spacer spacer   spacer   spacer   spacer  
Strategic Highway Corridors spacer  
HOME
spacer  
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer   NC DOT icon  NCDOT
  NC Smartlink icon  NCSMARTLINK
  NCgov.com icon  NCGOV
spacer
Strategic Highway Corridors spacer spacer spacer spacer spacer spacer spacer spacer
spacer
open spacer spacer
spacer  SITE NAVIGATION spacer
spacer
spacer spacer spacer
  Overview
spacer
  Concept Development
spacer
  Facility Types
spacer
  Corridor Vision
spacer
  Implementation
spacer
  Corridor Descriptions
spacer
  Studies & Projects
spacer
  Questions & Comments 
spacer
  Documents
spacer
  Links
spacer
  Statewide Trans. Plan
spacer
  Trans. Planning Home
spacer spacer
spacer
spacer
spacer
spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer
  HOME > STUDIES & PROJECTS > US 64-NC 49 CORRIDOR STUDY > STUDY CONCLUSIONS > NO-BUILD ALTERNATIVE
spacer
spacer spacer

US 64-NC 49 Corridor Study

No-Build Alternative

The No-build Alternative serves as the baseline or benchmark against which the Build Alternatives are evaluated. Typically, a No-build Alternative is defined as an alternative that incorporates "planned" improvements that are included in the fiscally constrained long-range plan, or more conservatively, only "committed" improvements such as those in the state DOT's transportation improvement program (TIP) or local agency's capital improvement program (CIP). However, the US 64-NC 49 Corridor Study is evaluating the compilation of all of the currently "planned" and "committed" improvements to US 64 and NC 49 as an investment alternative. Therefore, for the purposes of this study, the No-build Alternative is defined as only the "existing" facility, which consists of the present physical and operational condition of the facility, plus those improvements that were under construction at the time of the analysis.

No-Build Alternative - Number of Lanes

Click to Enlarge in New Window
No-Build Alternative (PDF - 573 KB)


spacer spacer
spacer
 
North Carolina DOT Logo    
 
 
spacer