spacer spacer   spacer   spacer   spacer  
Title Header spacer
 
HOME
spacer
 
CONTACT
spacer
spacer  
SEARCH!
spacer
spacer
spacer
  NCDOT icon  NC DOT
  NCDOH icon  NC DOH
  NCgov.com icon  NC GOV
spacer
spacer spacer spacer spacer spacer spacer spacer spacer spacer
 
 
spacer
 
 
spacer
open spacer spacer
spacer ONLINE SERVICES spacer
spacer
spacer spacer spacer
Public Information
spacer
Study Process
spacer
Study Area
spacer
Project Study Team
spacer
Schedule
spacer
Q & A
spacer
What's New
spacer
Contact Us
spacer
spacer spacer
spacer
spacer
spacer
spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer spacer spacer
spacer
  HOME »  STUDY PROCESS »  STEP 4
spacer
spacer spacer  
Step 4 - Prepare A Final Environmental Document


  • Conduct intensive environmental studies on the Least Environmentally Damaging Practicable Alternative (LEDPA)

  • Minimize environmental impacts (Concurrence Point 4)

  • Complete the Preliminary Engineering Design Plans

  • Publish the Final Environmental Document
    The final environmental document will include the purpose and need for the project and summaries of the alternatives analysis, and intensive environmental analyses of the LEDPA. A newsletter will be mailed out announcing the completion of the final environmental document.

  • Review 30% Complete Hydraulic Designs (Concurrence Point 4B)

  • Review 100 % Complete Hydraulic Designs and Permit Drawings (Concurrence Point 4C)

  • Hold the Design Public Hearing
    The Design Public Hearing provides citizens an opportunity to comment on the proposed detailed design of the Least Environmentally Damaging Practicable Alternative.

 

Back to Study Process                             Steps Beyond The Environmental Study Process