DIVISION 3

PIPE CULVERTS

This is the Table of Contents for a Microsoft Word document which can be viewed by clicking here: div03e.doc. Click on the section number to see a preview in HTML format. The home page for this document is found here.

SECTION 300 --- PIPE INSTALLATION
300-1.....DESCRIPTION.
300-2.....MATERIALS.
300-3.....UNLOADING AND HANDLING.
300-4.....PREPARATION OF PIPE FOUNDATION.
300-5.....LAYING PIPE.
(A).....Rigid Pipe:
(B).....Flexible Pipe (Except Structural Plate Pipe):
300-6.....BACKFILLING.
300-7.....MAINTENANCE.
(A).....General:
(B).....Cleanout of Existing Pipe:
300-8.....METHOD OF MEASUREMENT.
(A).....General:
(B).....Foundation Conditioning:
.....(1).....Using Local Material:
.....(2).....Using Other Than Local Material:
(C).....Select Material:
(D).....Bedding Material:
300-9.....BASIS OF PAYMENT.
(A).....Foundation Conditioning:
.....(1).....Using Local Material:
.....(2).....Using Other Than Local Material:
(B).....Select Material:
(C).....Bedding Material:
.....(1).....Using Local Material:
.....(2).....Using Other Than Local Material:
(D).....Compensation:
(E).....Pay Items:
SECTION 310 -- CONCRETE PIPE CULVERTS
310-1.....DESCRIPTION.
310-2.....MATERIALS.
310-3.....PIPE INSTALLATION.
310-4.....METHOD OF MEASUREMENT.
310-5.....BASIS OF PAYMENT.
SECTION 315 -- CORRUGATED ALUMINUM ALLOY PIPE CULVERTS
315-1.....DESCRIPTION.
315-2.....MATERIALS.
315-3.....PIPE INSTALLATION.
315-4.....METHOD OF MEASUREMENT.
315-5.....BASIS OF PAYMENT.
SECTION 320 -- CORRUGATED STEEL PIPE CULVERTS
320-1.....DESCRIPTION.
320-2.....MATERIALS.
320-3.....PIPE INSTALLATION.
320-4.....METHOD OF MEASUREMENT.
320-5.....BASIS OF PAYMENT.
SECTION 322 -- CORRUGATED STEEL PIPE ARCH CULVERTS
322-1.....DESCRIPTION.
322-2.....MATERIALS.
322-3.....INSTALLATION.
322-4.....METHOD OF MEASUREMENT.
322-5.....BASIS OF PAYMENT.
SECTION 324 -- BITUMINOUS COATED CORRUGATED STEEL PIPE CULVERTS
324-1.....DESCRIPTION.
324-2.....MATERIALS.
324-3.....PIPE INSTALLATION.
324-4.....METHOD OF MEASUREMENT.
324-5.....BASIS OF PAYMENT.
SECTION 325 -- CONCRETE LINED CORRUGATED STEEL PIPE CULVERTS
325-1.....DESCRIPTION.
325-2.....MATERIALS.
325-3.....PIPE INSTALLATION.
325-4.....METHOD OF MEASUREMENT.
325-5.....BASIS OF PAYMENT.
SECTION 326 -- BITUMINOUS COATED CORRUGATED STEEL PIPE ARCH CULVERTS
326-1.....DESCRIPTION.
326-2.....MATERIALS.
326-3.....PIPE INSTALLATION.
326-4.....METHOD OF MEASUREMENT.
326-5.....BASIS OF PAYMENT.
SECTION 328 -- CORRUGATED STEEL STRUCTURAL PLATE PIPE AND PIPE ARCH
328-1.....DESCRIPTION.
328-2.....MATERIALS.
328-3.....CONSTRUCTION METHODS.
(A).....Excavation, Bedding, and Backfilling:
(B).....Erection:
(C).....Workmanship:
328-4.....METHOD OF MEASUREMENT.
328-5.....BASIS OF PAYMENT.
SECTION 330 -- CORRUGATED ALUMINUM ALLOY STRUCTURAL PLATE PIPE AND PIPE ARCH
330-1.....DESCRIPTION.
330-2.....MATERIALS.
330-3.....CONSTRUCTION METHODS.
(A).....Excavation, Bedding, and Backfilling:
(B).....Erection:
(C).....Workmanship:
330-4.....METHOD OF MEASUREMENT.
330-5.....BASIS OF PAYMENT.
SECTION 340 -- VITRIFIED CLAY PIPE CULVERTS
340-1.....DESCRIPTION.
340-2.....MATERIALS.
340-3.....PIPE INSTALLATION.
340-4.....METHOD OF MEASUREMENT.
340-5.....BASIS OF PAYMENT.
SECTION 342 -- WELDED STEEL PIPE
342-1.....DESCRIPTION.
342-2.....MATERIALS.
342-3.....PIPE INSTALLATION.
342-4.....METHOD OF MEASUREMENT.
342-5.....BASIS OF PAYMENT.