
Problem Statement
A problem statement document was prepared to describe how the US 64-NC 49 Corridor fits into
Strategic Highway Corridors initiative. The document addresses transportation needs in
the corridor on a broad scale, considering the corridor's existing and future role in meeting
the state's regional transportation needs. Specific purposes and uses for the problem
statement include the following:
- Demonstrate how the corridor meets the criteria set forth in Strategic Highway
Corridors initiative.
- Describe the need for improvements to the US 64-NC 49 Corridor as they relate to the
corridor's function as a Strategic Highway Corridor.
- Serve as a preface and supporting documentation for recommended future improvements that
enter NCDOT's project development process and NCDOT's NEPA/404 Merger Process.
- Promote opportunity for early resource agency and stakeholder involvement and input on
concerns regarding future improvements in the corridor.
The problem statement is distinct from project-level purpose and need statements that are
prepared as part of project development activities conducted in compliance with the National
Environmental Policy Act (NEPA) of 1969, as amended. It is part of the transportation
planning process and is not part of a NEPA document for a specific project. The problem
statement helps establish a statewide and regional framework that can shape corridor-level
recommendations for future projects and can influence individual projects' purpose and need
statements and criteria for alternative evaluation. The information from this document and
the results of the corridor study can be incorporated into planning and environmental documents
and purpose and need statements associated with future project-level improvements that may be
proposed by NCDOT or other entities.
Download the Problem Statement (14.3 MB).
|