GENERAL CONSTRUCTION PROJECTS
GENERAL PROVISIONS
Revised |
||
| SP1G01 | PROJECT SPECIAL PROVISIONS - General (Heading Only) | |
| SP1G03 | NOTICE TO BIDDERS (Cluster Projects Only) A - (2 Projects) B - (3 Projects) | |
| SP1G04 | CONTRACT TIME AND LIQUIDATED DAMAGES Date of availability ______________________ Completion date _________________________ Liquidated damages $________________ | |
| SP1G05 | CONTRACT TIME AND LIQUIDATED DAMAGES - (Floating Dates of Availability) Date not before ________________or later than____________________ Completion date _________________________ Liquidated damages $________________ A - (Permits) B - (No Permits) | |
| SP1G07 | CONTRACT TIME AND LIQUIDATED DAMAGES - Permits & ICT for Reforestation Date of availability ______________________ Completion date _________________________ Liquidated damages are already set for $200 dollars in the provision A B - (Floating dates of availability) | |
| SP1G10 | CONTRACT TIME AND LIQUIDATED DAMAGES -NO permits Date of availability ______________________ Completion date _________________________ Liquidated damages $________________ | |
| SP1G13 | INTERMEDIATE CONTRACT TIME #1 AND LIQUIDATED DAMAGES Date of availability ___________________ All work, except Reforestation completed by ______________________ Liquidated damages ______________________ A B - (Floating dates of availability) | |
| SP1G14 | INTERMEDIATE CONTRACT TIMES (New Provision - "B") | |
| SP1G22 | DELAY IN RIGHT OF ENTRY | |
| SP1G28 | MAJOR CONTRACT ITEMS | |
| SP1G31 | NO MAJOR CONTRACT ITEMS | |
| SP1G34 | NO SPECIALITY ITEMS | |
| SP1G37 | SPECIALITY ITEMS | |
| SP1G40 | SPECIAL REQUIREMENTS FOR WORK IN NATIONAL FOREST | |
| SP1G43 | FUEL PRICE ADJUSTMENT | |
| SP1G49 | PARTNERING | |
| SP1G58 | SCHEDULE OF ESTIMATED COMPLETION PROGRESS | Jun 08 |
| SP1G61 | DISADVANTAGED BUSINESS ENTERPRISES (with Goals) | |
| SP1G67 | MINORITY AND WOMEN BUSINESSES (with goals) | |
| SP1G70 | PROGRESS SCHEDULE - All Projects | |
| SP1G75 | MENTOR-PROTÉGÉ PROGRAM (When requested by the Proposals and Contract Engineer) | |
| SP1G85 | CERTIFICATION FOR FEDERAL-AID CONTRACTS (F.A. Only) | |
| SP1G88 | CONTRACTOR'S LICENSES REQUIREMENTS | |
| SP1G91 | SUBMISSION OF BIDS - Alternates (Use with SP3R36) | Jun 08 |
| SP1G100 | U.S. DEPARTMENT OF TRANSPORTATION HOTLINE (F.A. Only) | |
| SP1G103 | SUBMISSION OF RECORDS - FEDERAL-AID PROJECTS (BRZ Projects only) | |
| SP1G112 | SUBSURFACE INFORMATION (Is not available) | |
| SP1G115 | SUBSURFACE INFORMATION (Roadway only) | |
| SP1G118 | SUBSURFACE INFORMATION (Structures only) | |
| SP1G119 | SUBSURFACE INFORMATION (Roadway & Structures) | |
| SP1G121 | PAYMENTS FOR MATERIALS - PORTABLE CONCRETE BARRIER | |
| SP1G124 | PAYMENTS FOR MATERIALS - REMOVABLE PAVEMENT MARKING MATERIAL | |
| SP1G125 | MAINTENANCE OF THE PROJECT - All Projects | |
| SP1G133 | COOPERATION BETWEEN CONTRACTORS | |
| SP1G140 | CONTRACTOR CLAIM SUBMITTAL FORM | Sept 08 |
| SP1G142 | BID DOCUMENTATION | |
| SP1G145 | TWELVE MONTH GUARANTEE - TIP Projects ONLY | |
| SP1G150 | OUTSOURCING OUTSIDE THE USA | |
| SP1G151 | ACT OF GOD | |
| SP1G180 | EROSION & SEDIMENT CONTROL STORMWATER CERTIFICATION (without LDs) | SP1G181 | PROCEDURE FOR MONITORING BORROW PIT DISCHARGE |
ROADWAY PROVISIONS
| SP1R01 | PROJECT SPECIAL PROVISONS - Roadway (Heading only) | |
| SP2R01 | CLEARING AND GRUBBING - Method "II" | |
| SP2R02 | CLEARING AND GRUBBING - Method "III" | |
| SP2R05 | BURNING RESTRICTIONS | |
| SP2R10 | DEMOLITION OF BUILDINGS AND APPURTENANCES | |
| SP2R15 | BUILDING AND UNDERGROUND STORAGE TANK REMOVAL | |
| SP2R18 | EMBANKMENTS (Use with Drilled Piers, Piles, Signal Poles, On Signs, HM Lights) | |
| SP2R30 | TEMPORARY DETOURS (Onsite detours) | Apr 08 |
| SP2R31 | TEMPORARY DETOURS (Onsite detours with lump sum grading) | Apr 08 |
| SP2R35 | SHALLOW UNDERCUT A - (With undercut 225) B - (With undercut 226) | |
| SP2R40 | FALSE SUMPS (Need plan detail) | |
| SP2R45 | SHOULDER AND FILL SLOPE MATERIAL A -(With lump sum grading) B -(With lump sum grading and borrow excavation) C -(No lump sum grading) |
Apr 08 |
| SP2R57 | BORROW EXCAVATION (TRUCK MEASURMENT) | |
| SP2R58 | BORROW EXCAVATION (IN PLACE OR TRUCK MEASURMENT) | |
| SP2R65 | RESTRICTIONS ON CONSTRUCTION OF EMBANKMENTS | |
| SP2R70 | COAL FLY ASH IN EMBANKMENTS | Apr 08 |
| SP2R75 | EMBANKMENT MONITORING | |
| SP3R01 | REINFORCED CONCRETE TAPERED INLET | |
| SP3R05 | SADDLE BRANCH CONNECTOR | |
| SP3R10 | C.S.SLOTTED DRAIN | |
| SP3R15 | 15" R. C. PIPE TEE DROP INLET | |
| SP3R20 | SEEPS | |
| SP3R30 | FLOWABLE FILL | |
| SP3R33 | PIPE TESTING | |
| SP3R36 | PIPE ALTERNATES (Use with SP1G91) | |
| SP4R01A | REINFORCED BRIDGE APPROACH FILLS | |
| SP4R01B | REINFORCED BRIDGE APPROACH FILLS | |
| SP4R02 | BRIDGE APPROACH FILL - SUB REGIONAL TIER | Sept 08 |
| SP5R03 | AGGREGATE BASE COURSE | |
| SP5R05 | PREPARATION OF SUBGRADE AND BASE (Use with SP6R45) | |
| SP5R15 | AGGREGATE FOR SOIL-CEMENT BASE | |
| SP6R01 | ASPHALT PAVEMENTS SUPERPAVE | |
| SP6R06 | ASPHALT PAVER - FIXED STRING LINE | |
| SP6R07 | ASPHALT PAVER - FIXED AND MOBILE STRING LINE | |
| SP6R15 | ASPHALT BINDER CONTENT OF ASPHALT PLANT MIXES | |
| SP6R20 | ASPHALT PLANT MIXTURES | |
| SP6R25 | PRICE ADJUSTMENT - ASPHALT BINDER FOR PLANT MIX | |
| SP6R45 | FINAL SURFACE TESTING - ASPHALT PAVEMENTS RIDEABILITY (use with SP5R05) | Jun 08 |
| SP6R50 | SEALING EXISTING PAVEMENT CRACKS | |
| SP6R55 | SEALING EXISTING PAVEMENT CRACKS AND JOINTS | |
| SP7R05 | TYING PROPOSED CONCRETE PVMT. TO EXISTING CONCRETE PVMT. | |
| SP7R10 | TYING PROPOSED CONCRETE PVMT. TO PROPOSED ASPHALT PVMT. | |
| SP7R12 | TYING PROPOSED ASPHALT PVMT. TO EXISTING CONCRETE PVMT. | |
| SP7R15 | BEGINNING AND ENDING OF CONCRETE PAVEMENT | |
| SP7R20 | CONCRETE PAVEMENT AND SHOULDERS | |
| SP8R01 | MASONRY DRAINAGE STRUCTURES (Linear Foot) | |
| SP8R02 | SHPO DOCUMENTATION FOR BORROW/WASTE SITES | Apr 08 |
| SP8R10 | MODIFIED CONCRETE FLUME WITH CONCRETE OUTLET | |
| SP8R15 | MODIFIED CONCRETE FLUME WITH FUNNEL OUTLET | |
| SP8R20 | SLUICE GATE | |
| SP8R25 | END WALLS | May 08 |
| SP8R31 | SANDBAG HEADWALL | Sept 08 |
| SP8R35 | GRATES AND FRAME (DRIVEWAY DROP INLET) | |
| SP8R40 | 2'-6" CONCRETE CURB AND GUTTER (SPECIAL) | |
| SP8R45 | CONVERTING EXISTING DROP INLET TO SHOULDER DROP INLET | |
| SP8R50 | CONVERT EXISTING __________ TO _________ | |
| SP8R55 | REMOVE AND STOCKPILE EXISTING GUARDRAIL | |
| SP8R60 | GUARDRAIL ANCHOR UNITS, TYPE M350 | |
| SP8R65 | GUARDRAIL ANCHOR UNITS, TYPE 350 | |
| SP8R69 | CABLE GUIDERAIL (Use with additional guiderail posts) | |
| SP8R75 | IMPACT ATTENUATOR UNITS, TYPE 350 | |
| SP8R85 | TEMPORARY WOVEN WIRE FENCE | |
| SP8R86 | PROJECTS WITH FENCING | |
| SP8R100 | CHAIN LINK FENCING WITH BARBED WIRE ON EXTENSION ARMS | |
| SP8R105 | PREFORMED SCOUR HOLE WITH LEVEL SPREADER APRON | Apr 08 |
| SP8R125 | RETROFITTING WHEELCHAIR RAMPS WITH DETECTABLE WARNINGS RAISED TRUNCATED DOMES | |
| SP9R01 | STREET SIGNS AND ROUTE MARKERS (Existing) | SP9R02 | STEEL U-CHANNEL POSTS | SP9R03 | SHIPPING SIGNS |
| SP10R01 | HIGH STRENGTH CONCRETE FOR DRIVEWAYS | |
| SP10R05 | AGGREGATE PRODUCTION | |
| SP10R10 | CONCRETE BRICK AND BLOCK PRODUCTION | |
| SP10R15 | AGGREGATE FOR ASPHALT PAVEMENTS AND RESURFACING TREATMENTS (ULTRA-THIN) | |
| SP10R16 | PORTLAND CEMENT CONCRETE (Alkali-Silica Reaction) | |
| SP10R35 | GLASS BEADS (Use on projects w/Pavement Markings) | |
| SP10R40 | ENGINEERING FABRIC TABLE 1056-1 (Projects w/Fabric) | SP10R42 | MACRO-SYNTHETIC FIBERS FOR CONCRETE REINFORCEMENT |
| SP10R45 | PAINT SAMPLING AND TESTING | |
| SP10R50 | TEMPORARY PORTABLE CONCRETE BARRIER | |
| SP11R02 | TEMPORARY SHORING | |
| SP11R11 | CHANGEABLE MESSAGE SIGNS | |
| SP12R01 | PAVEMENT MARKING LINES MEASUREMENT & PAYMENT | |
| SP14R01 | COORDINATION OF LIGHTING WORK (Existing & New) | |
| SP16R01 | PERMANENT SEEDING AND MULCHING (incentive payment) | |