DIVISION 4

MAJOR STRUCTURES

This is the Table of Contents for a Microsoft Word document which can be viewed by clicking here: div04e.doc. Click on the section number to see a preview in HTML format. The home page for this document is found here.

SECTION 400 -- TEMPORARY STRUCTURES
400-1.....DESCRIPTION.
400-2.....MATERIALS.
400-3.....PLANS.
(A).....Furnishing Plans:
(B).....Design Requirements for Contractor Furnished Drawings:
400-4.....CONSTRUCTION REQUIREMENTS.
400-5.....COMPENSATION.
SECTION 402 -- REMOVAL OF EXISTING STRUCTURES
402-1.....DESCRIPTION.
402-2.....REMOVAL OF EXISTING STRUCTURE.
(A).....General:
(B).....Requirements for Materials Which Remain the Property of the Department:
(C).....Requirements for Partial Removal:
402-3.....COMPENSATION.
SECTION 410 -- FOUNDATION EXCAVATION
410-1.....DESCRIPTION.
410-2.....MATERIALS.
410-3.....CLEARING AND GRUBBING.
410-4.....FOUNDATION EXCAVATION.
410-5.....COFFERDAMS.
(A).....General:
(B).....Construction:
(C).....Foundation Seals:
(D).....Drawings:
(E).....Removal:
410-6.....PUMPING.
410-7.....PRESERVATION OF CHANNEL.
410-8.....UTILIZATION OF EXCAVATED MATERIAL.
410-9.....BACKFILLING AND FILLING.
410-10.....SUBSURFACE DRAINAGE AT WEEP HOLES.
410-11.....SUBSTRUCTURE SCOUR PROTECTION.
410-12.....BLASTING ADJACENT TO HIGHWAY STRUCTURES.
410-13.....METHOD OF MEASUREMENT.
(A).....Cubic Yard Basis:
(B).....Lump Sum Basis:
410-14.....BASIS OF PAYMENT.
(A).....Cubic Yard Basis:
(B).....Lump Sum Basis:
(C).....Furnishing and Hauling Backfill Material:
(D).....Compensation:
(E).....Pay Items:
SECTION 412 -- UNCLASSIFIED STRUCTURE EXCAVATION
412-1.....DESCRIPTION.
412-2.....CLEARING AND GRUBBING.
412-3.....PRESERVATION OF CHANNEL.
412-4.....UTILIZATION OF EXCAVATED MATERIAL.
412-5.....METHOD OF MEASUREMENT.
412-6.....BASIS OF PAYMENT.
SECTION 414 -- BOX CULVERT EXCAVATION
414-1.....DESCRIPTION.
414-2.....MATERIALS.
414-3.....CLEARING AND GRUBBING.
414-4.....FOUNDATION EXCAVATION.
414-5.....CONDITIONING CULVERT FOUNDATION.
414-6.....PUMPING.
414-7.....UTILIZATION OF EXCAVATED MATERIAL.
414-8.....BACKFILLING AND FILLING.
414-9.....SUBSURFACE DRAINAGE AT WEEP HOLES.
414-10.....METHOD OF MEASUREMENT.
(A).....General:
(B).....Conditioning Culvert Foundation:
414-11.....BASIS OF PAYMENT.
(A).....Excavation:
(B).....Conditioning Culvert Foundation:
(C).....Furnishing and Hauling Backfill Material:
(D).....Compensation:
(E).....Pay Items:
SECTION 416 -- CHANNEL EXCAVATION
416-1.....DESCRIPTION.
416-2.....CONSTRUCTION REQUIREMENTS.
416-3.....METHOD OF MEASUREMENT.
(A).....Cubic Yard Basis:
(B).....Exceptions:
416-4.....BASIS OF PAYMENT.
(A).....Cubic Yard Basis:
(B).....Exceptions:
(C).....Compensation:
(D).....Pay Items:
SECTION 420 -- CONCRETE STRUCTURES
420-1.....DESCRIPTION.
420-2.....MATERIALS.
420-3.....FALSEWORK AND FORMS.
(A).....General:
(B).....Falsework:
(C).....Forms:
.....(1).....General:
.....(2).....Wood Forms:
.....(3).....Steel Forms:
420-4.....REINFORCEMENT.
420-5.....PLACING CONCRETE.
420-6.....PUMPING CONCRETE.
420-7.....SLUMP TESTS.
420-8.....FOUNDATION SEALS FOR COFFERDAMS.
420-9.....PLACING CONCRETE IN COLD WEATHER.
(A).....General:
(B).....Heated Enclosures:
(C).....Insulation:
420-10.....CONSTRUCTION JOINTS.
420-11.....WIDENING EXISTING STRUCTURES.
420-12.....EXPANSION JOINTS.
(A).....General:
(B).....Filled Joints:
420-13.....DRAINS IN WALLS AND CULVERTS.
420-14.....ANCHOR BOLTS AND BEARING AREAS.
(A).....Anchor Bolts:
(B).....Bearing Areas:
420-15.....PLACING AND FINISHING BRIDGE FLOORS.
(A).....Placing Concrete:
(B).....Finishing:
420-16.....CURING CONCRETE.
(A).....General:
(B).....Water Method:
(C).....Membrane Curing Compound Method:
(D).....Polyethylene Sheeting Method:
(E).....Forms-in-Place Method:
420-17.....REMOVAL OF FORMS AND FALSEWORK.
420-18.....SURFACE FINISH.
(A).....General:
(B).....Ordinary Surface Finish:
(C).....Unformed Surfaces Not Subjected to Wear:
(D).....Sidewalk, Islands, or Stairways on Bridges:
(E).....Class 1 Surface Finish:
(F).....Class 2 Surface Finish:
420-19.....PROTECTION OF SUBSTRUCTURE CONCRETE FROM RUST STAINS.
420-20.....PLACING LOAD ON STRUCTURE MEMBERS.
420-21.....METHOD OF MEASUREMENT.
(A).....General:
(B).....Foundation Seal Shown in the Plans:
.....(1).....General:
.....(2).....Seal Concrete:
.....(3).....Footing Concrete:
(C).....Foundation Seal Not Shown in the Plans:
.....(1).....General:
.....(2).....Seal Concrete:
.....(3).....Footing Concrete:
.....(4).....Pier Column Concrete:
(D).....Grooving Bridge Floors:
420-22.....BASIS OF PAYMENT.
SECTION 422 -- BRIDGE APPROACH SLABS
422-1.....DESCRIPTION.
422-2.....MATERIALS.
422-3.....CONSTRUCTION METHODS.
422-4.....COMPENSATION.
SECTION 425 -- FABRICATING AND PLACING REINFORCEMENT
425-1.....DESCRIPTION.
425-2.....MATERIALS.
425-3.....PROTECTION OF MATERIALS.
425-4.....PLACING AND FASTENING.
425-5.....SPLICING.
425-6.....METHOD OF MEASUREMENT.
425-7.....BASIS OF PAYMENT.
SECTION 430 -- ERECTING PRESTRESSED CONCRETE MEMBERS
430-1.....DESCRIPTION.
430-2.....MATERIALS.
430-3.....HANDLING AND STORAGE.
430-4.....METHODS AND EQUIPMENT.
430-5.....BEARINGS AND ANCHORAGES.
430-6.....ERECTION AND INSTALLATION.
430-7.....PAINTING.
430-8.....METHOD OF MEASUREMENT.
430-9.....BASIS OF PAYMENT.
SECTION 440 -- STEEL STRUCTURES
440-1.....DESCRIPTION.
440-2.....MATERIALS AND FABRICATION.
440-3.....DRAWINGS.
440-4.....HANDLING AND STORING MATERIALS.
440-5.....FALSEWORK.
440-6.....BEARINGS AND ANCHORAGES.
440-7.....STRAIGHTENING BENT MATERIAL.
440-8.....FIELD ERECTION.
440-9.....FIELD WELDING.
440-10.....CONNECTIONS USING HIGH STRENGTH BOLTS.
(A).....General:
(B).....Bolted Parts:
(C).....Installation:
.....(1).....Bolt Tensions:
.....(2).....Washers:
.....(3).....Turn-of-Nut Tightening:
.....(4).....Load Indicating Bolts:
.....(5).....Galvanized High Strength Bolts:
(D).....Inspection:
440-11.....PAINTING.
440-12.....SURFACE PREPARATION AND PROTECTION OF UNPAINTED STRUCTURAL STEEL.
440-13.....COMPENSATION.
SECTION 442 -- PAINTING STEEL STRUCTURES
442-1.....DESCRIPTION.
442-2.....MATERIALS.
442-3.....PROTECTION OF WORK.
442-4.....ACCESS TO THE WORK.
442-5.....WEATHER CONDITIONS.
442-6.....MIXING PAINT.
442-7.....PAINT SYSTEMS.
442-8.....SURFACE PREPARATION.
(A).....Blast Cleaning:
(B).....Hand or Power Tool Cleaning:
442-9.....APPLICATION OF PAINT.
(A).....General:
(B).....Spray Application:
442-10.....SHOP PAINTING.
442-11.....FIELD PAINTING.
442-12.....REPAINTING OF EXISTING STEEL STRUCTURES.
(A).....Pollution Control:
(B).....Hazardous Paint Removal:
Waste Handling:
(C).....Health and Safety Responsibility:
442-13.....COMPENSATION.
(A).....No Direct Payment:
(B).....Direct Payment:
(C).....Compensation:
(D).....Payment:
SECTION 445 -- TIMBER STRUCTURES
445-1.....DESCRIPTION.
445-2.....MATERIALS.
445-3.....CONSTRUCTION METHODS.
(A).....Handling and Storing Materials:
(B).....Workmanship:
(C).....Holes for Bolts, Dowels, Rods, and Lag Screws:
(D).....Bolts and Washers:
(E).....Framing:
(F).....Framed Bents:
(G).....Caps:
(H).....Bracing:
(I).....Stringers:
(J).....Wheel Guard and Railing:
(K).....Flooring:
.....(1)..... Plank Floors:
.....(2)..... Two Ply Floors:
.....(3)..... Laminated or Strip Floors:
445-4.....METHOD OF MEASUREMENT.
445-5.....BASIS OF PAYMENT.
SECTION 450 -- BEARING PILES
450-1.....DESCRIPTION.
450-2.....MATERIALS.
450-3.....PREPARATION FOR DRIVING.
(A).....Excavation:
(B).....Clearing and Grubbing:
(C).....Driving Piles Through Embankment:
450-4.....DETERMINATION OF PILE LENGTH.
450-5.....TEST PILES.
450-6.....DRIVING EQUIPMENT.
450-7.....ACCURACY OF DRIVING.
450-8.....CONSTRUCTION REQUIREMENTS.
(A).....General:
(B).....Timber Piles:
(C).....Prestressed Concrete Piles:
(D).....Steel Piles:
(E).....Cast-in-Place Concrete Piles:
450-9.....BEARING VALUE AND PENETRATION.
450-10.....METHOD OF MEASUREMENT.
450-11.....BASIS OF PAYMENT.
(A).....General:
(B).....Cutting Off Piles:
(C).....Pile Cut-Offs:
(D).....Compensation:
(E).....Pay Items:
SECTION 452 -- SHEET PILES
452-1.....DESCRIPTION.
452-2.....MATERIALS.
452-3.....DRIVING EQUIPMENT.
452-4.....ACCURACY OF DRIVING.
452-5.....CONSTRUCTION REQUIREMENTS.
(A).....General:
(B).....Timber Piles:
(C).....Prestressed Concrete Piles:
(D).....Steel Piles:
452-6.....PENETRATION.
452-7.....METHOD OF MEASUREMENT.
452-8.....BASIS OF PAYMENT.
SECTION 454 -- WATERPROOFING AND DAMPPROOFING
454-1.....DESCRIPTION.
454-2.....MATERIALS.
454-3.....METHOD A WATERPROOFING.
(A).....General:
(B).....Preparation of Surface:
(C).....Application:
(D).....Special Requirements:
(E).....Repairs:
(F).....Backfilling:
454-4.....METHOD B WATERPROOFING.
(A).....General:
(B).....Plain Asphalt Plank Protection Course:
(C).....Backfilling:
454-5.....METHOD C DAMPPROOFING.
(A).....General:
(B).....Preparation of Surface:
(C).....Application:
454-6.....METHOD D DAMPPROOFING.
(A).....General:
(B).....Preparation of Surface:
(C).....Application:
454-7.....METHOD OF MEASUREMENT.
454-8.....BASIS OF PAYMENT.
SECTION 460 -- BRIDGE RAILING
460-1.....DESCRIPTION.
460-2.....MATERIALS.
460-3.....CONSTRUCTION METHODS.
(A).....Metal Rail:
(B).....Pipe Rail:
(C).....Concrete Barrier Rail:
460-4.....METHOD OF MEASUREMENT.
(A).....Metal Rail:
(B).....Pipe Rail:
(C).....Concrete Barrier Rail:
460-5.....BASIS OF PAYMENT.
(A).....Metal Rail:
(B).....Pipe Rail:
(C).....Concrete Barrier Rail:
(D).....Compensation:
(E).....Pay Items:
SECTION 462 -- SLOPE PROTECTION
462-1.....DESCRIPTION.
462-2.....MATERIALS.
462-3.....CONSTRUCTION METHODS.
462-4.....METHOD OF MEASUREMENT.
462-5.....BASIS OF PAYMENT.