2 0 0 S 2 4 34 MAPS 5-8
PROJECT TOTAL = 230,251.85 S. T. WOOTEN CORPORATI
29/01 R-2230 6.451008 HARNETT 3,084,002.70 RWY 1,087 2.836 2 0 0 U C 2 6 45
29/02 R-2230 6.451008 HARNETT 102,966.65 CLV 0.000 1 201 13 U C 2 6 45 242+12.00-L-
29/03 R-2230 6.451008 HARNETT 83,481.40 CLV 0.000 1 201 10 U C 2 6 45 288+31.00-L-
29/04 R-2230 6.451008 HARNETT 92,302.60 CLV 0.005 1 203 3 U C 2 6 45 353+90.00-L-
PROJECT TOTAL = 3,362,753.35 BARNHILL CONTRACTING C
***** JUL 1997 TOTAL = $9,283,146.70
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 14
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
***** AUG 1997 *****
15/01 W-3612 8.1792701 CATAWBA 607,558.50 RWY IMS 70 8.630 4 0 0 B 2 12 79
PROJECT TOTAL = 607,558.50 REYNOLDS FENCE &
19/01 R-2626 6.731018 CALDWELL 1,659,418.90 RWY 1,256 1.321 2 0 0 C 3 11 73
19/02 R-2626 6.731018 CALDWELL 11,678.50 RWY 0.000 0 0 0 C 3 11 73 CALDWELL UTI
19/03 R-2626 6.731018 CALDWELL 286,954.90 CLV 0.014 1 3 10 C 3 11 73 67+65.00 -L
PROJECT TOTAL = 1,958,052.30 DIXIE GRADING & EQUIPM
***** AUG 1997 TOTAL = $2,565,610.80
***** SEP 1997 *****
11/01 B-2577 8.2821101 IREDELL 186,520.25 RWY BRZ 880 0.212 2 0 0 L 2 12 82
11/02 B-2577 8.2821101 IREDELL 526,314.37 BRG BRZ Q 0.053 5 721 15 L 2 12 82 17+53.00-L-
PROJECT TOTAL = 712,834.62 R. E. BURNS & SONS CO.
12/01 5.9111063 CHEROKEE 49,922.93 SUR 54 0.920 2 0 0 S 4 14 91
12/02 5.9211063 CLAY 648,169.40 SUR 62 10.480 2 0 0 S 4 14 92
PROJECT TOTAL = 698,092.33 HARRISON CONST. CO., I
13/01 I-3800 6.401085 WAKE 4,191,355.35 RWY 706 5.935 6 0 0 2 5 40
PROJECT TOTAL = 4,191,355.35 C. C. MANGUM, INC.
***** SEP 1997 TOTAL = $5,602,282.30
***** OCT 1997 *****
05/01 I-3811 8.1391201 VANCE 668,693.10 RWY IMS 55 12.200 4 0 0 2 5 39
PROJECT TOTAL = 668,693.10 APEX CONTRACTING, INC.
06/01 I-3808 8.1851601 BURKE 654,101.43 RWY IMS 52 12.462 1 0 0 3 13 85
PROJECT TOTAL = 654,101.43 BAGWELL FENCE COMPANY,
07/01 I-3805 8.1443001 CUMBERLAN 916,270.15 RWY IMS 50 18.303 4 0 0 1 6 44
PROJECT TOTAL = 916,270.15 BAGWELL FENCE COMPANY,
08/01 W-3402 8.7344046 CUMBERLAN 769,350.38 MSC STP 0.000 2 0 0 S 1 6 44
PROJECT TOTAL = 769,350.38 FULCHER ELECTRIC
09/01 R-3305 6.231022 BRUNSWICK 2,861,687.13 SUR 222 12.880 2 0 0 S 1 3 23 MAPS 1-2
PROJECT TOTAL = 2,861,687.13 MAC CONSTRUCTION COMPA
10/01 7.4811199 CASWELL 811,852.89 SUR 67 12.180 2 0 0 S 2 7 48
10/02 7.4821199 CASWELL 219,399.49 SUR 21 10.420 2 0 0 S 2 7 48
10/03 7.4872599 CASWELL 19,810.48 SUR 28 0.700 2 0 0 S 2 7 48
10/04 7.5111199 ROCKINGHA 464,881.92 SUR 51 9.060 2 0 0 S 2 7 51
10/05 7.5121199 ROCKINGHA 65,739.32 SUR 37 1.770 2 0 0 S 2 7 51
PROJECT TOTAL = 1,581,684.10 THOMPSON'S, INC.
***** OCT 1997 TOTAL = $7,451,786.29
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 15
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
***** NOV 1997 *****
07/01 R-2000 8.U401725 WAKE 16,477,850.60 RWY NHF 6,235 2.643 6 694 0 L C 2 5 40
07/02 R-2000 8.U401725 WAKE 64,439.20 RWY NHF 64 1.000 1 0 0 L C 2 5 40 HEATER UTILI
07/03 R-2000 8.U401725 WAKE 84,801.34 CLV NHF 0.000 1 1 30 L C 2 5 40 677+18.00-L-
07/04 R-2000 8.U401725 WAKE 228,233.64 CLV NHF 0.000 1 1 38 L C 2 5 40 687+90.00-L-
07/05 R-2000 8.U401725 WAKE 73,445.58 CLV NHF 0.000 1 1 13 L C 2 5 40 41+49.00Y5RE
07/06 R-2000 8.U401725 WAKE 50,736.64 CLV NHF 0.000 1 2 2 L C 2 5 40 18+85.00Y4RE
07/07 R-2000 8.U401725 WAKE 390,045.50 CLV NHF 0.004 1 2 42 L C 2 5 40 780+63.00-L-
07/08 R-2000 8.U401725 WAKE 644,664.47 BRG NHF I 0.000 4 654 11 L C 2 5 40 691+32.80-L-
07/09 R-2000 8.U401725 WAKE 617,999.05 BRG NHF I 0.000 3 549 11 L C 2 5 40 770+37.59-L-
07/10 R-2000 8.U401725 WAKE 608,556.69 BRG NHF I 0.000 3 549 11 L C 2 5 40 770+27.37-L-
07/11 R-2000 8.U401725 WAKE 590,629.14 BRG NHF I 0.000 2 603 11 L C 2 5 40 809+52.24-L-
PROJECT TOTAL = 19,831,401.85 S. T. WOOTEN CORPORATI
08/01 I-3813 8.1463101 ROBESON 606,696.49 RWY IMS 35 17.518 4 0 0 1 6 46
PROJECT TOTAL = 606,696.49 REYNOLDS FENCE &
09/01 I-3809 8.1501701 DURHAM 265,521.00 RWY IMS 34 7.900 4 0 0 2 5 35
PROJECT TOTAL = 265,521.00 L. S. LEE, INC.
10/01 I-3810 8.1674301 ROWAN 989,055.00 RWY IMS 28 34.801 4 0 0 2 9 63
PROJECT TOTAL = 989,055.00 REYNOLDS FENCE &
11/01 B-2555 8.1622103 FORSYTH 7,153,819.60 RWY BRN 8,516 0.840 4 0 0 S CWB 2 9 62
11/02 B-2555 8.1622103 FORSYTH 180,955.00 ICH BRN 0.000 0 0 0 S CWB 2 9 62 WINSTON-SALE
11/03 B-2555 8.1622103 FORSYTH 262,666.50 CLV BRN 0.012 1 203 22 S CWB 2 9 62 69+34.76 -L-
11/04 B-2555 8.1622103 FORSYTH 290,000.00 WAL BRN 0.000 1 0 0 S CWB 2 9 62 27+63.92 -L-
11/05 B-2555 8.1622103 FORSYTH 390,000.00 WAL BRN 0.000 1 0 0 S CWB 2 9 62 47+35.04 -L-
11/06 B-2555 8.1622103 FORSYTH 2,167,890.86 BRG BRN Q 0.062 6 392 14 S CWB 2 9 62 27+63.92 -L-
11/07 B-2555 8.1622103 FORSYTH 7,574,145.00 BRG BRN Q 0.247 15 754 11 S CWB 2 9 62 47+35.04 -L-
11/08 B-2555 8.1622103 FORSYTH 905,402.44 BRG BRN D 0.024 3 398 11 S CWB 2 9 62 71+76.89 -L-
PROJECT TOTAL = 18,924,879.40 GILBERT SOUTHERN CORP.
12/01 B-2516 8.1842601 BUNCOMBE 327,295.75 RWY BRM 1,152 0.284 2 614 0 LS U C 3 13 84
12/02 B-2516 8.1842601 BUNCOMBE 152,610.84 CLV BRM 0.007 1 3 7 LS U C 3 13 84 17+74 -L-REV
PROJECT TOTAL = 479,906.59 ASHEVILLE DIVISION,
13/01 7.0611246 GATES 668,526.72 SUR 42 15.900 2 0 0 S 1 1 6 MAPS 1-2
13/02 7.0621246 GATES 151,981.50 SUR 25 6.100 2 0 0 S 1 1 6 MAPS 3-4
13/03 7.1221246 PERQUIMAN 93,071.00 SUR 25 3.700 2 0 0 S 1 1 12 MAPS 5-6
PROJECT TOTAL = 913,579.22 ROSE BROTHERS PAVING C
***** NOV 1997 TOTAL = $42,011,039.55
***** DEC 1997 *****
07/01 A-10D 8.T860704 MADISON 36,164,818.50 RWY STP 13,621 2.655 4 284 0 L C B 4 13 86
07/02 A-10D 8.T860704 MADISON 61,395.46 CLV STP 0.000 1 1 9 L C B 4 13 86 1538+00.00-L
07/03 A-10D 8.T860704 MADISON 425,750.00 WAL STP 0.000 1 0 0 L C B 4 13 86 1434+34.31-L
07/04 A-10D 8.T860704 MADISON 10,836,065.40 BRG STP Q 0.188 5 690 16 L C B 4 13 86 1434+34.31-L
07/05 A-10D 8.T860704 MADISON 1,070,184.86 BRG STP I 0.029 3 854 11 L C B 4 13 86 1575+64.37-L
PROJECT TOTAL = 48,558,214.22 WRIGHT BROTHERS CONST.
08/01 W-3418 8.7331009 JOHNSTON 558,236.99 RWY STP 560 0.997 2 0 0 2 4 31 12+35 - 65+
PROJECT TOTAL = 558,236.99 S. T. WOOTEN CORPORATI
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 16
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
09/01 R-3306 6.231028 BRUNSWICK 1,126,855.85 SUR 215 5.240 1 0 0 S 1 3 23 MAPS 1-3
09/02 R-3306 7.2321115 BRUNSWICK 615,997.00 SUR 36 17.070 1 0 0 S 1 3 23 MAPS 4-9
PROJECT TOTAL = 1,742,852.85 BARRUS CONSTRUCTION CO
10/01 R-2405 6.279002T PENDER 11,911,446.35 RWY 1,321 9.015 3 0 0 SLS U C 1 3 27
10/02 R-2405 6.279002T PENDER 58,628.15 CLV 0.000 1 202 3 SLS U C 1 3 27 878+43.73-L-
10/03 R-2405 6.279002T PENDER 44,386.65 CLV 0.000 1 201 3 SLS U C 1 3 27 975+48.62-L-
10/04 R-2405 6.279002T PENDER 58,432.00 CLV 0.000 1 201 2 SLS U C 1 3 27 1014+97.57-L
10/05 R-2405 6.279002T ONSLOW 107,661.35 CLV 0.000 1 1 4 SLS U C 1 3 26 1215+20.00-L
10/06 R-2405 6.279002T ONSLOW 13,542.25 CLV 0.000 1 201 4 SLS U C 1 3 26 111+63.80LRE
PROJECT TOTAL = 12,194,096.75 PLT CONSTRUCTION CO.,
11/01 R-3806 6.804829 DUPLIN 430,084.41 SUR 130 3.300 1 0 0 S 1 3 24 MAP 1
11/02 R-3806 7.2411116 DUPLIN 1,062,969.39 SUR 114 9.300 1 0 0 S 1 3 24 MAPS 2-4
11/03 R-3806 7.2421116 DUPLIN 665,367.18 SUR 33 20.350 1 0 0 S 1 3 24 MAPS 5-13
11/04 R-3806 7.2472916 DUPLIN 590,138.00 SUR 257 2.300 1 0 0 S 1 3 24 MAP 14
PROJECT TOTAL = 2,748,558.98 BARNHILL CONTRACTING C
12/01 U-3824 7.2521117 NEW HANOV 492,446.00 SUR 49 10.090 2 0 0 1 3 25 MAPS 3-13
12/02 U-3824 7.2573217 NEW HANOV 496,909.00 SUR 248 2.000 2 0 0 1 3 25 MAPS 14-15
12/03 U-3824 7.2573317 NEW HANOV 50,097.50 SUR 63 0.800 2 0 0 1 3 25 AMP 16
12/04 U-3824 7.2621117 ONSLOW 503,942.25 SUR 36 14.110 2 0 0 1 3 26 MAPS 17-22
12/05 U-3824 7.2721117 PENDER 647,816.75 SUR 55 11.800 2 0 0 1 3 27 MAPS 23-26
12/06 U-3824 7.2770617 PENDER 84,724.25 SUR 83 1.020 2 0 0 1 3 27 MAPS 27-28
12/07 U-3824 9.8039079 NEW HANOV 862,803.35 SUR 203 4.250 2 0 0 1 3 25 AMSP 1-2
PROJECT TOTAL = 3,138,739.10 BARRUS CONSTRUCTION CO
13/01 7.2811118 SAMPSON 766,332.58 SUR 95 8.100 1 0 0 S 1 3 28 MAPS 1
13/02 7.2821118 SAMPSON 780,182.48 SUR 38 20.620 1 0 0 S 1 3 28 MAPS 2-11
13/03 7.2870918 SAMPSON 69,571.92 SUR 107 0.650 1 0 0 S 1 3 28 MAPS 12
PROJECT TOTAL = 1,616,086.98 BARNHILL CONTRACTING C
***** DEC 1997 TOTAL = $70,556,785.87
GRAND TOTAL =$408,684,051.15
COST/PROJECT MILE = $157,482.36 TOTAL PROJECT MILES = 2595.110
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 17
AVERAGE UNIT BIDS
DATE 9701-9712
COMPLETE FILE FOR THIS PERIOD
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
1 MOBILIZATION LS 128 125,768.60 16,098,380.88
2 CONSTRUCTION SURVEYING LS 9 236,984.86 2,132,863.72
5 CLEARING & GRUBBING LS 617.24 8,832.91 5,452,077.82
6 SUPP CLEARING & GRUBBING ACR 54 2,963.37 160,022.30
10 SEALING ABANDONED WELLS EA 63 757.83 47,743.55
13 UNCLASSIFIED EXCAVATION CY 31,103,206 1.08 33,528,468.40
14 UNCLASSIFIED EXCAV (PQ) CY 8,150 20.00 163,000.00
26 REINF BRG APR FILL ****** LS 6 15,166.67 91,000.00
19 UNDERCUT EXCAVATION CY 1,362,862 2.87 3,911,042.60
11 GRADING LS 8 70,034.37 560,275.00
8 SUPP CLEARING & GRUBBING ACR 9 1,129.78 10,168.00
9 UNDERCUT EXCAVATION CY 3,100 7.20 22,325.00
21 SELECT GRANULAR MATERIAL CY 196,300 7.58 1,488,780.00
22 SOIL STABILIZATION FABRIC SY 109,650 1.85 203,470.00
28 BORROW EXCAVATION CY 2,016,570 5.44 10,967,080.15
31 BENCHING EXCAV FOR EMBKMT CY 166,550 2.32 386,396.00
32 EMBM'T SETTLEMENT GAUGE EA 2 500.00 1,000.00
34 DRAINAGE DITCH EXCAVATION CY 79,397 4.27 338,877.90
39 BERM DITCH CONSTRUCTION LF 13,640 2.08 28,400.70
38 PIPE CLEAN-OUT LF 1,503 10.08 15,147.50
47 REMOVAL OF ASPHALT PVMT SY 417,225 2.66 1,108,480.75
49 REMOVAL OF CONC PVMT SY 106,565 5.57 593,412.50
50 PROOF ROLLING HR 249 142.55 35,494.85
51 TEMPORARY SHORING SF 36,300 13.59 493,210.00
63 SELECT MATERIAL CL II TON 13,535 11.53 156,063.75
64 SELECT MATERIAL CL III TON 2,670 11.00 29,370.00
66 SELECT MATERIAL CL IV TON 42,200 11.00 464,200.00
59 FNDATION MATL, MINOR STRS TON 27,707 17.63 488,479.42
65 BEDDING MATL, PIPE CULV TON 27,757 17.08 474,040.61
76 15" PLAIN CONC PIPE CULV LF 4,356 19.33 84,200.80
77 18" PLAIN CONC PIPE CULV LF 1,368 24.39 33,371.40
78 24" PLAIN CONC PIPE CULV LF 156 31.37 4,894.00
85 15" PARLL PIPE RC END SEC EA 98 404.08 39,600.00
86 18" PARLL PIPE RC END SEC EA 5 510.00 2,550.00
87 24" PARLL PIPE RC END SEC EA 2 750.00 1,500.00
103 15"PARLL PIPE PF STL END EA 5 156.44 782.20
104 18"PARLL PIPE PF STL END EA 1 205.39 205.39
88 12" RC PIPE CULV III LF 12,764 20.15 257,268.68
89 15" RC PIPE CULV III LF 99,266 20.56 2,040,554.08
90 18" RC PIPE CULV III LF 40,559 23.38 948,456.72
91 24" RC PIPE CULV III LF 30,962 27.55 852,926.28
92 30" RC PIPE CULV III LF 21,552 34.37 740,711.88
93 36" RC PIPE CULV III LF 12,790 44.95 574,913.76
94 42" RC PIPE CULV III LF 3,464 63.11 218,602.80
95 48" RC PIPE CULV III LF 3,240 73.49 238,100.80
96 54" RC PIPE CULV III LF 320 97.37 31,160.00
97 60" RC PIPE CULV III LF 570 100.77 57,439.44
98 66" RC PIPE CULV III LF 160 120.00 19,200.00
99 72" RC PIPE CULV III LF 468 149.31 69,879.60
101 84" RC PIPE CULV III LF 120 175.00 21,000.00
114 18" RC PIPE CULV IV LF 320 23.60 7,552.00
116 30" RC PIPE CULV IV LF 476 39.62 18,860.00
117 36" RC PIPE CULV IV LF 996 47.00 46,812.00
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 18
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
118 42" RC PIPE CULV IV LF 260 64.46 16,760.00
119 48" RC PIPE CULV IV LF 364 78.71 28,652.00
120 54" RC PIPE CULV IV LF 100 110.00 11,000.00
122 66" RC PIPE CULV IV LF 316 152.00 48,032.00
153 15" RC FES EA 5 400.00 2,000.00
154 18" RC FES EA 2 500.00 1,000.00
155 24" RC FES EA 2 500.00 1,000.00
156 30" RC FES EA 1 700.00 700.00
157 36" RC FES EA 1 1,000.00 1,000.00
167 18" X PIPE RC END SECTION EA 7 350.00 2,450.00
168 24" X PIPE RC END SECTION EA 1 475.00 475.00
169 30" X PIPE RC END SECTION EA 2 660.00 1,320.00
173 60X36" RCP TAPERED INLET EA 3 1,950.00 5,850.00
175 72X48" RCP TAPERED INLET EA 1 2,500.00 2,500.00
178 90X66" RCP TAPERED INLET EA 1 4,000.00 4,000.00
195 **X**X**" RCP TEE III EA 1 375.00 375.00
196 15X**X**" RCP TEE III EA 4 495.00 1,980.00
197 15X15X15" RCP TEE III EA 4 415.00 1,660.00
198 18X**X**" RCP TEE III EA 1 400.00 400.00
199 18X18X18" RCP TEE III EA 1 430.00 430.00
200 24X**X**" RCP TEE III EA 5 502.00 2,510.00
202 30X**X**" RCP TEE III EA 1 650.00 650.00
218 15" RC PIPE ELBOW III EA 6 312.50 1,875.00
219 18" RC PIPE ELBOW III EA 3 275.00 825.00
234 6" CS PIPE 0.064" SPR BOX LF 354 11.71 4,145.40
239 **" CS PIPE CULV *****" LF 1,522 63.65 96,876.60
240 15" CS PIPE CULV 0.064" LF 4,260 17.88 76,169.88
241 18" CS PIPE CULV 0.064" LF 796 21.81 17,363.40
242 24" CS PIPE CULV 0.064" LF 528 23.29 12,299.68
243 30" CS PIPE CULV 0.079" LF 144 32.39 4,664.00
246 15" CS FES 0.064" THICK EA 28 326.36 9,138.08
247 18" CS FES 0.064" THICK EA 7 354.59 2,482.13
248 24" CS FES 0.064" THICK EA 1 411.01 411.01
236 18" X PIPE PF STL N SECT EA 1 181.50 181.50
262 **" CS ELBOW *****" THICK EA 2 1,110.00 2,220.00
265 24" CS ELBOW 0.064" THICK EA 2 210.00 420.00
283 15" BCCSP A 0.064" LF 492 18.27 8,988.00
284 18" BCCSP A 0.064" LF 88 23.91 2,104.00
285 24" BCCSP A 0.064" LF 32 24.00 768.00
297 **" BCCSP B *****" LF 1,512 18.26 27,613.60
303 15" BCCSP B 0.064" LF 4,628 20.85 96,489.28
305 15" BCCSP B 0.109" LF 100 19.00 1,900.00
307 18" BCCSP B 0.064" LF 1,548 22.13 34,259.28
308 18" BCCSP B 0.079" LF 152 21.00 3,192.00
311 24" BCCSP B 0.064" LF 1,522 27.00 41,088.96
316 30" BCCSP B 0.079" LF 480 33.02 15,852.00
318 30" BCCSP B 0.138" LF 400 44.00 17,600.00
321 36" BCCSP B 0.079" LF 700 41.79 29,256.00
331 36" BCCSP B 0.168" 3X1" LF 604 60.00 36,240.00
332 36" BCCSP B 0.168" 3X1"EL LF 2,700 92.00 248,400.00
345 42" BCCSP B 0.168" 3X1"EL LF 784 100.00 78,400.00
347 48" BCCSP B 0.109" LF 36 82.40 2,966.40
440 **" BCCS ELB B *****" EA 60 124.70 7,482.00
441 15" BCCS ELB B 0.064" EA 117 134.09 15,688.48
442 18" BCCS ELB B 0.064" EA 37 134.88 4,990.71
443 24" BCCS ELB B 0.064" EA 23 210.49 4,841.24
445 30" BCCS ELB B 0.079" EA 5 254.00 1,270.00
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 19
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
485 **X**"BCCSP ARCH A *****" LF 54 140.00 7,560.00
486 1**X**"BCCSP ARCH A ***** LF 16 153.26 2,452.16
1048 6" SLOPE PROTECTION SY 985 44.47 43,805.00
552 FINE GRADING LS 24 122,974.53 2,951,388.66
553 SEALING PVMT CRACKS LB 18,450 3.60 66,512.50
545 LIME TRTD SOIL (SLURRY) SY 388,235 1.38 534,779.55
546 LIME TRTD SOIL(QUICKLIME) SY 99,200 1.66 164,950.00
548 LIME FOR LIME TREATD SOIL TON 4,929 123.13 606,893.90
549 #57 STONE TON 250 12.00 3,000.00
554 STABILIZER AGGREGATE TON 6,720 17.85 119,933.00
556 AGGREGATE BASE COURSE TON 595,885 13.08 7,794,049.50
574 **" SOIL CEMENT BASE SY 237,674 1.47 349,820.05
575 PC FOR SOIL CEMENT BASE TON 6,866 104.05 714,433.20
570 AGGREGATE FOR SOIL CEM BS TON 16,856 9.25 155,892.95
576 ASPHALT CURING SEAL GAL 154,985 1.26 195,258.20
580 INCIDENTAL STONE BASE TON 75,695.08 17.97 1,359,952.82
583 SHOULDER BORROW CY 68,937 2.48 170,692.55
585 SHOULDER CONSTRUCTION MLF 2,729.36 590.63 1,612,054.10
589 PRIME COAT GAL 123,753 0.97 120,757.35
586 MILLING BIT PAVEMENT ** SY 909,753 1.10 1,002,232.20
584 MILLN BIT PVMT ** - ** SY 445,555 2.41 1,073,752.67
577 MILL ASPH PVMT **-1/4" SY 558,440 0.27 151,240.20
581 MILL ASPH PVMT **-1/2" SY 199,226 1.81 360,693.77
579 MILL ASPH PVMT ** -**-1/2 SY 99,627 1.65 164,918.45
571 MILL ASPH PVMT**.5 -**.5 SY 5,331 1.90 10,128.90
582 MILL ASPH PVMT **-1/2"-** SY 105,077 1.71 180,185.90
594 INCIDENTAL MILLING SY 23,787 5.42 129,011.25
591 QMS ASPH PL MIX PAVEMENTS TON 340 2.20 748.00
593 ASPHALT CEMENT TON 234,317 163.21 38,243,545.82
595 NON-STRIP ADDITIVE LB 190 1.65 313.50
597 ASPH CONC BASE CO, HB TON 773,298 26.19 20,254,612.87
600 SAND ASPH SURF CO, F1 TON 908 24.35 22,109.80
601 ASPH CONC BINDER CO, HDB TON 558,750 25.95 14,498,697.82
602 ASPH CONC BINDER CO, H TON 140,419 27.84 3,908,736.35
603 ASPH CONC SURF I-1, LEVLN TON 36,304 21.69 787,495.55
604 ASPH CONC SURFACE CO, I-1 TON 759,360 23.53 17,869,492.61
606 ASPH CONC SURF I-2, LEVLN TON 7,705 30.78 237,187.45
605 ASPH CONC SURFACE CO, I-2 TON 994,275 23.75 23,613,404.46
608 ASPH CONC SURF CO, HDS TON 965,154 24.62 23,767,336.03
609 ASPH DRAINAGE CO, #78M TON 23,200 25.00 580,000.00
611 ASPH PM PAVEMENT REPAIR TON 10,195 90.50 922,683.50
612 PATCHING EXIST PAVEMENT TON 38,207 81.57 3,116,538.25
615 AST, MAT & SEAL SY 10,158 3.00 30,474.00
619 AST, MAT COAT, #6 STONE SY 776,934 0.91 706,285.32
622 AST, SPLIT SEAL SY 1,163,758 0.68 794,381.21
631 AST, TRIPLE SEAL SY 1,696,844 0.94 1,602,390.73
657 9"PCC PVMT, MISC SY 303.45 147.00 44,607.15
682 SURF TEST CONC PAVEMENT LS 2 37,500.00 75,000.00
679 CONC SHLDRS ADJ **"PVMT SY 58,700 27.00 1,584,900.00
683 LAB RENTAL PORT CEMENT LS 2 50,000.00 100,000.00
685 RIGHT OF WAY MARKERS EA 830 92.59 76,848.25
687 PIPE REMOVAL LF 38,022 8.08 307,215.64
690 SUBDRAIN EXCAVATION CY 15,067 6.86 103,408.30
691 SUBDRAIN FINE AGGREGATE CY 8,276 26.25 217,229.30
692 4" PERF SUBDRN PIPE LF 760 3.00 2,280.00
693 4" SUBDRN Y,T,OR L EA 21 3.00 63.00
694 6" PERF SUBDRN PIPE LF 48,360 3.40 164,628.00
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 20
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
695 6" SUBDRN Y,T,OR L EA 1,450 12.74 18,467.75
698 CONC PAD SUBDRN OUTLET EA 99 207.94 20,586.02
699 4" OUTLET PIPE (SUBDRNS) LF 6 9.50 57.00
707 6" OUTLET PIPE (SUBDRNS) LF 598 9.52 5,690.82
701 **"GEOCOMPSTE SHLD DRAINS LF 1,850 6.50 12,025.00
702 SHOULDER DRAIN LF 157,619 2.80 441,560.00
703 4" SHOULDER DRAIN PIPE LF 157,619 1.27 199,931.25
706 4" OUTLET PIPE (SH DRNS) LF 9,020 5.40 48,720.50
704 CONC PAD SHLDR DRN OUTLET EA 291 123.90 36,054.80
705 BLOTTING SAND TON 1,760.50 1.63 2,872.97
708 METAL FUNNELS EA 112 488.20 54,678.41
710 12"FUNNEL DRAIN PIPE LF 4,686 14.79 69,330.84
713 12"FUNNEL DRAIN ELBOWS EA 153 110.79 16,951.12
715 SAND CEMENT HEADWALLS SF 975 17.98 17,530.00
716 CONC ENDWALLS CL A CY 141.10 652.94 92,130.00
717 CONC ENDWALLS CL B CY 261.30 641.97 167,746.74
719 BRICK MASONRY ENDWALLS CY 102.91 623.07 64,120.50
721 REINF BRICK MASRY ENDWALL CY 18.70 509.52 9,528.00
722 REINF STEEL, ENDWALLS LB 10,845 1.23 13,402.95
724 PIPE COLLARS CY 148.10 650.60 96,353.70
726 PIPE PLUGS CY 102.06 383.65 39,155.44
732 MASNRY DRAINAGE STRUCT EA 2,329 965.09 2,247,704.13
733 MASNRY DRAINAGE STRUCT CY 4 600.00 2,400.00
734 MASNRY DRAINAGE STRUCT LF 937.24 201.05 188,429.14
744 FRAME W/GRATE 840.***** EA 22 238.17 5,239.80
746 FRAME W/2GRTS 840.***** EA 7 210.00 1,470.00
748 FRAME-GRT-HD 840.03 ** EA 801 327.84 262,597.80
752 FRAME W/GRATE 840.13 EA 15 226.00 3,390.00
754 FRAME W/2GRTS 840.16 EA 241 315.69 76,082.00
755 FRAME W/GRATE 840.20 EA 35 400.00 14,000.00
757 FRAME W/2GRTS 840.20 EA 58 282.42 16,380.50
758 FRAME W/2GRTS 840.22 EA 477 287.46 137,120.92
762 FRAME W/2GRTS 840.24 EA 251 269.92 67,749.50
763 FRAME W/GRATE 840.29 EA 1 145.20 145.20
765 FRAME W/2GRTS 840.29 EA 9 207.22 1,865.00
759 FRAME W/2GRTS 840.33 EA 11 303.64 3,340.00
769 FRAME W/2GRTS 840.36 EA 104 259.64 27,002.50
764 FRAME W/COVER 840.54 EA 69 284.36 19,621.11
735 CONC APRON FOR CATCHBASIN EA 79 311.44 24,603.50
736 CONC APRON FOR DROP INLET EA 24 380.67 9,136.00
771 **" SLUICE GATE EA 3 2,571.00 7,713.00
772 CONCRETE RETAINING WALLS CY 212 425.04 90,107.70
778 CONCRETE STEPS CY 1.37 918.75 1,258.69
785 **"X**" CONCRETE CURB LF 6,961 15.66 109,002.00
788 1'-6"CONC CURB & GUTTER LF 44,530 8.10 360,534.00
789 2'-6"CONC CURB & GUTTER LF 195,809 10.35 2,026,344.15
790 SHOULDER BERM GUTTER LF 43,662 9.36 408,848.90
795 CONCRETE FLUME EA 1 1,740.00 1,740.00
797 MODIFIED CONCRETE FLUME EA 13 1,650.77 21,460.00
796 CONC EXPRESSWAY GUTTER LF 13,850 11.55 159,942.00
800 4" CONCRETE SIDEWALK SY 15,310.45 27.51 421,178.33
802 CONCRETE WHEELCHAIR RAMP SY 4,341.45 38.04 165,164.42
803 WHEELCHAIR RAMP EA 502 1,228.59 616,755.00
804 6" CONCRETE DRIVEWAY SY 10,399 39.18 407,490.75
806 4" CONCRETE PAVED DITCH SY 2,661 34.29 91,255.40
809 3" CONC ISLAND COVERS SY 630 20.00 12,600.00
818 5" MONO CONC ISLANDS SY 7,953 32.57 259,045.75
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 21
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
820 6" MONO CONC ISLANDS SY 4,251 36.99 157,230.00
831 **" CONC GLARE SCREEN LF 25,820 10.00 258,200.00
838 CONC BARRIER LF 4,050 30.00 121,500.00
839 CONC BARRIER TRANS SECTN EA 8 3,125.00 25,000.00
842 PC REINF BARRIER SNGL FC LF 2,760 47.28 130,500.00
844 ADJ CATCH BASINS EA 195 405.90 79,150.00
847 ADJ DROP INLETS EA 118 279.43 32,972.40
850 ADJ MANHOLES EA 1,996 268.38 535,685.83
853 ADJ METER OR VALVE BOXES EA 1,628 227.53 370,418.16
856 CONVERT CB TO JB EA 17 1,000.00 17,000.00
859 CONVERT CB TO DI EA 4 877.50 3,510.00
862 CONVERT DI TO JB EA 13 678.45 8,819.80
773 CONVERT DI TO CB EA 3 500.00 1,500.00
863 CONVERT JB TO DI EA 3 1,276.87 3,830.61
899 STL BM GUARDRAIL LF 184,156.50 10.24 1,886,455.02
902 SBGR SHOP CURVED LF 1,625 12.14 19,731.50
905 SBGR DOUBLE FACED LF 15,925 14.08 224,200.00
908 TRIPLE CORRUGATED SBGR LF 25 25.00 625.00
890 SBGR TERM SECT EA 71 38.28 2,718.00
910 20"TUBULAR 3C GUARDRAIL LF 50 70.00 3,500.00
911 W-TR SBGR TRANS SECTIONS EA 10 270.00 2,700.00
959 ADDIT GUARDRAIL POSTS EA 795 38.78 30,832.75
917 GR ANCHOR TYPE ********** EA 38 2,136.84 81,200.00
920 GR ANCHOR TYPE ********** EA 28 819.28 22,939.80
921 GDRAIL ANCH UNT (ET-2000) EA 7 2,600.00 18,200.00
935 GR ANCHOR TYPE AT-1 EA 18 369.37 6,648.60
947 GR ANCHOR TYPE CAT-1 EA 216 571.35 123,411.80
948 GR ANCHOR TYPE MELT EA 342 1,048.08 358,443.33
923 GR ANCHOR TYPE VI EA 2 1,000.00 2,000.00
924 GR ANCHOR TYPE VI (MOD) EA 9 1,160.00 10,440.00
934 GR ANCHOR TYPE XI EA 89 1,045.41 93,041.40
936 GR ANCHOR TYPE XI (MOD) EA 13 1,103.85 14,350.00
931 GR ANCHOR TYPE XIII EA 25 440.00 11,000.00
875 REMOVE & RESET GUARDRAIL LF 1,650 6.27 10,346.25
878 REMOVE EXISTING GUARDRAIL LF 66,866.50 1.17 78,068.50
881 REMVE & STKPILE GUARDRAIL LF 7,055 1.14 8,031.00
967 WOVEN WIRE FENCE **" FAB LF 29,750 1.40 41,650.00
969 WOVEN WIRE FENCE 47" FAB LF 104,402 2.25 235,093.75
972 4" TIMBER POSTS *****LONG EA 1,211 16.00 19,376.00
975 4" TIMBER POSTS 7'-6"LONG EA 8,539 16.94 144,686.80
978 5" TIMBER POSTS *****LONG EA 310 32.50 10,075.00
981 5" TIMBER POSTS 8'-0"LONG EA 1,910 32.86 62,759.00
999 CL FEN **" FAB W/TOP TEN LF 9,625 3.35 32,240.00
1002 CL FEN 48" FAB W/TOP TEN LF 21,360 2.45 52,334.00
1005 MET LINE PST **" CL FEN EA 848 28.10 23,829.80
1008 MET LINE PST 48" CL FEN EA 1,797 25.05 45,014.00
1011 MET TERM PST **" CL FEN EA 58 101.06 5,861.60
1014 MET TERM PST 48" CL FEN EA 170 93.09 15,825.00
1018 MET GATE PST **" CL FEN D EA 4 105.00 420.00
1021 ADDITIONAL BARBED WIRE LF 5,195 0.74 3,831.00
1026 ** STRAND BW FENCE W/POST LF 18,435 2.53 46,584.75
1029 TEMP **" WW FENCE W/POSTS LF 7,750 3.00 23,250.00
1034 BARBED WIRE FENCE RESET LF 350 9.57 3,350.00
1036 CHAIN LINK FENCE RESET LF 1,057 13.07 13,816.00
1043 PLAIN RIP RAP, CLASS I SY 1,192 30.99 36,944.00
1045 PLAIN RIP RAP, CLASS I TON 32,055 16.43 526,749.00
1046 PLAIN RIP RAP, CLASS II TON 4,407 20.62 90,895.50
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 22
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
1060 PLAIN RIP RAP, CLASS A TON 1,031 29.98 30,908.50
1061 PLAIN RIP RAP, CLASS B TON 24,162 25.90 625,838.50
33 FILTER FABRIC FOR DRAINGE SY 108,825 1.77 192,991.75
1106 DEMOLIT OF BLDG'S ITEM ** LS 17 331.41 5,634.00
1107 BLDG REMOVAL ITEM ** LS 332 2.22 737.00
1669 TYPE A SIGNS, FABRICATION SF 1,810 25.85 46,788.50
1670 TYPE B SIGNS, FABRICATION SF 330 25.85 8,530.50
1671 TYPE D SIGNS, FABRICATION SF 46 21.00 966.00
1672 TYPE E SIGNS, FABRICATION SF 616 13.05 8,038.80
1673 TYPE F SIGNS, FABRICATION SF 270 12.50 3,375.00
1723 OVRLYS FOR 'A'&'B'SIGNS SF 156 14.75 2,301.00
1675 MILEMARKERS, FABRICATION SF 12 21.25 255.00
1681 REINF CL A CONC FOOTINGS CY 50 591.14 29,557.20
1682 PLN CL A CONC FOOTINGS CY 26 625.19 16,255.00
1677 BREAKAWAY STL BM SUPPORT LB 52,981 2.90 153,754.45
1678 SIMPLE STL BM SUPPORTS LB 5,781 2.55 14,755.30
1679 3# STEEL U-CHANNEL POSTS LF 40,417 6.62 267,651.00
1680 2# STEEL U-CHANNEL POSTS EA 50 31.36 1,568.00
1663 TYPE A SIGNS, ERECTION EA 30 464.68 13,940.40
1664 TYPE B SIGNS, ERECTION EA 72 362.29 26,085.20
1666 TYPE D SIGNS, ERECTION EA 114 139.74 15,930.62
1667 TYPE E SIGNS, ERECTION EA 1,592 78.87 125,570.04
1668 TYPE F SIGNS, ERECTION EA 241 130.11 31,356.78
1674 MILEMARKERS, ERECTION EA 50 28.40 1,420.00
1707 OVERHEAD SIGN ASSEMBLY ** LS 23 31,736.48 729,939.00
1714 LITE SYS OVERHD SIGN ** LS 23 5,172.52 118,968.00
1732 R&D SIGNS ON 1 SUPPORT EA 19 113.58 2,158.00
1735 R&D SIGNS ON 2 SUPPORTS EA 45 108.93 4,901.70
1738 R&D SUPPORTS EA 193 63.74 12,301.40
1740 REMV & DISPL OF FOOTINGS EA 193 214.39 41,378.20
1746 R&STK SIGNS MOUNTED ON'U' EA 27 40.34 1,089.25
1753 R&D U CHNNEL POSTS EA 33 25.06 827.00
1756 R&D MILEMARKERS & POSTS EA 18 10.55 190.00
1757 R&D OVERHD SIGN ASSEMBLY EA 3 2,333.33 7,000.00
1727 R&D OF OVRHD SIGNS EA 1 560.00 560.00
1763 ATT OVRHD SIGN/OVERHD STR EA 16 356.25 5,700.00
1765 ADJUST SIGNS ON OVRHD ASM EA 3 400.00 1,200.00
1719 ATT OVERLAYS OVERHD SIGNS EA 7 220.00 1,540.00
1722 ATT OVERLAYS 'A'&'B' SIGN EA 7 101.43 710.00
1726 ERECT SIGNS ON NEW SUPP EA 38 330.00 12,540.00
1728 ERECT SIGNS ON NEW U-CHNL EA 19 155.53 2,955.00
2037 WORK ZONE SIGNS (FIXED) SF 26,089.52 10.32 269,391.00
2153 WORK ZONE SIGNS (PORTABLE SF 13,455 12.86 173,066.18
2047 WORK ZONE SIGNS (BARRICDE SF 4,460 8.59 38,315.90
2155 FLASHING ARROW PNL TYPE C EA 66 4,415.01 291,390.48
2146 CHANGEABLE MESSAGE SIGNS EA 38 16,834.21 639,700.00
2152 DRUMS EA 11,883 47.58 565,460.00
2161 WARNING FLAGS EA 266 31.09 8,270.90
2159 CONES EA 2,937 26.01 76,393.60
2040 BARRICADES (TYPE III) LF 8,942 15.16 135,598.71
2163 FLAGGER HR 38,080 15.96 607,975.00
2164 FLAGGER DAY 3,044 143.79 437,710.00
2154 WARNING LIGHTS (TYPE B) EA 72 387.33 27,887.92
2133 TEMPORARY CRASH CUSHIONS EA 67 11,516.42 771,600.00
2135 RESET TEMP CRASH CUSHION EA 77 2,507.79 193,100.00
2137 TRUCK MTD IMP ATTN 45 MPH EA 59 6,689.45 394,677.70
2145 TRUCK MTD IMP ATTN 60 MPH EA 2 17,500.00 35,000.00
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 23
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
2058 PORT CONC BARRIER LF 105,425 12.54 1,322,362.50
2069 PORT CONC BARRIER(ANCHRD) LF 7,800 29.13 227,250.00
2059 PORT CONC BARRIER(DRAINGE LF 20,000 18.55 371,000.00
2061 RESET PORT CONC BARRIER LF 256,835 4.22 1,083,230.00
2075 RESET PORT CONC BARR,ANCH LF 6,300 16.75 105,500.00
2166 POLICE HR 329 35.28 11,607.00
2132 TUBULAR MARKERS, FIXED EA 150 32.00 4,800.00
2177 TEMP COVERING OF GM SIGNS EA 39 40.00 1,560.00
2178 BACKFILL MATERIAL LF 1,500 10.00 15,000.00
2149 CHANGEABLE SIGNS, SF EA 2 500.00 1,000.00
2148 TEMP CRASH CUSHN, SF EA 6 900.00 5,400.00
2088 TAPE PVMT MARKINGS 4"W LF 95,652 1.42 136,175.90
2094 TAPE PVMT MARKINGS 8"W LF 8,100 2.20 17,820.00
2099 TAPE PVMT MARKINGS 24"W LF 140 19.08 2,672.00
2091 TAPE PVMT MARKINGS 4"Y LF 86,002 1.24 106,680.90
2114 TAPE SYMBOL LT ARR W EA 21 224.00 4,704.00
2117 TAPE SYMBOL RT ARR W EA 6 224.00 1,344.00
2120 TAPE SYMBOL STR ARR W EA 44 159.68 7,026.00
2126 TAPE SYMBOL STR & RT W EA 9 380.00 3,420.00
2025 RAISED MRKRS YELLOW EA 2,830 5.20 14,731.00
2018 RAISED MRKRS CRYSTAL EA 5,285 4.72 24,946.00
2020 RAISED MRKRS CRY & RED EA 8,916 5.15 45,882.50
2021 RAISED MRKRS YEL & YEL EA 9,073 4.31 39,145.10
1710 GRDRAIL DELIN TEMP CRYST EA 478 6.39 3,054.60
2063 GRDRAIL DELIN TEMP YELLOW EA 125 6.00 750.00
1711 BARRIER DELIN TEMP CRYST EA 1,371 7.57 10,374.10
1712 BARRIER DELIN TEMP YELLOW EA 877 7.60 6,666.00
2046 TEMPORARY SBGR LF 16,204.50 5.68 91,995.35
2052 GR ANCHOR TYP ***** TEMP EA 71 726.95 51,613.58
2056 GR ANCHOR TYP BCT-1 TEMP EA 1 1,000.00 1,000.00
1770 4"W THERMO 90 MILS LF 4,060,389 0.31 1,256,124.61
1771 4"W THERMO 120 MILS LF 386,618 0.42 163,332.81
1772 8"W THERMO 90 MILS LF 72,750 0.92 67,050.72
1774 8"W THERMO 120 MILS LF 13,247 1.21 16,010.80
1777 12"W THERMO 90 MILS LF 2,196 3.17 6,960.00
1775 24"W THERMO 120 MILS LF 28,863 4.42 127,701.56
1807 4"Y THERMO LINE 90 M LF 521,350 0.37 191,578.60
1778 4"Y THERMO 120 MILS LF 940,145 0.38 354,456.29
1780 8"Y THERMO 90 MILS LF 9,833 1.34 13,223.18
1781 8"Y THERMO 120 MILS LF 5,709 0.97 5,541.25
1827 TP SYMBOL 'RXR' 120M EA 45 224.89 10,120.00
1830 TP SYMBOL 'SCHOOL' 120M EA 14 271.78 3,805.00
1833 TP MESSGE 'ONLY' 120M EA 88 123.53 10,870.46
1834 TP MESSGE 'LANE' 120M EA 12 75.00 900.00
1836 TP SYMBOL LEFT ARROW EA 1,135 74.86 84,972.62
1839 TP SYMBOL RT ARROW EA 317 68.32 21,658.40
1842 TP SYMBOL STRGHT ARROW EA 735 66.56 48,919.14
1845 TP SYMB STRGHT & LT ARROW EA 99 123.85 12,261.00
1848 TP SYMB STRGHT & RT ARROW EA 461 117.45 54,146.00
1849 TP SYMB LT & RT ARRWO EA 4 145.25 581.00
1850 TP SYMB LT STR RT ARROW EA 11 198.64 2,185.00
1851 TP SYMB RAMP ARROW EA 13 90.02 1,170.26
1854 TP SYMB HANDICAP PARKING EA 1 230.00 230.00
1857 4"W EPOXY LINES LF 147,990 0.55 81,299.00
1858 8"W EPOXY LINES LF 11,250 1.11 12,525.00
1859 24"W EPOXY LINES LF 30 10.00 300.00
1861 4"Y EPOXY LINES LF 102,780 0.59 60,633.00
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 24
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
1864 8"Y EPOXY LINES LF 160 3.22 515.00
1896 EPOXY MSG 'ONLY' EA 4 550.00 2,200.00
1894 EPOXY MSG 'LANE' EA 1 500.00 500.00
1895 EPOXY MSG 'ENDS' EA 1 500.00 500.00
1899 EPOXY SYM LF TURN ARROW EA 11 107.27 1,180.00
1902 EPOXY SYM RT TURN ARROW EA 8 105.00 840.00
1905 EPOXY SYM STRAIGHT ARROW EA 33 112.73 3,720.00
1911 EPOXY SYM STRGHT & RT ARR EA 3 200.00 600.00
1920 4"W COLD PLSTIC LINES LF 1,500 2.40 3,600.00
1922 24"W COLD PLSTIC LINES LF 150 18.00 2,700.00
1924 4"Y COLD PLSTIC LINES LF 400 2.40 960.00
1959 COLD PLSTIC SYMBL 'ONLY' EA 2 270.00 540.00
1962 COLD PLSTIC SYMB LT ARROW EA 12 270.00 3,240.00
1965 COLD PLSTIC SYMB RT ARROW EA 4 270.00 1,080.00
1968 COLD PLSTIC STRAIGHT ARRO EA 15 270.00 4,050.00
1974 COLD PLSTIC STR & RT ARRO EA 2 540.00 1,080.00
2073 PAINT PVMT MARKINGS 4"W LF 2,439,923 0.15 357,774.03
2077 PAINT PVMT MARKINGS 6"W LF 1,800 0.24 432.00
2079 PAINT PVMT MARKINGS 8"W LF 181,266 0.26 47,903.05
2078 PAINT PVMT MARKINGS 12"W LF 24,000 0.54 12,960.00
2085 PAINT PVMT MARKINGS 24"W LF 13,979 1.91 26,770.30
2076 PAINT PVMT MARKINGS 4"Y LF 2,215,383 0.14 320,441.47
2082 PAINT PVMT MARKINGS 8"Y LF 134,931 0.25 33,667.00
2104 PAINT SYMBOL 'RXR' W EA 32 100.94 3,230.00
2107 PAINT MESSGE 'SCHOOL' W EA 1 300.00 300.00
2110 PAINT MESSGE 'ONLY' W EA 20 52.58 1,051.60
2113 PAINT SYMBOL LT ARR W EA 744 33.88 25,208.24
2116 PAINT SYMBOL RT ARR W EA 286 32.43 9,276.50
2119 PAINT SYMBOL STR ARR W EA 607 32.15 19,514.03
2122 PAINT SYMBOL STR & LT W EA 30 56.75 1,702.50
2125 PAINT SYMBOL STR & RT W EA 152 49.17 7,473.50
1994 PAINT SYMBOL LT & RT W EA 11 53.18 585.00
1999 PAINT SYMBOL LT,STR & RT EA 6 58.33 350.00
2100 LINE REMOVAL 4" WIDE LF 415,835 0.41 169,772.25
2102 LINE REMOVAL 8" WIDE LF 14,100 0.82 11,522.00
2129 LINE REMOVAL 24" WIDE LF 466 3.41 1,591.00
2127 SYMBOLS ETC REMOVAL EA 79 40.45 3,196.00
2001 CURING COMP REMOVAL LINES LF 154,268 0.19 29,944.80
2004 CURING COMP REMOVAL SYMB EA 31 49.68 1,540.00
2010 RAISED MRKRS PERM CRY&CRY EA 417 5.98 2,494.00
2013 RAISED MRKRS PERM CRYSTAL EA 8,050 3.90 31,382.45
2016 RAISED MRKRS PERM CRY&RED EA 19,630 4.31 84,608.74
2006 RAISED MRKRS PERM YEL EA 550 3.75 2,062.50
2022 RAISED MRKRS PERM YEL&YEL EA 48,332 3.98 192,642.16
2007 SNO PLOWB MRKS (CRYSTAL) EA 4,330 30.57 132,362.50
2009 SNO PLOWB MRKS (YEL & YEL EA 5,106 32.37 165,266.50
2008 SNO PLOWB MRKS (CRY & RED EA 2,196 42.83 94,059.50
2057 GRDRAIL DELIN PERM CRYS EA 3,641 6.02 21,907.58
2062 GRDRAIL DELIN PERM YELLOW EA 5,581 4.52 25,236.00
1698 BARRIER DELIN PERM CRYST EA 664 7.01 4,652.40
1699 BARRIER DELIN PERM YELLOW EA 252 4.93 1,243.00
2050 GRDRAIL END DELINEATION EA 598 34.10 20,391.96
1695 7' U-CHANNEL POSTS EA 1,284 20.59 26,440.20
1718 FLXBL DELINTR (CRYSTAL) EA 942 14.82 13,958.00
1720 FLXBL DELINTR (YELLOW) EA 802 16.01 12,840.00
1721 FLXBL DELINTR (CRY & RED) EA 88 18.95 1,668.00
1733 FLXBL DELINTR (YEL & RED) EA 35 28.86 1,010.00
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 25
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
2019 OBJECT MARKERS, TYPE 1 EA 19 25.95 493.05
2072 OBJECT MARKERS, TYPE 2 EA 15 60.00 900.00
1703 OBJECT MARKERS, TYPE 3 EA 48 97.42 4,676.00
1704 OBJECT MARKERS, END OF RD EA 70 40.36 2,825.55
1191 100' HIGH MOUNT STANDARD EA 10 12,000.00 120,000.00
1196 PORTABLE DRIVE UNIT EA 1 4,000.00 4,000.00
1200 HIGH MOUNT FOUNDATIONS CY 42 550.00 23,100.00
1204 HM LUMINAIRES *********** EA 40 1,100.00 44,000.00
1203 LITE STD MTLS *********** EA 20 1,260.00 25,200.00
1205 LITE STD MTLT *********** EA 69 1,744.93 120,400.00
1218 STD FOUNDATIONS ********* EA 197 419.31 82,604.00
1221 LITE STD RDW 250W HPS EA 100 300.00 30,000.00
1246 SERVICE POLES *********** EA 1 1,000.00 1,000.00
1250 SERVICE LATERAL ********* LF 100 35.00 3,500.00
1253 LITE CONTRL RW ********** EA 4 9,000.00 36,000.00
1260 ELECT DUCT BD, SIZE ***** LF 17,284 5.46 94,392.70
1261 ELECT DUCT JA, SIZE ***** LF 1,679 15.45 25,947.25
1236 **-#6 W/G FEEDER CIRCUIT LF 520 2.00 1,040.00
1237 **-#4 W/G FEEDER CIRCUIT LF 650 3.00 1,950.00
1239 **-#2 W/G FEEDER CIRCUIT LF 670 3.00 2,010.00
1243 **-#10 W/G FEEDR N *****" LF 240 370.00 88,800.00
1245 **-#6 W/G FEEDR N *****" LF 9,440 7.00 66,080.00
1247 **-#4 W/G FEEDER N *****" LF 10,031 7.39 74,182.50
1249 **-#2 W/G FEEDER N *****" LF 7,020 8.00 56,160.00
1285 ELECT JUNCT BOXES ******* EA 23 1,440.61 33,134.00
1290 PORTABLE LIGHTING LS 10 72,973.00 729,730.00
1484 FND CONDIT MAT CL ******* TON 5,044 18.91 95,368.60
1480 BEDDING MATL, CL ******** TON 5,241 17.85 93,556.00
1483 SELECT BKFL MATL CL II TON 100 20.00 2,000.00
1485 PVMT REPAIR UTILITY WORK TON 2,475.10 109.23 270,352.50
1445 CLASS B CONC ENCASMENT CY 20 130.00 2,600.00
1322 6" DI WATER PIPE ******** LF 185.50 16.39 3,041.20
1325 12"DI WATER PIPE ******** LF 70 30.00 2,100.00
1306 4" DI WATER PIPE PC 350 LF 180 29.64 5,335.00
1307 6" DI WATER PIPE PC 350 LF 3,542 25.91 91,774.80
1308 8" DI WATER PIPE PC 350 LF 2,449 26.78 65,592.00
1310 12" DI WATER PIPE PC 350 LF 24,208 26.00 629,527.00
1311 16" DI WATER PIPE PC **** LF 13,001 35.42 460,545.00
1313 24" DI WATER PIPE PC **** LF 139 95.00 13,205.00
1297 16"DI RES JT WAT P******* LF 80 45.00 3,600.00
1298 DI RES JT FITTNS ******** LB 4,038 2.79 11,275.75
1316 3/4"CU WATER PIPE TYPE ** LF 5,083 11.74 59,664.00
1317 1" CU WATER PIPE TYPE ** LF 386 9.58 3,699.00
1355 2"PVC WATER PIPE ******** LF 795 12.27 9,756.00
1356 4"PVC WATER PIPE ******** LF 838 22.61 18,948.00
1357 6"PVC WATER PIPE ******** LF 7,920 13.40 106,136.00
1358 8"PVC WATER PIPE ******** LF 18,752 18.35 344,176.00
1360 12"PVC WATER PIPE******** LF 3,056 35.15 107,427.00
1362 6" PVC H2O P C900 ** *** LF 1,502 13.59 20,415.00
1363 8" PVC H2O P C900 ** *** LF 3,784 18.23 68,976.00
1364 DI H2O FITTINGS 250# MIN LB 79,465 2.47 195,998.75
1343 3/4"PE WAT TUBN SDR9 **** LF 523 20.26 10,596.50
1344 1"PE WAT TUBING SDR9 **** LF 27 12.00 324.00
1345 1-1/2"PE W TUBN SDR9 **** LF 90 33.00 2,970.00
1368 3/4" CORPORATION STOP EA 147 110.63 16,263.00
1369 1" CORPORATION STOP EA 9 123.33 1,110.00
1370 1-1/2" CORPORATION STOP EA 1 300.00 300.00
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 26
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
1371 2" CORPORATION STOP EA 3 225.00 675.00
1375 3/4" CURB STOP EA 2 80.00 160.00
1397 **" GATE V&VB *****WP EA 13 1,560.81 20,290.50
1398 6" GATE V&VB *****WP EA 85 548.66 46,636.50
1399 8" GATE V&VB *****WP EA 42 810.56 34,043.40
1401 12" GATE V&VB *****WP EA 51 1,366.17 69,674.80
1413 6" TAPN SLVE V&VB *****WP EA 1 1,300.00 1,300.00
1416 12"TAPN SLVE V&VB *****WP EA 1 5,000.00 5,000.00
1419 **X**"TAPN SLVE *****WP EA 3 3,852.40 11,557.20
1422 **"X **" TAPPING SADDLE EA 12 237.50 2,850.00
1421 **"X3/4" TAPPING SADDLE EA 125 225.46 28,182.80
1446 1" AIR RELEASE ASSEMBLY EA 1 330.00 330.00
1447 2" AIR RELEASE ASSEMBLY EA 3 783.33 2,350.00
1449 **" BLOW OFF ASSEMBLY EA 2 850.00 1,700.00
1450 2" BLOW OFF ASSEMBLY EA 9 1,418.33 12,765.00
1424 6" TRANSIT COUPLN ******* EA 18 519.42 9,349.60
1426 8" TRANSIT COUPLN ******* EA 10 688.82 6,888.20
1429 12"TRANSIT COUPLN ******* EA 9 588.89 5,300.00
1431 16"TRANSIT COUPLN ******* EA 1 950.00 950.00
1439 RELOCATE EXIST WAT METER EA 145 361.62 52,435.00
1442 REMOVE EXIST WATER METER EA 6 137.50 825.00
1430 FIRE HYDRANTS, *****WP EA 29 1,320.69 38,300.00
1433 RELOCATE EXIST FIRE HYD EA 48 1,001.37 48,066.00
1436 REMV & STKPL EX FIRE HYD EA 1 450.00 450.00
1488 4" PVC SEWER PIPE, SDR ** LF 100 20.00 2,000.00
1490 8" PVC SEWER PIPE, SDR ** LF 4,670 41.13 192,058.50
1491 10" PVC SEWER PIPE, SDR** LF 267 26.13 6,978.00
1492 12" PVC SEWER PIPE, SDR** LF 1,978 40.27 79,665.00
1494 **"PVC FORCE M SDR******* LF 565 21.20 11,978.00
1497 8"PVC FORCE MN SDR******* LF 2,519 15.00 37,785.00
1501 4" DI SEWER PIPE PC 350 LF 20 33.00 660.00
1503 8" DI SEWER PIPE PC 350 LF 3,041.20 37.74 114,772.00
1504 10" DI SEWER PIPE PC 350 LF 327 26.00 8,502.00
1505 12" DI SEWER PIPE PC 350 LF 106 60.00 6,360.00
1507 18" DI SEWER PIPE PC *** LF 381 72.72 27,705.00
1515 **"DI FORC MAIN PC ***** LF 260 29.60 7,696.00
1574 DI SS PIPE FITNS ******* LB 2,075 4.11 8,538.00
1622 SANITARY SEWER CLEAN-OUT EA 4 200.00 800.00
1581 4'DIA PC SS MH 0-6' EA 63 1,373.04 86,501.70
1600 PC CONC MH WALL 4'D 6'+ LF 322 147.73 47,570.00
1588 SS MH OUTSIDE DROP ASSMBL LF 33 75.00 2,475.00
1644 FIL OR REMV **" PIPE, *** LF 3,481 7.76 27,029.00
1645 FIL OR REMV 6" PIPE, **** LF 3,773 5.20 19,634.50
1646 FIL OR REMV 8" PIPE, **** LF 32,230 7.99 257,523.50
1647 FIL OR REMV 10" PIPE, *** LF 154 7.00 1,078.00
1648 FIL OR REMV 12" PIPE, *** LF 12,861 8.74 112,356.50
1649 FIL OR REMV 16" PIPE, *** LF 2,165 6.00 12,990.00
1604 BRK DN,PLUG & FILL UT MH EA 25 695.80 17,395.00
1613 BREAK DOWN & REBUILD MH EA 14 1,583.43 22,168.00
1616 REMOVE EXISTING MANHOLE EA 6 313.57 1,881.40
1469 12-3/4"NCAS PIPE *****"OC LF 666 43.75 29,137.50
1470 18"STL NCAS PIPE *****"OC LF 220 86.36 19,000.00
1475 12-3/4"NCAS PIPE *****B&J LF 181 150.00 27,150.00
1476 18"STL NCAS PIPE *****B&J LF 600 148.36 89,018.00
1090 TEMPORARY SILT FENCE LF 137,925 2.75 379,423.75
1100 EROS CONTRL STONE CL A TON 750 30.80 23,100.00
1101 EROS CONTRL STONE CL B TON 49,796 22.83 1,137,060.00
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 27
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
1099 SEDIMENT CONTROL STONE TON 25,871 23.04 595,973.35
1084 TEMPORARY MULCHING ACR 1,485.10 369.16 548,240.58
1068 SEED FOR TEMP SEEDING LB 70,350 2.87 201,722.50
1069 FERT FOR TEMP SEEDING TON 282.25 360.22 101,671.95
1085 TEMPORARY SLOPE DRAINS LF 32,225 9.71 312,999.85
1097 INLET PROTCN @ SLOPE DRNS EA 483 180.01 86,945.70
42 SILT EXCAVATION CY 288,845 3.70 1,069,789.00
1059 SYNTHETIC ROVING SY 138,465 1.57 217,781.25
1076 MATTING FOR EROS CONTROL SY 142,749 1.53 218,600.00
1102 1/4" HARDWARE CLOTH LF 38,495 4.38 168,682.00
44 **X**X** CSP T RISER 064" EA 6 1,404.17 8,425.00
45 **X**X** CSP T RISER 079" EA 5 2,111.60 10,558.00
46 **X**X** CSP T RISER 109" EA 7 2,877.43 20,142.00
1096 STILLING BASINS CY 3,230.20 27.53 88,927.16
1079 SELECT TREE REMOVAL, 6" EA 8 75.00 600.00
1080 SELECT TREE REMOVAL, 10" EA 7 100.00 700.00
1081 SELECT TREE REMOVAL, 15" EA 4 125.00 500.00
1082 SELECT TREE REMOVAL, 18" EA 15 150.00 2,250.00
1083 SELECT UNDERGRTH REMOVAL ACR 1 1,480.00 1,480.00
1064 SEEDING AND MULCHING ACR 2,377.58 1,071.81 2,548,310.46
1067 MOWING ACR 869 39.01 33,903.03
1070 SEED FOR REPAIR SEEDING LB 17,025 6.60 112,403.00
1071 FERT FOR REPAIR SEEDING TON 30.95 745.01 23,058.16
1072 SEED FOR SUPP SEEDING LB 47,100 2.40 112,970.00
1074 SODDING SY 27,045 4.87 131,762.50
1075 WATER M/G 152.20 124.33 18,923.00
1077 FERTILIZER TOPDRESSING TON 2,280 192.59 439,111.17
1103 IMPERVIOUS DIKE LF 855 56.16 48,020.00
1104 SPECIALIZED HAND MOWING HR 358.50 35.44 12,706.70
1105 RESPONSE FOR EROS CONTROL EA 268 230.43 61,756.32
2597 GLOSSY ABELIA EA 1,040 16.00 16,640.00
2419 SUGAR MAPLE EA 72 137.50 9,900.00
2423 RIVER BIRCH EA 21 150.00 3,150.00
2525 FLOWERING DOGWOOD EA 2 92.00 184.00
2607 FRUITLAND ELAEAGNUS EA 1,948 15.00 29,220.00
2625 DWARF YAUPON EA 84 15.00 1,260.00
2643 WAXMYRTLE EA 323 15.00 4,845.00
2505 WHITE PINE EA 2 28.00 56.00
2457 SYCAMORE EA 2 64.00 128.00
2485 AMERICAN HOLLY EA 13 77.00 1,001.00
2465 SCARLET OAK EA 31 135.00 4,185.00
2463 NORTHERN RED OAK EA 14 235.00 3,290.00
2513 CANADA HEMLOCK EA 7 129.00 903.00
1092 REFORESTATION ACR 393.70 629.16 247,698.87
2729 MULCH FOR PLANTING CY 6,046 21.92 132,520.75
2731 WATER FOR PLANTING M/G 398 121.82 48,485.00
2732 PLANT BED FUMIGATION SY 52,131 1.55 81,085.70
2738 1 SECT 8" SIG HEAD EA 2 177.00 354.00
2739 1 SECT 12" SIG HEAD EA 10 435.40 4,354.00
2740 3 SECT 8" SIG HEAD EA 2 500.00 1,000.00
2741 3 SECT 12" SIG HEAD EA 461 464.54 214,152.90
2743 4 SECT 12" VERTICL SIG HD EA 17 592.43 10,071.40
2745 4 SECT 12" TEE SIG HEAD EA 52 660.22 34,331.30
2747 5 SECT 12" SIG HEAD EA 66 729.47 48,145.00
2760 INSTL 3 SECT 8" SIG HEAD EA 56 350.00 19,600.00
2761 INSTL 3 SECT 12" SIG HEAD EA 36 294.58 10,605.00
2762 INSTL 4 SECT 8"VERT SIGHD EA 13 400.00 5,200.00
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 28
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
2763 INSTL 4 SECT 12"VERT SIG EA 2 300.00 600.00
2765 INSTL 4 SECT 12"T SIG HD EA 6 378.33 2,270.00
2766 INSTL 5 SECT 8" SIG HEAD EA 3 500.00 1,500.00
2767 INSTL 5 SECT 12" SIG HD EA 6 420.00 2,520.00
2769 RELOC 3 SECT 12" SIG HD EA 16 249.70 3,995.20
2773 RELOC 12"TEE SIGNAL HD EA 1 249.70 249.70
2775 RELOC 5 SECT 12" SIG HE EA 5 249.70 1,248.50
2786 BKPLATE FOR 3 SECT 12"SIG EA 88 144.91 12,752.00
2861 BKPLATE FOR 4 SECT 12"TSI EA 5 140.00 700.00
2863 BKPLATE FOR 5 SECT 12"SIG EA 6 190.67 1,144.00
2865 LOUVER FOR 12" SIG SECT EA 7 191.80 1,342.60
2778 SIG HEAD W/OPTIC PROGR ST EA 4 1,700.00 6,800.00
2780 INSTL SIG HEAD W/OPT SECT EA 2 450.00 900.00
2781 INSTL SIG HEAD W/OPT SECT EA 4 450.00 1,800.00
2866 9" PEDEST SIG HEAD EA 1 899.00 899.00
2867 12" PEDEST SIG HEAD EA 3 932.20 2,796.60
2872 SIGN EA 211 189.69 40,024.10
2873 INSTL SIGN EA 12 100.00 1,200.00
2874 RELOC SIGN EA 7 102.71 719.00
2875 INST ILLUM BLANKOUT SIGN EA 2 2,525.00 5,050.00
2734 12-4 TRAFFIC SIG CABLE LF 1,300 1.80 2,340.00
2735 12-7 TRAFFIC SIG CABLE LF 44,890 1.69 75,870.10
2880 AERIAL COMMUNICAT CABLE LF 30,250 3.55 107,525.00
2878 1/4" MESSENGER CABLE LF 18,520 1.26 23,415.00
2877 3/8" MESSENGER CABLE LF 8,610 1.74 14,988.00
2910 2 PHASE CONTRL & CAB EA 1 7,747.00 7,747.00
2912 2-8 PHASE CONTRL & CAB EA 21 8,226.09 172,748.00
2915 INSTL 2-8 PH CONTRL & CAB EA 63 1,678.86 105,768.00
2917 INST 2-8 PH CONTRL & MOD EA 1 1,250.00 1,250.00
2918 MOD CONTRL & CABINET EA 5 1,316.80 6,584.00
2919 INST ON-ST MASTR CONTRL C EA 4 1,500.00 6,000.00
2922 FOUNDAT FOR CONTRLR CABNT EA 90 449.40 40,446.50
2921 INST BEACON CONTRL ASSEMY EA 1 600.00 600.00
2887 INDUCTIVE LOOP (6'X ***** EA 1 310.00 310.00
2893 INDUCTIVE LOOP (6'X **'QD EA 1 400.00 400.00
2883 INDUCTIVE LOOP (6'X 6') EA 664 339.55 225,459.70
2884 INDUCTIVE LOOP (6'X 15') EA 1 315.00 315.00
2985 INDUCTIVE LOOP (6'X 20') EA 1 613.00 613.00
2897 INDUCTIVE LOOP (6'X 25'QD EA 2 450.00 900.00
2898 INDUCTIVE LOOP (6'X 30'QD EA 5 740.00 3,700.00
2899 INDUCTIVE LOOP (6'X 40'QD EA 138 763.00 105,294.30
2900 INDUCTIVE LOOP (6'X 60'QD EA 331 903.86 299,176.60
2904 LEAD-IN CABLE LF 2,800 1.10 3,080.00
2907 2" PVC CONDUIT LF 26,520 2.26 59,845.60
2908 TRENCHING (UNPAVED) LF 61,335 2.69 165,133.35
2909 TRENCHING (PAVED) LF 3,570 21.49 76,725.00
2902 TWO-CHNL DETECTOR UNIT EA 235 271.18 63,728.40
2749 INSTL 2 CHNL DIG DETECTOR EA 158 50.85 8,035.00
2925 PULL BOX EA 539 214.86 115,809.60
2928 WOOD POLE EA 238 549.98 130,895.20
2926 1" RISER WITH WEATHERHEAD EA 75 260.26 19,519.50
2927 2" RISER WITH WEATHERHEAD EA 312 283.61 88,485.20
2751 GUY ASSEMBLY EA 475 159.03 75,540.60
2871 PEDESTRIAN SIG PEDESTAL EA 1 1,600.00 1,600.00
2929 METAL POLE EA 14 3,945.86 55,242.00
2933 FOUNDATION FOR METAL POLE EA 20 2,313.95 46,279.00
2936 JACKING & BORING LF 170 40.82 6,940.00
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 29
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
2937 OPEN-CUT ON PAVED ROAD LF 160 28.87 4,620.00
2176 MOBILIZATION (STRUCTURES) LS 2 64,250.00 128,500.00
2179 CM&R TEMP STR *********** LS 1 100,000.00 100,000.00
2182 REMV EXIST STR ********** LS 1 7,420.00 7,420.00
2185 REMV EXIST STR ********** LS 15 61,066.67 916,000.00
2191 REMV EXIST STR ********** LS 11 7,262.42 79,886.62
2192 PC RCBC @ STA ********** LS 1 70,915.00 70,915.00
2194 FOUNDATION EXCAVATION CY 4,893 45.84 224,295.00
2203 FND EXCAV B** STA ******* LS 32 9,410.94 301,150.00
2204 **'-**" DRILLD PIER NO RK LF 8,149.97 482.48 3,932,172.00
2205 **'-**" DRILLD PIER IN RK LF 1,987 921.25 1,830,533.00
2206 UNCLASSIFIED STR EXCAV CY 3,725 10.04 37,397.00
2208 CULV EXCAV *********** LS 50 19,272.45 963,622.79
2211 FND CONDIT MAT, BOX CULV TON 4,805.40 28.92 138,963.37
2217 REINF CONCRETE DECK SLAB SF 545,423 15.48 8,441,389.78
2218 REINF CONC DECK SLAB,LTWT SF 42,687 20.00 853,740.00
2219 GROOVING BRIDGE FLOORS SF 525,325 0.35 186,920.05
2221 CLASS AA CONC (BRIDGE) CY 5,016.60 396.90 1,991,069.00
2222 CLASS A CONCRETE (BRIDGE) CY 10,228.90 365.45 3,738,183.54
2228 CLASS A CONCRETE (CULV) CY 11,774.90 315.59 3,715,996.08
2365 BRG APPR SLAB *********** LS 33 22,960.30 757,690.00
2234 REINF STEEL (BRIDGE) LB 3,746,947 0.48 1,801,948.69
2237 EPOXY COAT REINF STL BRDG LB 68,081 0.68 46,049.70
2243 SPIRAL COL REINF STL BRG LB 428,675 0.85 364,214.81
2246 REINF STEEL (CULVERT) LB 1,690,067 0.55 939,191.32
2252 36" PRESTR CONCRETE GIRDR LF 7,452.67 95.89 714,641.66
2253 45" PRESTR CONCRETE GIRDR LF 4,582.76 100.12 458,808.48
2254 54" PRESTR CONCRETE GIRDR LF 33,262.38 102.70 3,416,209.76
2255 STRUCTURAL STEEL LS 7,457,018 0.96 7,186,190.00
2275 TREATED TIMBER PILES LF 3,096 18.00 55,728.00
2278 12" PRESTR CONC PILES LF 5,265 28.87 152,010.00
2281 20" PRESTR CONC PILES LF 1,847.50 55.60 102,725.00
2290 HP12X53 PILES LF 57,722 26.98 1,557,291.00
2303 STEEL PILE POINTS EA 144 75.00 10,800.00
2311 **"X**"PRESTR CON SH PILE SF 8,856 16.35 144,795.60
2338 ONE BAR METAL RAIL LF 685.21 83.27 57,056.06
2341 TWO BAR METAL RAIL LF 1,073.80 55.20 59,273.76
2344 THREE BAR METAL RAIL LF 367.59 139.56 51,300.70
2350 *****"GALV STL PIPE RAIL LF 280 30.00 8,400.00
2353 CONCRETE BARRIER RAIL LF 15,377.50 36.37 559,294.55
2354 CONCRETE MEDIAN BARRIER LF 3,444.56 32.94 113,458.06
2355 1'-**"X*****"CONC PARAPET LF 1,555.90 39.44 61,369.94
2389 4" SLOPE PROTECTION SY 18,579.13 38.45 714,318.20
2361 SURFACE PREP, CLASS I SY 3,912 23.51 91,988.00
2369 SURFACE PREP, CLASS IB SY 443 22.00 9,746.00
2363 SURFACE PREP, CLASS II SY 481 185.78 89,360.00
2364 SURFACE PREP, CLASS III SY 48 613.46 29,446.00
2375 LATEX MOD CONC OVERLAY CY 136.10 822.21 111,903.20
2376 PLACING LATEX MOD CONC SY 3,912 39.71 155,332.00
2382 PLAIN RIP RAP II (2'-0") TON 8,170 36.49 298,165.00
2378 FILTER FABRIC FOR RIP RAP SY 240 4.20 1,008.00
2372 POT BEARINGS LS 3 41,800.00 125,400.00
2374 ELASTOMERIC BEARINGS LS 12 21,544.58 258,535.00
2390 EVAZOTE JOINT SEALS LS 9 53,577.11 482,194.00
2391 STRIP SEALS LS 1 11,950.00 11,950.00
2392 EXPANSION JOINT SEALS LS 1 45,000.00 45,000.00
2393 MODULAR EXP JOINT SEALS LS 1 100,000.00 100,000.00
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 30
ITEM DESCRIPTION UNIT QUANTITY UNIT BID $ AMOUNT
2395 PREFORM COMP JOINT SEALS LS 2 20,000.00 40,000.00
2398 ELEC CONDUIT SYS ******** LS 9 15,444.44 139,000.00
2404 STR DRN SYS ************ LS 3 36,333.33 109,000.00
2407 SELECT BKFILL MAT CL ** TON 560 25.00 14,000.00
2410 3'-0"X 1'-6"PRESTR SLABS LF 782.25 100.00 78,225.00
2413 3'-0"X 1'-9"PRESTR SLABS LF 3,047 76.60 233,400.20
2411 REINF EARTH WALL********* LS 2 340,000.00 680,000.00
MISC. ITEMS NOT INCLUDED IN ABOVE ITEM LIST.
MISC. GRADING 9,192,665.09
MISC. DRAINAGE 2,580,066.33
MISC. PAVING 19,423,169.45
MISC. FENCING 28,790.80
MISC. BUILDINGS 2,270.00
MISC. LANDSCAPING 1,786,558.54
MISC. SIGNS 469,573.83
MISC. SIGNALIZATN 1,613,299.70
MISC. LIGHTING 199,040.00
MISC. UTILITIES 247,259.30
MISC. CULVERTS 425,870.00
MISC. BRIDGES 3,964,047.72
MISC. OTHER 8,177,115.20
MISC. ELECTRICAL 655,128.80
TOTALS FOR ALL ITEMS IN EACH WORK GROUP.
TOTAL GRADING 75,933,455.91
TOTAL DRAINAGE 18,297,958.62
TOTAL PAVING 199,241,336.40
TOTAL FENCING 721,786.75
TOTAL BUILDINGS 95,641.75
TOTAL LANDSCAPING 11,109,607.29
TOTAL SIGNS 2,181,630.17
TOTAL SIGNALIZATN 4,172,552.65
TOTAL LIGHTING 1,862,270.45
TOTAL UTILITIES 4,642,376.00
TOTAL CULVERTS 6,334,445.18
TOTAL RETAIN WALLS 680,000.00
TOTAL BRIDGES 47,470,043.46
TOTAL OTHER 26,901,569.80
TOTAL ELECTRICAL 9,039,376.72
GRAND TOTAL 408,684,051.15
NORTH CAROLINA DEPARTMENT OF TRANSPORTATION PAGE 31
AVERAGE UNIT BIDS
DIVISION 01
DATE 9701-9712
PROPOS T.I.P. PROJECT COUNTY $ TOTAL JOB FUND THOU$ PROJ DESCRIPTION WORK TYPES AREA CNTY LOCATION
NO/BRK NO. /MILE MILES NO. CD1 CD2 GDPFSLSLURACWB DIVS
***** MAR 1997 *****
16/01 7.0371043 CHOWAN 69,384.12 SUR 63 1.100 2 0 0 S 1 1 3 MAPS 1-4
16/02 7.0821243 HYDE 56,694.53 SUR 25 2.250 2 0 0 S 1 1 8 MAPS 5-6
16/03 7.0911243 MARTIN 528,430.94 SUR 48 11.070 2 0 0 S 1 1 9 MAPS 7-14
16/04 7.0921243 MARTIN 73,676.79 SUR 25 2.900 2 0 0 S 1 1 9 MAPS 15-16
16/05 7.0974043 MARTIN 230,160.37 SUR 85 2.710 2 0 0 S 1 1 9 MAPS 17-22
16/06 7.1321243 TYRRELL 87,535.17 SUR 34 2.600 2 0 0 S 1 1 13 MAPS 23-24
16/07 7.1411243 WASHINGTN 532,821.96 SUR 31 17.100 2 0 0 S 1 1 14 MAPS 25-27
16/08 7.1421243 WASHINGTN 50,693.94 SUR 27 1.900 2 0 0 S 1 1 14 MAPS 28
16/09 7.1473243 WASHINGTN 13,387.09 SUR 33 0.400 2 0 0 S 1 1 14 MAPS 29-30
PROJECT TOTAL = 1,642,784.91 NELLO L. TEER COMPANY
17/01 E-3600 7.0511242 DARE 65,992.05 SUR STP 183 0.360 2 0 0 S 1 1 5 MAP 1
17/02 U-2651 7.0521242 DARE 138,443.60 SUR 31 4.450 2 0 0 S 1 1 5 MAPS 2-20
17/03 U-2651 7.0572642 DARE 2,079.80 SUR 35 0.060 2 0 0 S 1 1 5 MAPS 21
17/04 E-3600 8.2050901 DARE 690,782.15 SUR STP 95 7.300 2 0 0 S 1 1 5 MAPS 22-23
17/05 U-2651 9.8014824 DARE 10,589.00 SUR 30 0.350 2 0 0 S 1 1 5 MAPS 24-25
PROJECT TOTAL = 907,886.60 BARNHILL CONTRACTING C
18/01 7.0611241 GATES 849,583.06 SUR 41 20.900 2 0 0 S 1 1 6 MAPS 1-5
18/02 7.0621241 GATES 156,712.14 SUR 25 6.270 2 0 0 S 1 1 6 MAPS 6-8
18/03 7.1221241 PERQUIMAN 154,967.98 SUR 23 6.700 2 0 0 S 1 1 12 MAPS 9-11
18/04 7.1272041 PERQUIMAN 18,068.08 SUR 100 0.180 2 0 0 S 1 1 12 MAP 12
PROJECT TOTAL = 1,179,331.26 ROSE BROTHERS PAVING C
***** MAR 1997 TOTAL = $3,730,002.77
***** JUL 1997 *****
17/01 F-3303 6.051031 HYDE 1,558,939.30 BRG A 0.025 0 98 0 B 1 1 8 SOUTH DOCK
17/02 F-3303 6.051031 DARE 391,655.70 BRG 0.000 0 98 0 B 1 1 5 NORTH DOCK
PROJECT TOTAL = 1,950,595.00 TIDEWATER CONSTRUCTION
18/01 7.0811231 HYDE 1,048,669.20 SUR 59 17.750 2 0 0 S 1 1 8
PROJECT TOTAL = 1,048,669.20 CAROLINA LANDSCAPING &
***** JUL 1997 TOTAL = $2,999,264.20
***** NOV 1997 *****
13/01 7.0611246 GATES 668,526.72 SUR 42 15.900 2 0 0 S 1 1 6 MAPS 1-2
13/02 7.0621246 GATES 151,981.50 SUR 25 6.100 2 0 0 S 1 1 6 MAPS 3-4
13/03 7.1221246 PERQUIMAN 93,071.00 SUR 25 3.700 2 0 0 S 1 1 12 MAPS 5-6
PROJECT TOTAL = 913,579.22 ROSE BROTHERS PAVING C
***** NOV 1997 TOTAL = $913,579.22