Introduction and Background
AASHTO representatives to the NTPEP subcommittee voted in 1997 to
establish a Work Panel Task Force to develop a draft work plan for
the evaluation of Flashing Arrow Panels (Arrowboards) and Portable
Changeable Message Signs (PCMS). This task force met in Washington,
DC in April, 1998 to discuss and draft a work plan that was
presented at the 1998 NTPEP annual conference held in Nashville, TN.
Members included the NTPEP Coordinator, Mark Alderman, (VA,
Chairman), Jim Kellenberger, (NC), Teresa Lewandowski, (DE), Edward
Paulis (MD), Doug Tomlinson (PA). Input for this draft work plan was
gathered from specifications and general comments submitted from the
AASHTO members. Many of the remaining agency specifications were
located on web-sites or through other research. The final work plan
(see Appendix
A & Appendix
B ), with revisions from the NTPEP Oversight Committee,
was adopted in November 1998. While this final work plan is printed
as one work plan there are actually two work plans contained in the
document, one for Arrowboards and one for PCMS.
The NTPEP Coordinator made this work plan available to Industry
at-large through the American Traffic Safety Services Association (ATSSA)
and solicited vendor interest for Arrowboard and PCMS testing in
December of 1998. Arrowboards and PCMS were provided to NCDOT in
January, 1999 with the winter tests held in February and April of
1999 and the summer tests held in July and August of 1999. Many
logistical and technical obstacles had to be overcome in
implementing the work plan for the first time which are discussed in
the Data Charts section of this report. All Arrowboards and PCMS
tested during the Winter and Summer 1999 cycle were solar powered.
The sight tests described in Section 2 of the work plan for
Arrowboards and PCMS were performed in Wilson, NC at the Wilson
Industrial Airport (see Appendix
C for location specifics). Test sections 3 and 4 of the
work plan for Arrowboards and PCMS were performed in Raleigh, NC at
the NCDOT Equipment Depot.
Every effort has been made in this document to provide an
accurate reflection of information discovered during the
implementation of this work plan for Arrowboards and PCMS. This
information should be very useful for making purchase decisions. A
CD-ROM has been included to allow query and reporting of the data
easier for the NTPEP user.
As a State that strongly supports the NTPEP program, it is
believed that the information contained in this report will be
useful in making decisions about what products or types of products
best suit the purchaser’s needs. While it is never recommended to
buy any device prior to an inspection of the device, it is believed
extended testing by individual agencies can be eliminated by using
the information contained in this report. If an agency has any
specific questions about the data in this report please feel free to
contact Meredith McDiarmid at 919-250-4159.
|
|
Information
Introduction
Work Plan 

Arrowboard
Product Data Sheets
Product Specifications
Product Test Data

PCMS
Product Data Sheets
Product Specifications
Product Test Data

Links
AASHTO
NTPEP
Tennessee
DOT

|
 |