Download the QPL
Download QPL
The list may be updated once a month during the first week of the month.
Always make sure you have the lastest copy.
A list can be generated by copying QPL information directly from the downloaded Excel spreadsheet.
Please list the following information for each equipment or material item.
The project Bid Line Item Number may be typed or legibly hand written.
|