| SECTION 500 -- FINE GRADING SUBGRADE, SHOULDERS AND DITCHES | ||||
| 500-1.....DESCRIPTION. | ||||
| 500-2.....CONSTRUCTION METHODS. | ||||
| (A).....General: | ||||
| (B).....Preparation of Subgrade: | ||||
| (C).....Compaction of Subgrade: | ||||
| 500-3.....TOLERANCES. | ||||
| 500-4.....PROTECTION OF SUBGRADE. | ||||
| 500-5.....COMPENSATION. | ||||
| SECTION 501 -- LIME TREATED SOIL | ||||
| 501-1.....DESCRIPTION. | ||||
| 501-2.....MATERIALS. | ||||
| 501-3.....LIMITATIONS. | ||||
| 501-4.....EQUIPMENT. | ||||
| (A).....General: | ||||
| (B).....Lime Spreaders: | ||||
| (C).....Water Distribution Equipment: | ||||
| (D).....Mixers: | ||||
| (E).....Compaction Equipment: | ||||
| (F).....Scarifying Equipment: | ||||
| 501-5.....PROTECTION AND SAFETY. | ||||
| 501-6.....PREPARATION OF ROADBED. | ||||
| 501-7.....SCARIFYING. | ||||
| 501-8.....APPLICATION OF LIME. | ||||
| (A).....General: | ||||
| (B).....Slurry Method: | ||||
| (C).....Quicklime: | ||||
| (D).....Hydrated Lime: | ||||
| 501-9.....MIXING. | ||||
| (A).....Primary Mixing: | ||||
| (B).....Preliminary Curing: | ||||
| (C).....Final Mixing and Pulverizing: | ||||
| 501-10.....COMPACTING, SHAPING, AND FINISHING. | ||||
| 501-11.....THICKNESS. | ||||
| 501-12.....FINAL CURING. | ||||
| 501-13.....TRAFFIC...... | ||||
| 501-14.....MAINTENANCE. | ||||
| 501-15.....METHOD OF MEASUREMENT. | ||||
| (A).....Lime Treated Soil: | ||||
| (B).....Lime: | ||||
| 501-16.....BASIS OF PAYMENT. | ||||
| SECTION 510 -- AGGREGATE STABILIZATION | ||||
| 510-1.....DESCRIPTION. | ||||
| 510-2.....MATERIALS. | ||||
| 510-3.....CONSTRUCTION METHODS. | ||||
| (A).....Mixing: | ||||
| (B).....Shaping and Compaction: | ||||
| 510-4.....TOLERANCE. | ||||
| 510-5.....PROTECTION. | ||||
| 510-6.....METHOD OF MEASUREMENT. | ||||
| 510-7.....BASIS OF PAYMENT. | ||||
| SECTION 520 -- AGGREGATE BASE COURSE | ||||
| 520-1.....DESCRIPTION. | ||||
| 520-2.....MATERIALS. | ||||
| 520-3.....METHODS OF PRODUCTION. | ||||
| (A).....General: | ||||
| (B).....Type A Aggregate: | ||||
| (C).....Type B Aggregate: | ||||
| 520-4.....SUBGRADE PREPARATION. | ||||
| 520-5.....HAULING AND PLACING AGGREGATE BASE MATERIAL. | ||||
| 520-6.....SAMPLING, TESTING, AND ACCEPTANCE. | ||||
| (A).....General: | ||||
| (B).....Type A Aggregate: | ||||
| (C).....Type B Aggregate: | ||||
| .....(1).....General: | ||||
| .....(2).....Stockpile: | ||||
| .....(3).....Roadway: | ||||
| (D).....TESTING. | ||||
| 520-7.....CONTRACTOR FURNISHED LABORATORY. | ||||
| 520-8.....SHAPING AND COMPACTION. | ||||
| 520-9.....TOLERANCES. | ||||
| 520-10.....DENSITY DETERMINATION BY NUCLEAR METHODS | ||||
| (A).....Application: | ||||
| (B).....Control Strip: | ||||
| .....(1).....General: | ||||
| .....(2).....Equipment: | ||||
| .....(3).....Compaction: | ||||
| .....(4).....Target Density: | ||||
| (C).....Test Sections: | ||||
| .....(1).....General: | ||||
| .....(2).....Acceptance Requirements: | ||||
| 520-11.....MAINTENANCE. | ||||
| 520-12.....METHOD OF MEASUREMENT. | ||||
| 520-13.....BASIS OF PAYMENT. | ||||
| SECTION 530 -- SOIL TYPE BASE COURSE | ||||
| 530-1.....DESCRIPTION. | ||||
| 530-2.....MATERIALS. | ||||
| 530-3.....PREPARATION OF SUBGRADE. | ||||
| 530-4.....MATERIAL SOURCES. | ||||
| (A).....General: | ||||
| (B).....Department Furnished Sources: | ||||
| (C).....Contractor Furnished Sources: | ||||
| (D).....Substitute Sources: | ||||
| 530-5.....PLACING MATERIAL. | ||||
| 530-6.....MIXING AND COMPACTING. | ||||
| 530-7.....FINAL SHAPING. | ||||
| 530-8.....SAMPLING, TESTING, AND ACCEPTANCE. | ||||
| 530-9.....TOLERANCES. | ||||
| 530-10.....RECONDITIONING. | ||||
| 530-11.....MAINTENANCE | ||||
| 530-12.....METHOD OF MEASUREMENT. | ||||
| (A).....Soil Type Base Material: | ||||
| (B).....Reconditioning Road: | ||||
| 530-13.....BASIS OF PAYMENT. | ||||
| SECTION 535 -- CONDITIONING EXISTING BASE | ||||
| 535-1.....DESCRIPTION. | ||||
| 535-2.....CONSTRUCTION REQUIREMENTS. | ||||
| 535-3.....METHOD OF MEASUREMENT. | ||||
| 535-4.....BASIS OF PAYMENT. | ||||
| SECTION 540 -- PLANT MIXED CEMENT TREATED BASE COURSE | ||||
| 540-1.....DESCRIPTION. | ||||
| 540-2.....MATERIALS. | ||||
| 540-3.....LIMITATIONS. | ||||
| 540-4.....COMPOSITION OF MIXTURE. | ||||
| TABLE 540-1 | ||||
| TOLERANCES FOR JOB MIX FORMULA | ||||
| PORTLAND CEMENT TREATED BASE FROM | ||||
| QUARRY PRODUCTION | ||||
| 540-5.....CONSTRUCTION REQUIREMENTS. | ||||
| (A).....Preparation of Subgrade: | ||||
| (B).....Mixing: | ||||
| .....(1).....General: | ||||
| .....(2).....Batch Type Plant: | ||||
| .....(3).....Continuous Flow Type Plant: | ||||
| (C).....Hauling and Placing: | ||||
| (D).....Compaction: | ||||
| 540-6.....CONSTRUCTION JOINTS. | ||||
| 540-7.....TOLERANCES. | ||||
| 540-8.....CURING. | ||||
| 540-9.....ACCEPTANCE. | ||||
| (A).....Approved Stockpile Production: | ||||
| (B).....Quarry Production: | ||||
| TABLE 540-2 | ||||
| ACCEPTANCE CRITERIA FOR | ||||
| AGGREGATE FOR PORTLAND CEMENT TREATED BASE | ||||
| COURSE FROM QUARRY PRODUCTION | ||||
| 540-10.....TRAFFIC. | ||||
| 540-11.....MAINTENANCE. | ||||
| 540-12.....METHOD OF MEASUREMENT. | ||||
| 540-13.....BASIS OF PAYMENT. | ||||
| SECTION 541 -- ROAD MIXED CEMENT TREATED BASE COURSE | ||||
| 541-1.....DESCRIPTION. | ||||
| 541-2.....MATERIALS. | ||||
| 541-3.....LIMITATIONS. | ||||
| 541-4.....EQUIPMENT. | ||||
| 541-5.....PREPARATION OF SUBGRADE. | ||||
| 541-6.....SPREADING AND MIXING. | ||||
| 541-7.....COMPACTION. | ||||
| 541-8.....CONSTRUCTION JOINTS. | ||||
| 541-9.....TOLERANCES. | ||||
| 541-10.....CURING. | ||||
| 541-11.....TRAFFIC. | ||||
| 541-12.....MAINTENANCE. | ||||
| 541-13.....METHOD OF MEASUREMENT. | ||||
| 541-14.....BASIS OF PAYMENT. | ||||
| SECTION 542 -- SOIL-CEMENT BASE | ||||
| 542-1.....DESCRIPTION. | ||||
| 542-2.....MATERIALS. | ||||
| 542-3.....LIMITATIONS. | ||||
| 542-4.....EQUIPMENT. | ||||
| (A).....General: | ||||
| (B).....Cement Spreaders: | ||||
| (C).....Water Distribution Equipment: | ||||
| (D).....Mixers: | ||||
| (E).....Compaction Equipment: | ||||
| (F).....Scarifying Equipment: | ||||
| 542-5.....PREPARATION OF ROADBED. | ||||
| 542-6.....SCARIFYING. | ||||
| 542-7.....APPLICATION OF CEMENT. | ||||
| 542-8.....MIXING. | ||||
| 542-9.....COMPACTION. | ||||
| 542-10.....FINISHING. | ||||
| 542-11.....THICKNESS. | ||||
| 542-12.....CURING. | ||||
| 542-13.....CONSTRUCTION JOINTS. | ||||
| 542-14.....TRAFFIC. | ||||
| 542-15.....MAINTENANCE. | ||||
| 542-16.....METHOD OF MEASUREMENT. | ||||
| 542-17.....BASIS OF PAYMENT. | ||||
| SECTION 543 -- ASPHALT CURING SEAL | ||||
| 543-1.....DESCRIPTION. | ||||
| 543-2.....MATERIALS. | ||||
| 543-3.....EQUIPMENT. | ||||
| 543-4.....CONSTRUCTION REQUIREMENTS. | ||||
| 543-5.....METHOD OF MEASUREMENT. | ||||
| 543-6.....BASIS OF PAYMENT. | ||||
| SECTION 545 -- INCIDENTAL STONE BASE | ||||
| 545-1.....DESCRIPTION. | ||||
| 545-2.....MATERIALS. | ||||
| 545-3.....GRADATION SAMPLING, TESTING, AND ACCEPTANCE. | ||||
| 545-4.....PLACING AND SHAPING STONE. | ||||
| 545-5.....MAINTENANCE. | ||||
| 545-6.....METHOD OF MEASUREMENT. | ||||
| 545-7.....BASIS OF PAYMENT. | ||||
| SECTION 560 -- SHOULDER CONSTRUCTION | ||||
| 560-1.....DESCRIPTION. | ||||
| 560-2.....MATERIALS. | ||||
| 560-3.....CONSTRUCTION METHODS. | ||||
| 560-4.....METHOD OF MEASUREMENT. | ||||
| (A).....General: | ||||
| (B).....Measured in Original Position: | ||||
| (C).....Truck Measurement: | ||||
| 560-5.....BASIS OF PAYMENT. | ||||